Meta Data
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
2012
Scope: 
National
Document Type: 
Guideline
Economic Sector: 
Power, Other
Energy Types: 
Power, Renewable, Hydropower
Issued by: 
National Environment Commission, Royal Government of Bhutan
Notes: 
Unofficial source
Overall Summary: 
The Environental Assessment Guideline for Hydropower Projects: provides guidance and assistance to various stakeholders involved in the EA process; assists the regulatory agency and EIA practitioners to understand the main areas of concern and use that understanding to enhance the quality of the EIA study and report; informs the regulatory agency and EIA practitioners about the best environmental management practices in the hydropower sector; assists the regulatory agency to better assess the EIA report and arrive at a sound decision.
Environment
Pollution control action plans: 
4.2.11 Air Quality and Noise Management Plan: Some of the air pollution control measures during construction phase of the project are given below. • Transportation of construction material: Covering of trucks/dumpers to avoid spillage; compacted roads, speed control on vehicles and provision for mobile water sprinklers on roads. • The crushers should be fitted with bag filters and have covered unloading points so as to minimize dust emissions. • The chimney height as well as the emission from DG set should meet the national standards. If national standards are not available then any international standards should be followed. • Regular water sprays around the crushing sites, haul road, quarry as well as the dumping sites should be ensured. • Masks should be provided to the workers and staff. • Development of a green belt of suitable width on both sides of road, which acts as wind break and traps fugitive dust.