Energy supply priorities:
In energy sector, the focus will be meeting the energy demand resulting from high growth in a manner that is timely, adequate, reliable and low-cost. In addition, because of high import dependence in this sector, considering the problems of current account deficit and supply security, domestic and renewable resources will be utilized to the highest possible extent.---[...] the main objective is to reach a competitive energy
system that exploits domestic and renewable energy resources to the extent possible, envisages the use of nuclear technology in
electricity generation, supports reduction of energy intensity of the economy, minimizes waste and environmental effects of energy, strengthens the country’s strategic position in international energy trade.---Adequate emergency supply stocks for oil and natural gas will be created. Salt Lake Natural Gas Underground Storage Project and natural gas storage expansion projects in Thrace will be completed. [...].---Domestic coal resources will be used for electricity generation by private sector, through implementing highly productive and environment friendly technologies.
The lignite reserves of Afşin-Elbistan basin will be utilized for generating electricity. Exploitation of small reserved coal deposits
in the regional energy production facilities will be ensured.---Consistent with the target of reducing foreign dependency on energy production,
oil and natural gas exploration activities will be accelerated both at home and abroad, exploration activities aiming at identifying potential of domestic resources, such as lignite and geothermal, will be increased to the maximum extent. Extensive research activities about shale gas will be
conducted.
Energy mix:
A balanced resource diversification on the basis of primary energy resources and differentiation of origin countries will be ensured, share of domestic and renewable energy resources in the production system will be raised to the maximum extent.
Infrastructure development priorities:
[...] Natural gas transmission and distribution networks will be extended throughout the country and natural gas will be transmitted to the locations where demand arises.---Construction of the first unit of Akkuyu NPP will be substantially completed during the Plan period. In addition, construction of a second NPP’s first unit will be initiated in Sinop. In the Plan period, area identification, pre-feasibility and investment preparations of the third NPP having 5,000 MW will be started.
Cross-border energy infrastructure:
Turkey will be actively involved in gas trade and transmission to Europe, necessary infrastructure will be created to increase the capacity of electricity trade with neighboring countries. TANAP Project will be completed, full integration with ENTSOE system will be ensured and high voltage electricity transmission line projects carried out in collaboration with other neighboring countries will be finalized.
Regional integration priorities:
Turkey will be brought into the position of a transit and terminal country between energy producing and consuming countries through effective utilization of its existing geostrategic location. Efforts will be pursued for transforming Ceyhan into one of the main distribution points in international oil markets and one of the important centers in oil price formation.---To activate collective potential, regional cooperation opportunities in energy, [...]will be fully utilized. In this context, sectoral strategies, joint programs and projects focusing on neighboring region will be prepared.