Electricity Rules, 2050 (1993)
Date of Publication 2050.5.1 (17Aug.1993)
1. Electricity ( First Amendment) Rules, 2061. 2064.5.3 ( 20 Aug.2007)
2. Electricity ( Second Amendment) Rules, 2065. 2065.7.4 ( 20 Oct. 2008)
3. Electricity ( Third Amendment) Rules, 2066. 2066.3.23 (7 July 2009)
In exercise ofthe power conferred by the Section 40 of the Electricity Act, 2049 Government of Nepal, has framed the following Rules.
CHAPTER – 1 PRELIMINARY
1. Short Name and Commencement:- (1) These Rules may be called the "Electricity Rules,2050 (1993)"
(2) It shall come into force immediately.
2. Definitions:- Unless the subject or context otherwise requires, in these Rules:-
(a) "Act" means the Electricity Act, 2049.
(b) "Electricity Development Department" means the Electricity Development Department established to act as the electricity development unit under the Ministry of Energypursuant to Section 36 of the Act.
(c) "Secretary" means the Secretary of the Ministry of Energy.
(d) "Survey" means the act of survey relating to the production, transmission ordistribution of electricity and shall also include the acts
relating to feasibility study, detailed engineering design and the works of investigationregarding thereto.
(e) "Production, transmission and distribution of electricity" means the construction, operationand maintenance of structures relating to the production, transmission and distribution ofelectricity.
(f) "Distribution Area" means the area mentioned in the license relating to distribution ofelectricity.
(g) "Wiring" means the installation of electrical de vice for the purpose of supplying of electricityto the house and premises, compound, factory or any other similar places belonging to theconsumers.
(h) " Unit" means the electrical energy to be consumed within one hour if one thousandwatt of electricity is run.
(i) "Energy Meter" means an equipment installed for the purpose of showing the units ofelectricity consumed.
(j) "Earthing" means the work to connect the wire taking it in a fixed depth with the earth forthe purpose of removing any danger to be occurred due to electric energy.
(k) "P1ant" means the total form of equipments, materials and system which cause production,transmission, transformation or distribution of electricity.
CHAPTER – 2
PROVISIONS RELATING TO THE LICENSE
3. Information to be provided: - Any person or corporate body who is interested to conductsurvey, production, transmission or distribution of hydroelectricity of the capacity rangingfrom 100 to 1,000 kilo watt, shall have to provide an information with the followingparticulars to the Secretary through the Electricity Development Department in the format as prescribed inSchedu1e- 1 pursuant to the proviso clause of Section 3 of the Act :-
(a) Detail description of the project,
(b) Map of the project site (main structures must be shown),
(c) Source of water and quantity of water to be utilized,
(d) Area where the electricity is to be distributed and estimated number of consumers to bebenefited from it,
(e) Whether the water resources to be utilized has already been utilized by other or not, ifdone so give the particulars of the same,
(f) Other necessary matters.
4. Application to be submitted to obtain a License to Conduct a Survey of Production ofElectricity: - Any person or corporate body who is interested to conduct a survey ofproduction of electricity shall have to submit an application in triplicate (three copies) stating the following particulars relating to the proposed electricity production project to the Secretary through the Electricity Development Department in the format as prescribedin Schedule- 2:-
(a) Map of the project-site ( in which preliminary sketch of the proposed power- house, dam,reservoir, canal, tunnel, sub- station, transmission line, and village, town, historical places, way etc. inside the project site also should be clearly shown),
(b) Area of water- resources to be surveyed and quantity of water to be utilized,
(c) Estimated amount of cost and time for the completion of project (both the survey andconstruction),
(d) Total capacity of the project and estimate of annual production,
(e) In case the electricity is to be produced through other means except other than waterresources, types of fuel and method of acquiring the fuel should be mentioned,
(f) Other necessary matters.
5. Application to be submitted to obtain a License to Conduct a Survey of Transmission ofElectricity:- Any person or corporate body who is interested to conduct a survey oftransmission of electricity shall ha ve to submit an application in triplicate stating thefollowing particulars relating to the electricity transmission project to the Secretary through theElectricity Development Department in the format as prescribed in Schedule-3:-
(a) Preliminary route-map of electricity transmission line (proposed main transmission line andalternative line also should be shown),
(b) Necessity, purpose and total length of the transmission line,
(c) Standard and capacity of voltage to be used for transmission,
(d) If the electricity is to be supplied at once Maximum load of electricity and types ofconsumers,
(e) Estimated amount of cost and time for the completion of transmission line (both thesurvey and construction),
(f) Other necessary matters.
6. Application to be submitted to obtain a License to conduct a Survey of Distribution ofElectricity:- Any person or corporate body, who is interested to conduct a survey ofdistribution of electricity, shall ha ve to submit an application in triplicate stating thefollowing particulars relating to the electricity distribution project to the Secretary through theElectricity Development Department in the format as prescribed in Schedule- 4:-
(a) Map of the distribution area (in which the geographical description of the said area,present distribution system and preliminary sketch of proposed distribution system alsoshould be clearly shown),
(b) Necessity and purpose of the distribution system,
(c) Estimated number and types of consumers to be benefited from the distribution system,
(d) Point where the electricity is to be purchased or acquired and other particulars relating tosale and distribution,
(e) Estimated amount of cost and time for the completion of construction of distribution line(both the survey and construction),
(f) Other necessary matters.
7. Examination of Application:- ( 1) The Secretary by him/herself or through the ElectricityDevelopment Department shall examine or cause to examine the application received pursuant to Rules 4, 5 or 6 to see whether or not the applicant has submitted the necessary documents, particulars or report to be submitted under the Act and these Rules.
