Overall Summary: 
The Guideline on Biomass Power Plant Acceptance Test and Performance Assessment for Feed-In-Tariff (FiT) Projects in Malaysia provides assistance to the Feed-in Approval Holder (FiAH) under the biomass installation. This Guideline is useful when preparing the plant performance assessment reporting by the biomass project developers in preparing test report for FiT Commencement Date (FiTCD).
Governance
Energy institutional structures: 
It is the legal responsibility of SEDA Malaysia, the Authority to ensure that all biomass installations approved are designed and constructed in accordance to the international standards and best practices, while meeting minimum national safety standards for the protection of personnel and equipment.