Meta Data
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
2017
Scope: 
National
Document Type: 
Rule/Regulation
Economic Sector: 
Power
Energy Types: 
Power, Renewable, Bioenergy, Solar, Wind
Issued by: 
Central Electricity Regulatory Commission
Overall Summary: 
The Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017 provide for terms and conditions and the procedure for determination of tariff of the following categories of Renewable Energy (RE) generating stations: (a) Small Hydro Projects; (b) Biomass Power Projects with Rankine Cycle technology; (c) Non-fossil fuel-based co-generation Plants; (d) Biomass Gasifier based; (e) Biogas based projects.
Renewable Energy
RE feed-in tariffs: 
7. a) Project Specific tariff Project specific tariff, on case to case basis, shall be determined by the Commission for the following types of projects: i. Solar PV and Solar Thermal; ii. Wind Energy (including on-shore and off-shore); iii. Biomass Gasifier based projects; if a project developer opts for project specific tariff; iv. Biogas based projects; if a project developer opts for project specific tariff; v. Municipal Solid Waste and Refuse Derived Fuel based projects with Rankine cycle technology; vi. Hybrid Solar Thermal Power Projects; vii. Other hybrid projects include renewable–renewable or renewable– conventional sources, for which renewable technology is approved by MNRE; viii. Any other new renewable energy technologies approved by MNRE. Determination of Project specific tariff for generation of electricity from such renewable energy sources shall be in accordance with such terms and conditions as stipulated under relevant Orders of the Commission. No annual generic tariff shall be determined for the technologies mentioned in Clause (a) of this Regulation. Financial and Operational norms as may be specified would be the ceiling norms while determining the project specific tariff. Provided that the financial norms as specified under Chapter-2 of these Regulations, except for capital cost, shall be ceiling norms while determining the project specific tariff.