(2) While examining the application pursuant to Sub-rule ( 1), if it is found that theapplicant has not submitted any documents, particulars or report which ought to have beensubmitted, a notice shall be given to the applicant within fifteen days from the date ofsubmission of the application specifying a reasonable time- limit to submit such documents, particulars or report.
(3) In case the Electricity Development Department gives notice specifying the time- limit to submit any document, particulars or report pursuant to Sub-rule (2), the date, whensuch matter is received, shall be deemed as the date of submission of application for thepurpose of Sub- section (2) of Section 4 of the Act.
8. To Issue License for Survey:- The Secretary, after making necessary examination on theapplication received pursuant to Rules 4, 5 or 6, shall issue the license to the applicant inaccordance with the request of applicant or making necessary amendment in the format asprescribed in Schedules 5( A), 5( B) or 5(C) respectively for the survey of production,transmission or distribution of electricity.
9. To Issue a License for Survey at the Same Time:- If any person or corporate body desiringto conduct a survey of production, transmission or distribution of electricity relating to asingle project submits application stating all the particulars pursuant to Rules 4, 5 or 6, theSecretary, subject to the other provisions of these Rules, may issue the licenses at the sametime to such applicant permitting him/her to conduct the survey of production, transmissionor distribution of electricity.
10. Survey Report to be Submitted:- The person or corporate body who obtains a license pursuant to Rules 8 or 9 shall have to submit the report of survey in triplicate to the ElectricityDevelopment Department within Thirty days from the date of completion of work.
11. License for Survey not to be Issued in Duplicity:- In order to avoid duplicity in works nolicense shall be issued to any person or corporate body for conducting a survey for the samework in the same area for a period as specified in the license for survey issued pursuant toRules 8 or 9.
12. Application to be submitted to Obtain a License for Production of Electricity:- Any personor corporate body who is interested to produce electricity shall have to submit an application in triplicate stating the following particulars relating to the proposed electricity production project to the Secretary through the Electricity Development Department in theformat as prescribed in Schedule- 6:-
(a) Detail description of the project ( including a map of the project-site, source of electricityto be produced, estimated cost and time to complete the project, name of partners in theproject and types of their association, full name and address of the person orcorporate body and its directors with whom the ownership of the project shall be vestedat last, should be clearly shown),
(b) If mineral fuel is to be used to produce the electricity, types of fuel, method of its supplyand its storage system should be shown and agreement or letter of intention, if any andrelating documents thereto should be submitted,
(c) Analysis of feasibility ( technical description together with the detail map of the projectand economic analysis, description of clients and consumers, estimated quantity ofelectricity to be sold, if any transmission or distribution system belonging to otherperson or corporate body is to be used in supplying the electricity description of thesame),
(d) Mode of finance (estimated cost of the project, economic condition of the investors ofthe project, commitment of the financial institutions to be involved directly in theproject, and percentage of liability, share capital and debt of the investors),
(e) Acquisition or utilization of house and land ( landowners' description and total area ofthe public or private land to be required for the project for utilization or acquisitiontemporarily or permanently),
(f) Environment Impact Assessment (measures to be taken to minimize the adverse affect dueproject on environment, social and economic effect of project on the said area,utilization of local labour, source and materials, benefits to be taken by the local peopleafter the completion of the project, training to be provided for local people in relation to construction, maintenanceand operation, facilities to be required for construction site, safety arrangements and effect onlandowners due to operation of the project, details of people to be evacuated and necessaryplan for their rehabilitation also should clearly be shown),
(g) Description regarding sale and purchase of electric power of the project (agreement or letter ofintension if any and related documents thereto also should be enclosed).
(h) Description relating to produced electricity transmission line of the project,
(i) Description relating to supply, transportation and storage of the fuel ( if there is anyagreement or letter of intention and other documents relating to the same, the copyshould be enclosed),
(j) Other necessary matters.
13. Application to be submitted to obtain a license for Transmission of Electricity:- Any personor corporate body, who is interested to transmit the electricity, shall ha ve to submit an application in triplicate stating the following particulars relating to the proposed electricitytransmission project to the Secretary through the Electricity Development Department in the format as prescribed in Schedule- 7:-
(a) Detail description of the project (source of electricity to be transmitted, estimated cost and time to complete the project, name of partners in the project and types of their association,full name and address of the person or corporate body and its directors with whom theownership of the project shall be vested at last should be clearly shown),
(b) Route-map of the transmission line and sub-stations to be required for transmission, right-of-way to be required and single line diagram,
(c) Standard transmission- voltage, transmission-capacity, standard of construction, size ofwire and its distance to each other, kinds of poles and insulators and detailed maprelating to the construction,
(d) Analysis of feasibility (technical description and economic analysis of the project, if theelectricity is to be supplied at once description of clients and consumers, estimated quantity of electricity to be sold, and if any transmission or distribution systembelonging to other person or corporate body is to be used in supplying the electricity, description of the same),
(e) Mode of finance (estimated cost of the project, economic condition of the investors ofthe project, commitment of the financial institutions to be involved directly in theproject, and percentage of liability, share- capital and debt of the investors),
(f) Acquisition or utilization of house and land ( land-owners' description and total area ofthe public or private land to be required for the project for utilization or acquisitiontemporarily or permanently),
(g) Analysis of environmental effect (measures to be taken to minimize the adverse affect dueto project on environment, social and economic effect of project on the said area,utilization of local labour, source and materials, benefits to be taken by the local peopleafter the completion of the project, training to be provided for local people in relation toconstruction, maintenance and operation, facilities to be required for construction site, safetyarrangements and effect on landowners due to operation of the project, details of people tobe evacuated and necessary plan for their rehabilitation also should be clearly shown),
(h) Description regarding sale and purchase of electric power of the project ( if there is anyagreement or letter of intention and related any other documents relating to the same thecopy should be enclosed),
(i) Map showing the other structures relating to electricity within the periphery of one andhalf kilometers of the transmission line,
(j) Other necessary matters.
