Meta Data
Title in national language: 
解决弃水弃风弃光问题实施方案
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
2017
Scope: 
National
Document Type: 
Other
Economic Sector: 
Power
Energy Types: 
Power, Hydropower, Solar, Wind
Issued by: 
National Development and Reform Commission
Notes: 
Unofficial translation
Overall Summary: 
The Measures for Resolving Curtailment of Hydro, Wind and PV Power Generation aim to improve the level of renewable energy utilization, and to advance solutions that will achieve practical results in resolving the issue of curtailment of hydro, wind, and PV power generation.
Renewable Energy
RE priorities: 
All administrative areas and relevant agencies are requested to attach great importance to the consumption of renewable electricity, to actively implement the tasks as required by the program, to take effective measures to improve the level of renewable energy utilization, and to advance solutions that will achieve practical results in resolving the issue of curtailment of hydro, wind, and PV power generation
RE targets: 
Yunnan and Sichuan strive to reach 90% utilization rates of hydropower. In Gansu and Xinjiang the curtailment rate of wind should fall to about 30%, and in Jilin, Heilongjiang and Inner Mongolia the curtailment rate of wind should fall to about 20%. In Gansu and Xinjiang the curtailment rate of PV should fall to about 20%, and Shaanxi and Qinghai shall strive to limit curtailment rates of PV to below 10%. In other areas, the annual utilization of wind and PV power generation should reach the minimum guaranteed full-load hours purchased as set by the National Energy Administration for 2016 (or curtailment of wind below 10%, and curtailment of PV below 5%).