Meta Data
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
2016
Scope: 
National
Document Type: 
Other
Economic Sector: 
Energy, Power, Industry, Transport, Building, Multi-Sector, Other
Energy Types: 
Coal, Power, Nuclear, Renewable, Bioenergy, Hydropower, Solar, Wind, Other
Issued by: 
Government of the DPR Korea
Overall Summary: 
The INDC submitted by the DPR of Korea, include adaptation and mitigation strategies and goals to respond to climate change. In particular, the country is committed to unconditionally reduce GHG emissions by 8.0% by 2030 compared to the Intended Nationally Determined Contribution of Democratic People’s Republic of Korea Business as Usual scenario (BAU). The conditional contributions could be increased to 40.25% with international support.
Access
Energy access action plan: 
Strengthen the national integrated electric power management system.---- Complete the flexible electric power transmission system.---To install a total of 1 000MW grid connected solar PV systems
Clean cooking solutions: 
To use biogas from livestock manure and domestic sewage instead of coal or firewood for cooking.---To replace conventional wood stoves for cooking with efficient wood stoves at rural households
Efficiency
EE priorities: 
Improve energy use efficiency and reduce energy consumption.---Encourage the use of energy efficient appliances in the residential sector.---Conserve firewood in residential sector.---Improve energy efficiency and encourage the use of alternative energy in electric power industry
EE targets: 
To reduce power transmission and distribution losses to 6% .---To reduce 25% of energy consumption in industry through technical modernization by 2030
EE action plans: 
In order to make national contribution to mitigation of climate change fair and ambitious in this development context, DPR Korea attaches the mitigation priorities to the energy and industrial sector in where it is possible to pursue synergy with adaptation to climate change, and thus expects to decrease GHG emission per final energy use and GDP. ---Reduce electric power consumption for irrigation water pumping by effective water resource management plans.---Establish and improve standards on energy consumption of major technologies and products.--- Improve the fuel-economics of the vehicles.---Disseminate the technologies for zero-energy, zero carbon architecture.---To use energy-efficient air conditioners and heat pumps instead of coal-fired space heating at households and offices.---To use biogas from livestock manure and domestic sewage instead of coal or firewood for cooking.---To replace conventional wood stoves for cooking with efficient wood stoves at rural households
EE public awareness/promotional programmes: 
Raise public awareness and accelerate participatory process for responding climate change: [...] Strengthen activities for energy conservation such as the May and October Electricity Saving Months
Renewable Energy
RE action plans: 
[...] large or medium and small hydro power stations including the Paektusan Hero Youth Power Station were constructed [...].---Construct eco-friendly large, medium and small scale hydro power station, and improve electric power generating efficiency in hydro power stations.---Build and scale up the power plants based on renewable energy resources.---Generalize off-grid power generating system based on the renewable energy.---To install a total of 1 000MW grid connected solar PV systems.---To build a total of 500MW West Sea off –shore wind farms at the Korean West Sea.--- To build a total of 500MW on-shore wind farms
RE heat obligation/mandate: 
8 To replace coal use for hot water with solar hot water system at households
Environment
Energy environmental priorities: 
Integrating climate change considerations into relevant socio-economic development strategies and plans is considered as one of the important measures to ensure the sustainable development in DPR Korea. Especially in accordance with five-year strategy for national economic development, national energy and climate change issues are simultaneously to be addressed by improving the efficiency of electric power generating facilities and by scaling up the utilization of renewable energy.---Considering the significance of energy issues in ensuring the sustainable development, DPR Korea continue to give national development priority on the work to keep energy production ahead of economic development.
GHG emissions reduction targets: 
With domestic resources, GHG emissions will be reduced by 8.0% by 2030 compared to the Intended Nationally Determined Contribution of Democratic People’s Republic of Korea Business as Usual scenario (BAU). The conditional contributions are measures that could be implemented if additional international financial support, technology transfer and capacity building are received. The national contribution could be increased up to 40.25% with international support.
Pollution control action plans: 
Improve the energy efficiency of technologies and processes in industrial sector
Decarbonization strategy: 
In order to make national contribution to mitigation of climate change fair and ambitious in this development context, DPR Korea attaches the mitigation priorities to the energy and industrial sector in where it is possible to pursue synergy with adaptation to climate change, and thus expects to decrease GHG emission per final energy use and GDP. ---Restrict excessive use of the private transportation by the permitting system of car service by day of the week and a day’s interval.---Disseminate the technologies for zero-energy, zero carbon architecture
Energy-water nexus: 
Reduce electric power consumption for irrigation water pumping by effective water resource management plans
Cooperation in env.: 
When considering the development priorities and adaptation needs in DPR Korea as one of developing countries, international support for developing countries under the Paris Agreement is required to encourage DPR Korea to scale up his mitigation measures to the level contributable to addressing climate change, an international issue on a global scale.---Enhance international cooperation for mitigation of climate change
Energy Supply and Infrastructure
Infrastructure development priorities: 
Strengthen the national integrated electric power management system.---- Complete the flexible electric power transmission system.---To install a total of 1 000MW grid connected solar PV systems.---To build a total of 500MW West Sea off –shore wind farms at the Korean West Sea.--- To build a total of 500MW on-shore wind farms
Technology
Clean energy technology priorities: 
Increase electric power generating efficiency in the existing coal-fired power plants.---- Introduce ultra-high tension transmission technologies.--- [...]uild 2 000MW nuclear power station.---To build the rice husk cogeneration plants
Clean energy technology deployment: 
Increase financial support for mitigation measures: [...] To actively innovate the application of funds and explore new investment and financing mechanisms for low-carbon development
Low-emission and cleaner coal technology: 
To replace the old subcritical coal power stations with ultra-supercritical coal power stations
R&D energy efficiency: 
Improve the energy efficiency of technologies and processes in industrial sector
Technology collaboration with other member States: 
Reinforce joint research, sci-tech knowledge exchange and demonstration activities among scientific research institutions, within the framework of international technical mechanism, for the purpose of promoting climate-related technology dissemination