14. Application to be submitted to obtain a License for Distribution of Electricity:- Any personor corporate body, who is interested to distribute the electricity, shall have to submit anapplication in triplicate stating the following particulars relating to the proposed electricity distribution project to the Secretary through, the Electricity DevelopmentDepartment in the format as prescribed in Schedule- 8:-
(a) Detail description of the project (source of electricity to be distributed, estimated cost and time to complete the project, name of partners in the project and types of their association,full name and address of the person or corporate body and its directors with whom theownership of the project shall be vested at last should be clearly shown),
(b) Analysis of feasibility (technical description and economic analysis of the project,estimated quantity of electricity to be sold, and if any transmission or distribution systembelonging to other person or corporate body is to be used in supplying theelectricity, description of the same),
(c) Mode of finance (estimated cost of the project, economic condition of the investors ofthe project, commitment of the financial institutions to be involved directly in theproject, and percentage of liability, share capital and debt of the investors),
(d) Map of the distribution area (geographical description, present distribution system anddistribution system to be newly constructed of that area),
(e) Standard of the distributing voltage and standard of construction,
(f) Number and types of consumers to be benefited from the service,
(g) Description regarding sale and purchase of electricity ( if there is any agreement or letter ofintention and related any other documents relating to the sale and purchase of electricity to be distributed, the copy should be enclosed),
(h) Other necessary matters.
15. Examination of Application:- ( 1) The Secretary by him/herself or through the ElectricityDe velopment Department shall examine or' cause to examine the application seeking licensefor production, transmission or distribution of electricity received pursuant to Rules 12, 13 or 14 tosee whether or not the applicant has submitted the necessary documents, particulars or report to besubmitted under the Act and these Rules.
(2) While examining the application pursuant to sub-rule ( 1), if it is found that theapplicant has not submitted any documents, particulars or report which ought to have beensubmitted, a notice shall be given to the applicant within Forty Five days from the date ofsubmission of the application specifying a reasonable time- limit to submit such documents,particulars or report.
(3) In case the Electricity Development Department gives notice specifying the time- limit to submit some documents, particulars or reports pursuant to sub-rule (2), the date, whensuch matters are received, shall be deemed as the date of submission of application for thepurpose of Sub- section (2) of Section 4 of the Act.
16. Public Notice to be Published:- (1) On receipt of application seeking to obtain license forproduction, transmission or distribution of electricity pursuant to Rules 12, 13 or 14, the Electricity Development Department shall, after making necessary examination of application under Rule 15, publish a notice stating the necessary particulars for the information ofgeneral public.
(2) Any person may furnish his/her reaction stating reasons thereto to theElectricity Development Department within Thirty Five days from the date of publication of notice pursuant to sub-rule (1), if the construction and operation of the proposed project is likelycausing adverse affect.
(3) If any reaction is received pursuant to sub- rule (2), upon considering suchreactions, the conditions which should be followed by the applicants shall be mentioned in thelicense.
17. To Issue a License:- The Secretary, after completing or causing to complete the procedurespursuant to Rule 15 and 16, on the applications submitted for production, transmission ordistribution of electricity pursuant to Rules 12, 13 and 14, shall issue the license to theapplicant in accordance with the demand of applicant or making necessary amendment in theformat as prescribed in Schedules 9 ( A), 9 ( B) or 9 ( C) respectively for production, transmissionor distribution of electricity.
18. License might be issued for Production, Transmission and Distribution of Electricity atthe Same Time:- If any person or corporate body is interested to produce, transmit ordistribute the electricity relating to a single project submits application in one time stating all theparticulars pursuant to Rules 12, 13 and 14, the Secretary, subject to the other provisions of these Rules, may issue licenses at the same time to such applicant permitting him/her forproduction, transmission and distribution of electricity.
- License to be given for Production Transmission and Distribution to the Licensee ofSurvey:- If any person or corporate body who has obtained license of one or all works forconducting survey of production, transmission or distribution of electricity pursuant to Rule 8or 9 submits an application stating the particulars pursuant to Rules 12, 13 and 14 for the worksof construction, operation and maintenance regarding production, transmission ordistribution of electricity based on his/her own survey within the time limit of the license,such license shall be issued to the applicant subject to the other provisions of these Rules.
- Right on Water Resources:- The licensee, who has obtained license for production ofelectricity, shall have the right to use the water resources for the works as mentioned in thelicense to the extent of such place and quantity as specified in the license.
- Time Limit to Start the Work:- (1) The licensee, who has obtained license under these Rules,shall have to start the physical works within three months in case of survey and one year incase of production, transmission or distribution from the date of obtaining the license andshall ha ve to inform the Electricity Development Department about the same.
Provided that if the licensee gives application stating the reasons of being unable to startthe works within the time limit, the time limit may be extended if such reasons are deemedproper and sufficient.
(2) Once the works starts pursuant to sub-rule (1), the progress report of the work shall ha ve to be furnished to the Electricity Development Department at every six months till thecompletion of the work.
- New License to be obtained:- (1) Any person or corporate body who has been undertakingthe works of production, transmission or distribution of electricity prior to the commencement of the Act, shall have to give application stating the particulars as mentioned in Rules 12, 13 or14 to the Secretary through the Electricity Development Department for obtaining the licensepursuant to Sub- section (3) of Section 4 of the Act.
(2) The Secretary, either him/herself or through the Electricity Development Department,shall examine or cause to examine the application submitted pursuant to sub-rule ( 1) and issuethe license to the applicant in the format as prescribed in Schedule-10.
- Permission for Import of Electricity:- (1) If the licensee, who has obtained license forproduction, transmission or distribution in accordance with these Rules, is interested toimport the electricity into Nepal,
he/she shall ha ve to submit an application together with the agreement made thereto to theElectricity Development Department to get the prior permission of Government of Nepal.
