Meta Data Draft: NoRevision of previous policy?: YesDraft Year: 2014Effective Start Year: 2015Scope: NationalDocument Type: OtherEconomic Sector: Energy, PowerEnergy Types: Power, Renewable, SolarIssued by: Government of MalaysiaNotes: Bilingual document Source: Sustainable Energy Development Authority (MS&EN)File: Renewable Energy (Amendment of Schedule) (No. 2) Order 2014 (MS&EN)Overall Summary: The Renewable Energy (Amendment of Schedule) (No. 2) Order 2014 amends the Renewable Energy Act 2011, particularly clarifying the wording of the "Small hydropower" and "Solar photovoltaic" items. Related Documents Other policies that are related to this one. Renewable Energy Act 2011 (Act No. 725 of 2011)Renewable Energy (Amendment of Schedule) Order 2015Renewable Energy (Amendment of Schedule) Order (No.2) 2015 Full Document Text 17 Disember 201417 December 2014P.U. (A) 335 WARTAKERAJAANPERSEKUTUAN FEDERAL GOVERNMENTGAZETTE PERINTAH TENAGA BOLEH BAHARU(PINDAAN JADUAL) (NO. 2) 2014 RENEWABLE ENERGY (AMENDMENTOF SCHEDULE) (NO. 2) ORDER 2014 DISIARKAN OLEH/PUBLISHED BYJABATAN PEGUAM NEGARA/ATTORNEY GENERAL’S CHAMBERS AKTA TENAGA BOLEH BAHARU 2011 PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2014 PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa1. (1) Perintah ini bolehlah dinamakan Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No.2) 2014. (2) Perintah ini mula berkuat kuasa pada 1 Januari 2015. Pindaan Jadual2. Jadual kepada Akta Tenaga Boleh Baharu 2011 dipinda dengan menggantikan butiran “Fotovolta suria” dan butiran lain yang berhubungan dengannya dengan butiran yang berikut: RuangPertamaRuang KeduaRuangKetigaRuangKeempatRuangKelimaSumberbolehbaharuPerihalan pepasangan tenaga bolehbaharu yang layakKadartarifgalakan(dalamringgitbagisetiapkilowattjam)Tempohberkuatkuasa(bermuladari tarikhpermulaankuat kuasatarifgalakan)Kadarpengurangantahunan“Fotovoltasuria(a) Pepasangan tenaga boleh baharu yangmempunyai kapasiti terpasang:Kadartarifgalakanasas (i) sehingga dan termasuk 4kilowatt (individu)0.916621 tahun10%(ii) melebihi 4 kilowatt, dansehingga dan termasuk 12kilowatt (individu)0.894221 tahun10% (iii) sehingga dan termasuk 4kilowatt (bukan individu)0.916621 tahun10%(iv) melebihi 4 kilowatt,dan sehingga dan termasuk 24 kilowatt(bukan individu)0.894221 tahun10%(v) melebihi 24 kilowatt,dan sehingga dan termasuk 72 kilowatt(bukan individu)0.722221 tahun15%(vi) melebihi 72 kilowatt,dan sehingga dan termasuk 1 megawatt(bukan individu)0.697721 tahun15%(vii) melebihi 1 megawatt,dan sehingga dan termasuk 10 megawatt(bukan individu)0.547221 tahun20%(viii) melebihi 10 megawatt,dan sehingga dan termasuk 30 megawatt(bukan individu)0.489621 tahun20% (b) Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu kriteriaatau lebih yang berikut sebagai tambahan kepada (a) di atas:Kadartarifgalakanbonussebagaitambahankepadakadar tarifgalakanasas (i) penggunaan sebagaipepasangan dalambangunan atau strukturbangunan+ 0.172221 tahun20%(ii) penggunaan sebagai bahanbangunan+ 0.165621 tahun20% (iii) penggunaan modulfotovolta suria yang dibuatatau dipasang secara tempatan+ 0.0521 tahun0%(iv) penggunaan alatpenyongsang suria yangdibuat atau dipasang secaratempatan+ 0.0521 tahun0%”. Dibuat 4 Disember 2014 [KeTTHA(BP)9/14 Klt. 5;PN(PU2)693/V] DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILIMenteri Tenaga, Teknologi Hijau dan Air --- RENEWABLE ENERGY ACT 2011 RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) (NO. 2) ORDER 2014 IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], theMinister makes the following order: Citation and commencement1. (1) This order may be cited as the Renewable Energy(Amendment of Schedule) (No. 2) Order 2014. (2) This Order comes into operation on 1 January 2015. Amendment of Schedule2. The Schedule to the Renewable Energy Act 2011 is amended by substituting for the item“Solar photovoltaic” and other items relating to it the following items: FirstColumnSecond ColumnThirdColumnFourth ColumnFifthColumnRenewableresourceDescription of qualifyingrenewable energy installationFeed-intariff rate(in ringgitperkilowatthour)Effective period(commencingfrom thefeed-in tariffcommencement date)Annualdegressionrate“Solarphotovoltaic(a) Renewable energy installationhaving an installed capacity of:Basicfeed-intariff (i) up to and including 4kilowatts (individual)0.916621 years10%(ii) above 4 kilowatts,and up to and including12 kilowatts (individual)0.894221 years10%(iii) up to andincluding 4 kilowatts(non-individual)0.916621 years10% (iv) above 4 kilowatts,and up to and including24 kilowatts (non-individual)0.894221 years10%(v) above 24 kilowatts, andup to and including 72kilowatts (non-individual)0.722221 years15%(vi) above 72 kilowatts, andup to and including 1megawatt (non-individual)0.697721 years15%(vii) above 1 megawatt, andup to and including10 megawatts(non-individual)0.547221 years20%(viii) above 10 megawatts, andup to and including30 megawatts(non-individual)0.489621 years20% (b) Renewable energy installationhaving any one or more of thefollowing criteria in addition to(a) above:Bonusfeed-intariff ratein additionto basicfeed-intariff rate (i) use as installation in buildingor building structures+ 0.172221 years20%(ii) use as buildingmaterials+ 0.165621 years20%(iii) use of locallymanufactured orassembled solarphotovoltaic modules+ 0.0521 years0%(iv) use of locallymanufactured orassembled solarinverters+ 0.0521 years0%”. Made 4 December 2014 [KeTTHA(BP)9/14 Klt. 5;PN(PU2)693/V] DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILIMinister of Energy, Green Technology and Water