Meta Data Draft: NoRevision of previous policy?: NoDraft Year: 2014Effective Start Year: 2014Scope: NationalDocument Type: OtherEconomic Sector: EnergyEnergy Types: RenewableIssued by: Government of MalaysiaNotes: Bilingual document Source: Sustainable Energy Development AuthorityFile: Renewable Energy (Amendment of Schedule) Order 2014Overall Summary: The Renewable Energy (Amendment of Schedule) Order 2014 to amend some of the provisions of the Electricity Regulations 2013. Related Documents Other policies that are related to this one. Renewable Energy Act 2011 (Act No. 725 of 2011) Full Document Text 12 Mac 201412 March 2014P.U. (A) 70 WARTAKERAJAANPERSEKUTUAN FEDERAL GOVERNMENT GAZETTE PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014 RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) ORDER 2014 DISIARKAN OLEH/PUBLISHED BYJABATAN PEGUAM NEGARA/ATTORNEY GENERAL’S CHAMBERS AKTA TENAGA BOLEH BAHARU 2011 PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2014 PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta 725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa1. (1) Perintah ini bolehlah dinamakan Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2014. (2) Perintah ini mula berkuat kuasa pada 15 Mac 2014. Pindaan Jadual2. Jadual kepada Akta Tenaga Boleh Baharu 2011 [Akta 725] dipinda dengan menggantikan butiran “Fotovolta suria” dan butiran lain yang berhubungan dengannya dengan butiran yang berikut: RuangPertamaRuang KeduaRuang KetigaRuangKeempatRuangKelima Sumber boleh baharu Perihalan pepasangan tenaga boleh baharu yang layak Kadar tarif galakan (dalam ringgit bagi setiap kilowatt jam)Tempoh berkuat kuasa (bermula dari tarikh permulaan kuat kuasa tarifgalakan) Kadar pengurangan tahunan“Fotovolta suria(a) Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang:Kadar tarif galakan asas (i) sehingga dan termasuk 4 kilowatt (individu)1.018421 tahun10%(ii) melebihi 4 kilowatt, dan sehingga dan termasuk 12 kilowatt (individu)0.993621 tahun10%(iii) sehingga dan termasuk4 kilowatt(bukan individu)1.018421 tahun10% (iv) melebihi 4 kilowatt, dansehingga dan termasuk24 kilowatt(bukan individu)0.993621 tahun10%(v) melebihi 24 kilowatt, dan sehingga dantermasuk 72 kilowatt (bukan individu)0.849621 tahun10%(vi) melebihi 72 kilowatt, dan sehingga dan termasuk 1megawatt(bukan individu)0.820821 tahun10%(vii) melebihi 1 megawatt, dan sehingga dan termasuk 10megawatt(bukan individu)0.684021 tahun10%(viii)melebihi 10 megawatt, dan sehingga dan termasuk 30 megawatt (bukan individu)0.612021 tahun10%(b) Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu kriteria atau lebih yang berikut sebagai tambahan kepada (a) di atas:Kadar tarif galakan bonus sebagai tambahan kepadakadar tarif galakan asas (i) penggunaan sebagaipepasangan dalambangunan atau struktur bangunan+ 0.215321 tahun10%(ii) penggunaan sebagaibahan bangunan+ 0.207021 tahun10%(iii) penggunaan modulfotovolta suria yang dibuat atau dipasang secaratempatan+ 0.0521 tahun0%(iv) penggunaan alat penyongsang suria yang dibuat atau dipasangsecara tempatan+ 0.0521 tahun0%”. Dibuat 7 Mac 2014[KeTTHA (BP)9/14 Klt 5; PN(PU2)693/V] DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILIMenteri Tenaga, Teknologi Hijau dan Air ---RENEWABLE ENERGY ACT 2011 RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) ORDER 2014 IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], the Minister makes the following order: Citation and commencement1. (1) This order may be cited as the Renewable Energy (Amendment of Schedule) Order 2014. (2) This Order comes into operation on 15 March 2014. Amendment of Schedule2. The Schedule to the Renewable Energy Act 2011 [Act 725] is amended by substituting for the item “Solar photovoltaic” and other items relating to it the following items: FirstColumnSecond ColumnThird ColumnFourth ColumnFifthColumn Renewable resource Description of qualifying renewable energy installationFeed-in tariff rate (in ringgit per kilowatthour)Effective period (commencing from thefeed-in tariff commencementdate) Annual degression rate“Solar photovoltaic(a) Renewable energy installation having an installed capacity of:Basic feed-in tariff (i) up to and including 4 kilowatts (individual)1.018421 years10%(ii) above 4 kilowatts, and up to and including 12kilowatts(individual)0.993621 years10%(iii) up to and including4 kilowatts(non-individual)1.018421 years10% (iv) above 4 kilowatts, and up to and including24 kilowatts (non-individual)0.993621 years10%(v) above 24 kilowatts,and up to and including72 kilowatts(non-individual)0.849621 years10%(vi) above 72 kilowatts,and up to and including1 megawatt(non-individual)0.820821 years10%(vii) above 1 megawatt, and up to and including10 megawatts (non-individual)0.684021 years10%(viii) above 10 megawatts, and up to and including30 megawatts (non-individual)0.612021 years10%(b) Renewable energy installation having any one or more of the following criteria in addition to (a)above:Bonus feed-in tariff rate in addition to basic feed-intariff rate (i) use as installation in building or buildingstructures+ 0.215321 years10%(ii) use as buildingmaterials+ 0.207021 years10%(iii) use of locallymanufactured or assembled solar photovoltaic modules+ 0.0521 years0%(iv) use of locallymanufactured or assembled solar inverters+ 0.0521 years0%”. Made 7 March 2014[KeTTHA (BP)9/14 Klt 5; PN(PU2)693/V] DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILIMinister of Energy, Green Technology and Water