(2) The name of the country from where the electricity is to be imported, standard ofvoltage of electricity to be imported, quantity, area of transmission or distribution, period ofimporting the electricity and other necessary matters shall ha ve to be mentioned in theapplication to be submitted pursuant to sub-rule (1).
(3) Government of Nepal after making necessary examination, may, upon receipt ofthe application pursuant to sub-rule ( 1), give its permission to import the electricity eitherin accordance with the demand of the applicant or with required amendment.
Deleted by Third Amendment.
24. License Fee:- (1) While submitting an application for obtaining the license for survey, an amount equal to the fees prescribed in Schedule-11 shall be deposited in the deposit account in the name of Electricity Development Department.
(2) While submitting an application for obtaining a license for production, transmission or distribution, the fees as prescribed in Schedule-11 shall have to be paid.
(3) In case a person or a corporate body who has submitted an application pursuant to Sub-rule (1) receives a survey license pursuant to Sub-section (2) of Section 4, the deposit amount so deposited by him/her shall be transferred into the Revenue Account of the Government of Nepal, bythe Electricity Development Department as a license fee.
Provided that, in case, the license could not be issued to him/her, such deposit amount shallbe refunded to the depositor.
(4) In case, it has been decided to issue survey license pursuant to Sub- section (2) of Section 4 of the Act and the same has been informed, to the applicant and if the applicant does notappear to collect the survey license within three months of such information, the amount deposited pursuant to Sub-rule (1) shall be transferred into the Revenue Account of the Government of Nepal.
Provided that, In case the person or corporate body who has been decided to receive license does not collect it within thirty five days of publication of this Rule in the Nepal Gazette,the deposit amount collected upto the date of publication of this Rule in Nepal Gazette shall be transferred into the Revenue account of the Government of Nepal.
- To Rene w the License:- (1) The license issued in accordance with the Act and these Rulesshall have to be renewed one year before the expiry of the period as mentioned in the license.
Amended by second Amendment
(2) While renewing a license pursuant to Sub- section ( 3) of Section 5 of the Act, an amount ....................as prescribed in Schedule-11 shall be charged.
- Counting of Unit (Kilowatt hour) for the Purpose of Royalty:- While counting the units(Kilowatt hour) for the purpose of royalty pursuant to Section 11 of the Act, the quantity of electricity used for the operation of the powerhouse shall be deducted from the total electricityproduced from the powerhouse and remaining units shall be counted.
- Export Tax:- The export tax to be payable for exporting electricity, pursuant to Sub-section (3) of Section 22 of the Act, shall be as determined in the agreement made withGovernment of Nepal pursuant to Sub-section
(2) of the same Section.
CHAPTER-3
MATTERS TO BE FOLLOWED BY DISTRIBUTOR ANDCONSUMERS OF ELECTRICITY
- Application to be Submitted for Installation of Electricity Line:- (1) The consumer, who isinterested to use electricity to be distributed by the licensee, shall have to submit anapplication to his/her office in the format as prescribed by him/her.
(2) On receipt of an application pursuant to sub-rule (1), the licensee shall afterinspection of the wiring, if deems proper from technical and safety point of view shallarrange necessary action to supply electricity to the applicant. If the licensee deems wiringimproper he shall issue a notice to the applicant for the improvement of the wiring.
Omitted by First Amendment
(3) In case of dispute arising between the licensee and the consumer in connectionwith the availability of electricity to the consumer after the inspection pursuant to sub-rule ( 2),the affected party shall have to give an application to the Chief Electricity Inspector. The Inspector by conducting an inspection upon such application may issue necessary order. Itshall be the duty of both the licensee and the consumer to follow such order.
(4) The licensee before issuing notice of granting electric connection shall makeconsultation with the person willing to be a consumer regarding the service line and fix properplace for placing the energy meter.
(5) The licensee shall provide a copy of the cost estimate to the person willing to bea consumer, showing the possible expenditure for the electric connection and any material tobe installed on his own cost.
(6) The electric line shall be connected only after the person willing to be theconsumer pays the cost along with the cost estimate as received pursuant to sub-rule (5) inthe office of the licensee and the licensee shall have control over such electric connection.
- The Licensee should have to Install the Energy Meter:- (1) The licensee shall installenergy meter on his/her own expense for the consumer to measure the consumption of electric energy and may take security money as reasonable for meter installed.
(2) In case if electric connection is not in existence at the place of the consumer thesecurity money as deposited by the consumer pursuant to sub-rule (1) shall be refunded tohim/her.
(3) Notwithstanding anything written in sub-rule (1), in special circumstances or if theperson willing to be a consumer and the licensee make mutual understanding forsimplicity, the licensee may supply electricity without installing any energy meter.
(4) The licensee shall cause to inspect technically the energy meter installed at the placeof the consumer from time to time and if the energy meter is not in order to generaloperation, he shall change the new energy meter without any charge.
Provided that, the licensee shall install the energy meter realizing the price of theenergy meter from the consumer in case where the energy meter has become out of order or hasbeen stolen due to fault or negligence done knowingly by the consumer.
(5) The licensee shall cause the inspection of the energy meter within Fifteen daysin maximum if the consumer submits an application stating that the energy meter is out oforder or is running faster than the normal pace.
(6) On inspection if it is found the energy meter is out of order or is running faster thanthe normal pace, the licensee shall have to change or repair such energy meter at free of cost.
(7) According to the claim of the consumer, if it is found the consumer has sufferedloss due to the energy meter being out of order or running faster, the licensee shall compensatethe loss from the date of the application submitted by the consumer to the proceeding onemonth.
(8) The licensee shall issue a card to the consumer in which electricity consumption and theamount paid for it of each month is clearly shown.
