Overall Summary: 
A Decision to ratify the planning on Vietnam electricity development in the 2001-2010 period, with the prospect toward 2020 taken into account (called Electricity Planning V).
Access
Energy access priorities: 
The development of power sources must satisfy the [...] load demand, ensuring the safe, qualitative, stable, efficient and rational supply of electricity for socio-economic development.
Renewable Energy
RE action plans: 
To give priority to the building of hydroelectric power plants with integrated benefits such as flood fighting, water supply, electricity production. To develop small-sized hydroelectric power plants, wind power, solar power...in areas far from power grids as well as mountain, border and island regions.
Environment
Energy environmental priorities: 
The balance of power sources must [...]meet the environmental standards and use modern technologies for the new power plants.
Energy-water nexus: 
To give priority to the building of hydroelectric power plants with integrated benefits such as flood fighting, water supply, electricity production. To develop small-sized hydroelectric power plants, wind power, solar power...in areas far from power grids as well as mountain, border and island regions.---Power sources must be structured in compatibility with the practical situation and fuel sources, ensuring the system's exploitation efficacy and characteristics of each locality so as to take initiative in the supply of electricity based on the requirements of socio-economic development and people's daily life in the dry and rainy seasons, including the years when hydroelectric power plants fall short of water as well as the high-demand and low-demand hours, thereby ensuring enough water sources for agriculture and flood fighting when necessary.
Energy Supply and Infrastructure
Infrastructure development priorities: 
To give priority to the building of hydroelectric power plants with integrated benefits such as flood fighting, water supply, electricity production. To develop small-sized hydroelectric power plants, wind power, solar power...in areas far from power grids as well as mountain, border and island regions.---The balance of power sources must take into account projects on the construction with intensive investment and technological renovation of the currently operating plants.
Trade
Energy trade priorities: 
To fully exploit energy sources with economic efficiency [...]..., in combination with the step-by-step reasonable exchange of electricity with regional countries.
Investment
Independent power producers: 
To combine power sources invested in forms of independent power plants (IPP), BOT power plants or joint ventures and exchange electricity with the neighboring countries... in order to supply electricity for each region and the whole electric system.---To ensure that the total capacity of foreign-invested projects in forms of BOT, IPP or joint ventures... account for not more than 20% of the system's maximum capacity.---To encourage domestic and foreign investors to take part in building power source and power distribution projects in the investment forms of independent power plants (IPP), build-operate-transfer (BOT) contracts, build-transfer (BT) contracts, build-transfer-operate (BTO) contracts, joint ventures or joint stock companies...
Investment climate development: 
To ensure that the total capacity of foreign-invested projects in forms of BOT, IPP or joint ventures... account for not more than 20% of the system's maximum capacity.---To encourage domestic and foreign investors to take part in building power source and power distribution projects in the investment forms of independent power plants (IPP), build-operate-transfer (BOT) contracts, build-transfer (BT) contracts, build-transfer-operate (BTO) contracts, joint ventures or joint stock companies...