Meta Data
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
2014
Effective End Year: 
2019
Scope: 
National
Document Type: 
Rule/Regulation
Economic Sector: 
Power
Energy Types: 
Power
Issued by: 
Central Electricity Regulatory Commission
Overall Summary: 
These regulations shall apply in all cases where tariff for a generating station or a unit thereof and a transmission system or an element thereof including communication system used for inter-State transmission of electricity is required to be determined by the Commission. The Regulations address tariff structure, computation of capital structure and capital cost, computation of annual fixed cost, of capacity charges and energy charges, norms of operation and miscellaneous.
Pricing
Energy pricing: 
Tariff in respect of a generating station may be determined for the whole of the generating station or stage or generating unit or block thereof, and tariff in respect of a transmission system may be determined for the whole of the transmission system or transmission line or sub-station or communication system forming part of transmission system.---For the purpose of determination of tariff, the capital cost of a project may be broken up into stages, blocks, units, transmission lines and sub-stations, forming part of the project [...]---The tariff for supply of electricity from a thermal generating station shall comprise two parts, namely, capacity charge (for recovery of annual fixed cost consisting of the components as specified in Regulation 21 of these regulations) and energy charge (for recovery of primary and secondary fuel cost and limestone cost where applicable). (2) The tariff for supply of electricity from a hydro generating station shall comprise capacity charge and energy charge to be derived in the manner specified in Regulation 31 of these regulations, for recovery of annual fixed cost (consisting of the components referred to in regulation 21) through the two charges. (3) The tariff for transmission of electricity on inter-State transmission system shall comprise transmission charge for recovery of annual fixed cost consisting of the components specified in Regulation 21 of these regulations.