(9) The licensee may affix necessary seal, as required, in the energy meter installed inthe house and premises of the consumer or in other materials installed for the purpose ofsupplying electricity.
(10) The seal affixed pursuant to sub-rule (9) should not be displaced, destroyed orby any means damaged by any body other than the licensee or the person appointed by him/her.
(11) In case if a consumer wants to change the place of the energy meter, which hasalready been installed, at the convenient place, the licensee by levying charge pursuant toRule 34, shall cause it to be changed.
(12) The consumer shall not, in any way, try to handle or damage the service line, energymeter, cutout or circuit breaker.
- To Prepare the Description and Index of Consumers:- ( 1) The licensee, shall keep safelythe description of the facts regarding the supply of electricity to the consumers and suchdescription should be shown to the Inspector if he/she wants to see it in course of his/herenquiry.
(2) The licensee shall prepare a up- to-date list of the consumers enjoying the serviceand persons willing to be new consumers within its area of distribution of electricity.
- No Line to be provided to others:- The consumer should not allow electric connection to other'shouse from his/her own energy meter.
- Light Installation at Street or Public Place to be according to the Agreement:- As regards the expenses for the electricity charge, repair and maintenance of the street lights or lights installedat public places, it shall be governed by the agreement reached at the time of installation betweenthe consumer and the licensee.
- Paying of Charges and Other Fees:- (1) There shall be a liability to each consumer to pay theelectricity charge and other fees for enjoying the electricity service as determined by theTariff Fixation Commission constituted pursuant to Section 17 of the Act.
(2) The period to pay the charges pursuant to sub-rule (1) shall be as fixed by thelicensee. While fixing such period the rebate shall be made clear for those consumers whopay the charges before the fixed period and
additional charges to those consumers who do not pay charges within the fixed period.
- Other Charges:- The licensee may charge other charges with addition the electricity charge tothe consumers for rendering' the electricity service pursuant to Sub-section (2) of Section 16of the Act for rendering the following services:-
(a) Installing of the electricity line,
(b) Transferring of the energy meter from one place to another,
(c) Reconnecting the electric line after disconnection,
(d) Changing the inside fuse of meter-box,
(e) Fitting of new seal in case it is broken,
(f) Transferring of the entitlement of consumer,
(g) Testing of energy meter,
(h) Making a vailable of consumers' card.
- Energy Meter to be Installed:- The licensee, who produces the electricity more than 1000kilowatt, shall compulsorily install the energy meter.
- Regarding the Design and construction of Electric Circuit:- While designing andconstructing the electric line from electric generation plant or main sub-station to thedistribution transformer of the remotest location, it shall be done in such a way that the voltageto be transformed from the transformer shall be proper and the consideration be given to theloss of electric circuit and in the process of such construction; ( if needed, the tapping available in the transformer may be used).
- Information to be Provided in Case of Danger:- In case when a danger exists from theelectrical installation in the consumer's house or premises or
there is a possibility to have danger, the consumer shall inform the office of the licensee assoon as possible.
- Inspection and Maintenance of Service Connection:- (1) Upon receipt of the informationpursuant to Rule 37, the, licensee shall assign a technician immediately and cause to remove thedanger.
(2) Whether or not the information is received pursuant to Rule 37, the licenseeshall cause to inspect and maintain the service line of consumer in time to time by electrictechnician on such area where the distribution is made by him/her and cause to maintain thesafety measures.
- Service Line to be Reconnected:- If the consumer pays the charge fixed by the licensee, theservice line disconnected pursuant to Clauses (c) and (d) of Section 19 of the Act shall bereconnected.
CHAPTER – 4
VOLTAGE, FREQUENCY AND POWER FACTOR OF ELECTRICITY
- Supply Voltage:- ( 1) The standard of supply voltage shall ha ve to be maintained as follows:-
(a) 230 volt in A. C. single phase and 400 volt in three phases for generalconsumers.
(b) For those who want a supply of electricity from four wires, the electricservice shall be made a vailable in 230/400 volt from A.C. three phases.
(2) The fluctuation shall not be allowed for more than five percent in standard voltas mentioned in Clauses (a) and (b) of sub-rule (1).
- High Voltage Distribution System:- ( 1) The standard of the voltage in the high voltagedistribution system, the standard of distribution system shall be maintained as follows:-
(a) 3,300 volt,
(b) 6,600 volt,
(c) 11, 000 volt,
(d) 22, 000 volt,
(e) 33, 000 volt,
(2) The fluctuation shall not be allowed for more than five percent in standard volt asmentioned in Clauses (a) to (e) of sub-rule (1).
- High Voltage Transmission System:- (1) The standard of the voltage in the high voltagetransmission system shall be transmitted as follows:-
(a) 33, 000 volt,
(b) 66, 000 volt, (c) 1,32,000volt, (d) 2,20,000 volt, (e) 4,00,000 volt,
(2) The fluctuation shall not be allowed for more than ten percent in standard voltmentioned in Clause (a) to (e) of sub-rule (1).
- Frequency:- (1) The standard of the frequency shall be maintained as 50 cycles per second(50 hertz).
(2) The fluctuation shall not be allowed more than 2.5 percent in the frequency standard asmentioned in sub-rule (1).
- Power Factor:- The standard of the power factor shall have to be maintained as follows:-
(a) The level of power factor of the electricity supplied to the consumer shall not beallowed not less than 0. 8 lyayring and not more than one unit leadings.
(b) The condensers or any other appropriate equipment shall be managed for maintaining the standard of power factor in electric transmission and distribution system pursuant to clause(a).
(c) The licensee may cause the consumer to install appropriate condenser if the consumer'selectricity related power factor is not at the level mentioned in Clause (a).
