Overall Summary: 
Following the public consultation process started on 23rd August 2010 and the Public Hearing held on 20th October 2010, Public Utilities Commission of Sri Lanka (PUCSL) is pleased to announce the rates for electricity purchased by the Transmission Licensee; Ceylon Electricity Board (CEB) from Non-conventional Renewable Energy (NCRE) Sources for SPPAs signed on or after 25th November 2010. The tariffs and the SPPA will continue to be standardised and non-negotiable. The tariffs will be cost-based and technology-specific, and the developers have the option of selecting either a three-tier tariff or a flat tariff. The SPPAs will continue to be applicable to projects with a rated generating capacity up to 10 MW, and will be valid for a period of 20 years and extendable by mutual consent.
Renewable Energy
RE feed-in tariffs: 
The tariffs and the SPPA will continue to be standardized. The tariffs will be cost-based and technology-specific, and the developers have the option of selecting either a three-tier tariff or a flat tariff. The SPPAs will continue to be applicable to projects with a rated generating capacity up to 10 MW, and will be valid for a period of 20 years and extendable by mutual consent. Please see the document for further details.