Meta Data
Title in national language: 
Указ Президента Кыргызской Республики от 11 января 1993 года N УП-2 "О приоритетном развитии энергетического комплекса Республики Кыргызстан"
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
1993
Scope: 
National
Document Type: 
Other
Economic Sector: 
Energy, Power, Multi-Sector
Energy Types: 
All, Coal, Oil, Power, Renewable, Hydropower, Solar, Wind
Issued by: 
President of the Kyrgyz Republic
Notes: 
No official English translation available
Overall Summary: 
The main objective of the document is the development of the national energy complex, which includes the electric power industry, coal and oil and gas industry, non-traditional installations, and ensuring the energy independence of the Republic of Kyrgyzstan.---[Russian]: Главная цель документа – развитие национального энергетического комплекса, включающего электроэнергетику, угольную и нефтегазовую промышленность, нетрадиционные установки, и обеспечение энергетической независимости Республики Кыргызстан.
Efficiency
EE priorities: 
2. Determine what the main tasks of the state energy policy of the Republic of Kyrgyzstan for 1993-1994 are: [...] - introduction of energy-saving technologies into the national economy.
Renewable Energy
RE priorities: 
3. Recognize the main future goals of energy politicians: [...] - development of unconventional energy, widespread use of such renewable energy sources like solar, thermal and photovoltaic converters, wind power plants.
Energy Supply and Infrastructure
Energy supply priorities: 
2. Determine what the main tasks of the state energy policy of the Republic of Kyrgyzstan for 1993-1994 are: - reaching the level of annual coal production of at least 3.5 million tons; - an increase of at least three times in oil production at existing wells and commissioning of an oil refinery for 300 thousand tons; - development of a project for the extraction and processing of coal into petroleum products (with wide attraction of foreign investment) in the Kara-Kechensky coal pool; [...] - completion of the construction of the Shamaldy-Sai hydroelectric power station and the conclusion production capacities of the Tash-Kumyr hydroelectric power station up to design; - the conclusion of interstate and intergovernmental agreements and agreements on the legal regime of mountain rivers, ensuring effective electricity production at the republic's hydroelectric power plants; - completion of the construction of a 220 kV power transmission line Balykchy-Naryn and Balykchy-Karakol; - accelerated construction of a 110-voltage power transmission line 35 kV (at least 800 km) and corresponding substations, as well as distribution networks 0.4-10 kV (at least 7500 km); [...]
Infrastructure development priorities: 
2. Determine what the main tasks of the state energy policy of the Republic of Kyrgyzstan for 1993-1994 are: [...] - development of a project for the extraction and processing of coal into petroleum products (with wide attraction of foreign investment) in the Kara-Kechensky coal pool; [...] - completion of the construction of the Shamaldy-Sai hydroelectric power station and the conclusion production capacities of the Tash-Kumyr hydroelectric power station up to design; [...] - completion of the construction of a 220 kV power transmission line Balykchy-Naryn and Balykchy-Karakol; - accelerated construction of a 110-voltage power transmission line 35 kV (at least 800 km) and corresponding substations, as well as distribution networks 0.4-10 kV (at least 7500 km); [...]