- Unit of Measurement of Different Standard of Electricity:- Following unit ofmeasurement shall be maintained for measuring different standard of electricity:-
(a) Milliampere, ampere or kiloampere for the measurement of electric current,
(b) Millivolt, volt or kilovolt for the measurement of voltage,
(c) Ohm, kiloohm, or megaohm for the measurement of resistance,
(d) Henry, Millihenry or kilohenry for the measurement of inductance,
(e) Microfarad, millifarad or farad for the measurement of capacitance,
(f) Watt, kilowatt or megawatt for the measurement of power,
(g) Kilowatt hour, megawatt hour or gigawatt hour for the measurement of energy.
(h) VA, KVA or MVA for the measurement of voltampere,
(i) VAR, KVAR or MVAR for the measurement of reactive power.
- Standard to be Maintained:- (1) The standard of the voltage, frequency or power factor ofelectricity shall ha ve to be maintained in accordance with this chapter by the licensee.
(2) If it is found that standard has not been maintained pursuant to sub-rule (1), theinspector, by taking into account the condition of the plant of the licensee, shall allownecessary time to improve such system and it shall be the duty of the licensee to correct theelectricity system within the prescribed time.
- Increase or Decrease of the Limits:- Government of Nepal may, by publishing anotification in Nepal Gazette, may increase or decrease the limits of voltage, frequency andpower factor mentioned in this chapter by taking technical factors for the avoidance ofdangerous effects.
CHAPTER – 5
SAFETY MEASURES REGARDING ELECTRIC DEVICES
- Minimum Distance from Ground to the Electric Wire:- ( 1) Distance between the electricwire of different volts of the distribution and transmission system and the ground shall not beless than as prescribed in Schedule-12.
(2) In case where electric line is to be installed by the side of the road or along it, itshall be done by adopting appropriate technological measures.
(3) If it is necessary to install electric line of more than 33, 000 volts, it shall haveto be done by adding 0.305 meter for each 33,000 volts on the distance as prescribed for 33,000 volts in Schedule- 12.
- Regarding the Installation of Electric Line Across the Road:- While installing electric lineof more than 11,000 volt across the road in a densely populated area, the double insulator systemshall have to be used.
- Distance to be Maintained on either side of the Electric Line:- (1) While installing electric lineof distribution and transmission system, it shall not be installed in a distance lower than thedistance as prescribed in Schedule- 13 from the house or tree.
(2) If it is necessary to install electric line of more than 33, 000 volt, it shall have to be done by adding 0.305 meter for each 33,000 volts on the distance as prescribed for 33, 000volts in Schedule- 13.
- Distance to be Maintained in between the Poles:- While determining the distance in betweenthe electric poles, it shall be maintained with taking consideration upon last tensile strength factorof safety and distance between ground and wire.
- No Electric Lines should be carried out from above a House:- No electric lines of any kindshall be carried out from above a house.
Provided that the lines of upto 400/230 volt may be carried out from above a garage,cottage (Tahara), or fence and such electric lines shall be installed at a height which shall not beless than three meter from the highest point of such garage, cottage or fence.
- In Relation to Installation of the Lines of Different voltages in a Single Pole:- ( 1) Whileinstalling electric lines of different voltages on a single pole, the line of higher voltages shallbe installed above and the line of low voltage below.
(2) While installing lines in a manner as mentioned in sub-rule ( l), care has to betaken that no leakage or danger of any kind or charge shall exist from high voltage line tolow voltage line.
(3) It is necessary that a distance required from the technical point of view shouldbe maintained between the lines of high voltage and low voltage.
- In Relation to electric Lines to be Installed around Airport:- While installing electric linesaround the airport, it shall be done according to a decision arrived at by the discussion withthe chief of airport concerned.
- In Relation to Installation of Electric Lines and Telephone Lines:- While installing electric linenear to the telephone lines or vice versa, the licensee and the concerned office oftelecommunication shall hold discussions between them and it shall be installed in such away that no obstacle or charge shall be made to the telephone line from the technical pointof view.
- Safety from Lightning:- The licensee, shall, for the purpose of safety from any harm fromlightning or to ensure non- fluctuations of electric energy, provide protection equipmentagainst lightning or any appropriate de vice and a system for earthing of lightning fromthose devices shall also be provided.
- Change-over-switch to be Maintained:- Each person, who install a standby generating set forstandby use, shall, in consultation with the licensee in that area, have to install a change- over-switch.
- Earthing to be Done:- (1) All kinds of metallic supports under high voltage system shall bepermanently and effectively earthen by using perpetual earth wire.
(2) Insulators shall have to be installed at not less than three meters from the ground inthe stay-wires used in supports of transmission and distribution system.
- Cutout to be Installed:- (1) The licensee shall have to install cutout or circuit breaker onthe energy meter with seal for the purpose of safety and
load limit of the energy meter installed in the house or premises of the consumer.
(2) The consumer shall ha ve to install an isolating switch nearby the energy meter.
60. Earthing of Electric Devices to be used at the places of the Consumer:-
(1) If electric appliances like water- heater, air-conditioner are installed in the house of theconsumer, provision of earthing shall ha ve to be made for such appliances by supplying electricity through separate appropriate electric circuit.
(2) If electric appliances of different metals is to be used in the house or premises ofthe consumer, three- pin plug socket shall ha ve to be installed and such plug socket shall ha ve tobe connected with the earthing system.
(3) The earthing system installed in the house or premises of the consumer shall ha ve tobe in accordance with the technically proper system.
- Safety of Internal Wiring:- Wiring method and the electric de vices installed for thesafety of internal wiring of the consumer's house shall ha ve to be in accordance with theprevailing technical standard.
- Insulated Wire to be Used:- Insulated wire shall have to be used when joining electric lineto the consumer's house.
- Electric Line to be Provided through Pole:- (1) While installing a electric line to theconsumer's house, it shall be done only through pole.
