Meta Data
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
2015
Scope: 
National
Document Type: 
Overarching Policy, Other
Economic Sector: 
Energy, Power
Energy Types: 
Power, Renewable, Bioenergy, Hydropower, Solar, Wave and Tidal, Wind
Issued by: 
Department of Energy (DOE)
Overall Summary: 
Through this policy it was established that at least thirty percent (30%) share of RE in the country’s total power generation capacity should be met through the holistic implementation of the Feed-in Tariff (FIT) System. It also addresses other provisions under the RE Act and its implementing rules and regulations.
Renewable Energy
RE prioritization, portfolio standards: 
To maintain the share of RE in power generation, the DOE hereby adopts a policy of adopting at least 30 percent {30%) share of RE in the country's total power generation capacity through the holistic implementation of the FiT System and other pertinent provisions under the RE Act and RE IRR.---To balance the impact of RE in the grid, the RE Developer of FIT-eligible resources shall be responsible for the nomination and the dispatch of generated power from its generation facilities: Provided, That deviations outside the prescribed range set per FIT-eligible technology, the RE developer shall be responsible for procuring the replacement power.---To ensure the attainment of Section 2 of this Circular, the DOE will use the FIT installation targets. Upon the full subscription of the existing FIT installation targets, the succeeding rounds for the installation targets for FIT-eligible resources shall be made through an auction system to be adopted by the DOE.
RE feed-in tariffs: 
To maintain the share of RE in power generation, the DOE hereby adopts a policy of adopting at least 30 percent (30%) share of RE in the country's total power generation capacity through the holistic implementation of the FiT System and other pertinent provisions under the RE Act and RE IRR.---To balance the impact of RE in the grid, the RE Developer of FIT-eligible resources shall be responsible for the nomination and the dispatch of generated power from its generation facilities: Provided, That deviations outside the prescribed range set per FIT-eligible technology, the RE developer shall be responsible for procuring the replacement power.---To ensure the attainment of Section 2 of this Circular, the DOE will use the FIT installation targets. Upon the full subscription of the existing FIT installation targets, the succeeding rounds for the installation targets for FIT-eligible resources shall be made through an auction system to be adopted by the DOE.
RE public awareness/promotional programmes: 
Pursuant to Rule 10, Section 31 of the RE IRR, the DOE shall implement an intensive and massive lEC activities that are designed to increase public awareness and appreciation of the Guidelines and the RE industry as a whole.
Energy Supply and Infrastructure
Energy mix: 
To maintain the share of RE in power generation, the DOE hereby adopts a policy of adopting at least 30 percent {30%) share of RE in the country's total power generation capacity through the holistic implementation of the FiT System and other pertinent provisions under the RE Act and RE IRR.