(2) Notwithstanding anything written in sub-rule (1), while installing electric lineto the consumer's house, it shall be done only after making provision of safety in accordancewith the pre vailing technical standard.
- Danger of Leakage at 230/400 Volt:- The insulation resistance of electric system of 230/400volts and wiring shall be at least 5 megaohm.
- Danger of Leakage at High Voltage:- ( 1) The insulation resistance of 3, 300 volt electricsystem shall be at least 20 megaohm.
(2) While calculating the insulation resistance of more than 3, 300 volt electricsystem, it shall be done by adding 1 megaohm for each 1, 000 volt on 20 megaohm.
(3) The operation of electric system without the insulation resistance as mentionedin sub-rule ( 1) and (2) shall not be allowed.
- Utilization of House and Land around the construction Site Relating to Production,Transmission and Distribution of Electricity may be Prohibited:- (1) If any constructionwork has been carried on relating to production, transmission and distribution of electricity for the purpose of Sub- section ( 3) of Section 33 of the Act, Government of Nepal may, bypublishing a notification in the Nepal Gazette from time to time, prohibit in the utilization ofthe house and land at the place of construction or at the place falling within the specifieddistance around the construction site for any specified purpose.
(2) No one should plant tree or construct house underneath the electric line installedfor the purpose of transmission or distribution of electricity or on either side of such linewithin the distance as prescribed in Schedule-12 and 13.
- Standard of Electrical Devices and Method of Use :- The licensee, shall have to abide bythe following matters from the point of view of standard and safety of the electrical de vicesto be used in the works of production, transmission and distribution of the electricity:-
(a) Materials and de vices of high standards should be used,
(b) when bringing into operation the new plant or after repairing the old one, it should beoperated after conducting all tests from the technical point of view and be proved proper,
(c) The electric wires to be used for any purpose should be of adequate capacity required forthat work,
(d) While joining the electric wires, it should be joined in accordance with the recognized technical standard in such a way that a danger might not arise,
(e) The joint boxes of underground wire, metallic conduct joint and joint of metallic sheets of thewire shall have to be installed on such places that those joints could be easily accessiblefor inspection.
(f) Fuses, circuit breaker or any appropriate de vice shall ha ve to be installed in such away that if more current than the specified current flow in the electric circuit or sub-circuit, they might resist the flow of current and there would not arise any danger. Thesedevices, while in operation, should be such that extra heat would not be produced, non-sparking and would of no danger at the time of changing.
(g) Single phase switch is not allowed to be installed in the neutral wire except on live wire.
CHAPTER-6
SAFETY PROVISIONS RELATING TO THE ELECTRICAL WORKS
- Warning Indication Board:- (1) The licensee shall hang a warning indication board inNepalese and English language on the following de vices and places:-
(a) On motor, generator, transformer and other kinds of plants and also on theequipments required to operate and control them,
(b) On poles through which lines of more than 400 volts are passing and on the line- board where the tube for X-ray has been installed or on other plants of such highfrequency.
(2) If warning indication board is not possible to be hanged on all equipments mentionedin Clause (b) of sub-rule (1), it shall be hanged at a place nearby or at entrance to the placewhere such equipments have been installed.
- Electricity Supply to be Cut-off:- (1) Electricity supply shall have to be cut off if inspection,repairing or any other important work relating to the equipments installed for production,transmission and distribution is to conduct.
(2) Notwithstanding anything written in sub-rule (1), there shall be no compulsion to cut off the electric line if it is possible to work with full safety from the technical point ofview.
(3) While re- operating the electric line after the completion of work pursuant to sub-rule ( 1), it shall be operated only after taking full care of the possible danger.
- Voltage Testing and Line Earthing:- While carrying the works of repairing and maintenanceof electric line, it shall be done only after testing the current with a tester and being sure ofvoltage cutoff.
- Insulated Gloves to be Used:- While working 511 a place having live line of electricity,work shall ha ve to be done only by using insulated gloves.
- Notice for First Aid when Affected by Electric Current :- ( 1) Procedures required to be taken asa first-aid measure when affected by electric current shall have to be displayed at the licensee'splant in clearly understandable Nepalese language.
(2) The owner of the electric plant shall compulsorily arrange training required forfirst aid measures as mentioned in sub-rule (1) to those employees who work in operation, repairand maintenance of his plant.
- Safety Belt :- Workers working at any ele vated place or electric poles shall be asked towork only by using safety-belt for protection.
- Information of Accident :- (1) The licensee should have to send a detail description ofhappening of any accident and damage in plant to the Inspector in the format as prescribedin Schedule- 14.
(2) After receiving the details pursuant to sub-rule (1), the Inspector may inspect asrequired to find out the cause of such accident and may give order to the licensee for arrangingsafety measures in order to that such accidents should not be repeated from the technicalpoint of view. It shall be the duty of the licensee to obey such order.
CHAPTER-7
PROVISIONS RELATING TO INSPECTION AND INVESTIGATION
- Provision relating to Inspector and Employees:- (1) For the purpose of Section 37 of the Act,Government of Nepal, as required, may appoint Chief Electricity Inspector or other ElectricityInspectors.
(2) Government of Nepal may appoint other employees to assist the Chief electricityInspector and Electricity Inspector to their work.
- Qualification Required for Inspector:- (1) A person having an experience of ten years atminimum in the field of electricity after holding a degree of Bachelor of Engineering may beappointed on the post of Chief Electricity Inspector.
(2) A person holding a degree of Bachelor of Engineering may be appointed on the postof Electricity Inspector.
- Power of the Inspector:- (1) The Inspector appointed pursuant to Rule 75, may makeexamination about the plant of the licensee.
(2) It shall be the duty of the licensee or the consumer to answer all the questionsasked by the Inspector in connection with the examination pursuant to sub-rule (1) and tocooperate him/her as required.
- Inspector to be Deputed to Make Examination of New Plant :- The Chief Electricity Inspectorby him him/herself or any Inspector deputed by him/her may make examination of a newplant installed by a licensee.
- Examination of the Operating P1ant :- Each licensee shall have to cause examination of his/heroperating plant every year and obtain a certificate thereto.
- Order of the Inspector to be Followed:- (1) The licensee shall abide by the order issued bythe Inspector under the Act and these Rules in connection with the survey, production,transmission or distribution of Electricity.
(2) The licensee, who does not satisfy with the order issued by the Inspector pursuant tosub-rule (1), may file a complaint to the Secretary and the order issued by the Secretary inthis regard shall be final.
- Examination of Improper Electrical Appliances or System:- The licensee, for the re-operation of the electrical devices or system making in proper condition to which theInspector had decided as improper after examination shall ha ve to give an application to theInspector. The Inspector shall give permission to re-operate of the electrical devices system ifproper after examining such electrical devices or system.
- Charges for Examination :- A licensee or a consumer may, if he/she deems necessary to cause tomake examination of some thing in accordance with these Rules, give an application tothe Chief Electricity Inspector. The licensee or consumer, while causing examination so, shallhave to pay the
charge as prescribed by Government of Nepal by a notification published in the NepalGazette.
Provided that if the examination of operating plant is caused by the Inspector deputed bythe Chief Electricity Inspector in connection with his/her regular duty no examinationcharge shall have to be paid.
- Notice of the Outcome of Examination :- The Inspector shall have to notify the concerned person if the examination shows that the electric equipments or system is found in propercondition and if it is not found in proper condition he/she shall ha ve to issue a written order to change, repair or stop operation of such electric de vices or plant.
CHAPTER- 8
MISCELLANEOUS
- Power to Fix Safety Conditions Regarding the Construction Works Relating toHydroelectricity:- Government of Nepal may, by publishing a notification in the Nepal Gazette, fixthe measures to be taken while making design and constructing dam, powerhouse and otherstructures required for production of electricity and conditions for safety regarding theconstruction of powerhouse with reservoir.
- Statements to be Brought to Knowledge:- Prior to start the works of production, transmissionor distribution of electricity, the licensee shall ha ve to keep in a conspicuous manner in hisoffice the copy of the license, the map of the area of production, transmission or distribution of electricity, relation to be maintained between the licensee and the consumer regarding thedistribution of electricity and descriptions stating other conditions.
- Provisions Relating to Residence and Bonus:- (1) For the purpose of Section 15 of theAct, the licensee shall have to provide a residential quarter
for the workers and employees involved on the works of production, transmission ordistribution of electricity.
(2) The licensee shall ha ve to distribute bonus to the workers and employees every yearsetting aside the amount equal to two percent of the amount of net profit.
Provided that the bonus to be distributed shall not exceed the amount equal to theannual salary of the concerned employee.
(3) The licensee, after distributing the bonus from the amount set aside pursuant to sub-rule (1), shall deposit the remaining amount in the fund set up as the employee's welfarefund.
(4) The operation of the fund pursuant to sub-rule (3) shall be as decided by thelicensee.
(5) Matters relating to bonus other than mentioned in these Rules shall be regulatedunder pre valent Nepal Law.
- To be Compensated:- ( 1) Government of Nepal or the licensee shall, if the landowners are notallowed to possess their house and land situated at the prescribed distance for the purpose ofSub-section (3) of Section 33 of the Act and Rule 66, pay the amount of compensation atlump sum to such land owners as determined by the Compensation Fixation Committeepursuant to Rule 88.
(2) The compensation to be given pursuant to sub-rule (1) shall be applicable only to theconstruction works relating to electricity which are to be constructed after thecommencement of these Rules.
(3) Notwithstanding anything written in sub-rule (1) the compensation shall not bepaid on the following conditions :-
(a) If the land is beneath the service line installed for the purpose of supplying electricity tothe landowner, or
(b) If houses are attached to each other in densely populated urban or rural area and the main line passes through the wall of one house to another house while connectingelectric line from one house to another house.
- Compensation Fixation Committee :- (1) A Compensation Fixation Committee shall beformed consisting of a chairperson and members as follows for the purpose of fixation of the amount of compensation to be paid pursuant to Sections 28 and 29 of the Act:-
(a) A person as designated by
Government of Nepal - Chairperson
(b) A concerned person or a representative of a corporatebody conducting
survey, production transmission or
distribution of electricity - Member
(c) An expert relating to the field of electricity asdesignated by
Government of Nepal - Member.
(2) The following persons also shall be members in the committee as prescribed bysub-rule ( 1) in order to fix the amount of compensation to be paid pursuant to Section 32and 33 of the Act and Rule 87 :-
(a) Owner of the real estate
( immovable property) who has
sustained loss or his/her representative - Member
(b) Representative of the concerned Land RevenueOffice relating to
area of the loss incurred real estate - Member
(c) Representative of the concerned Village
Development Board or Municipality relating
to area of the loss incurred real estate - Member.
(3) The Compensation Fixation Committee pursuant to sub rule ( 1) shall, while fixingthe amount of compensation, ha ve to adopt a policy of fixing actual figure of loss.
(4) The procedures relating to the meeting of the Compensation Fixation Committeemay be determined by the said committee itself.
- Authority Prescribed:- The Secretary has been prescribed as the authority for the purposeof Sub- section (5) of Section 4, Section 8 and Sub-section (1), (2) and (3) of Section 38 ofthe Act.
- Statement of Audit:- The licensee shall, maintaining the account of income and expenditurewhile doing the works of production, transmission or distribution of electricity, submit theaccount of income and expenditure of each financial year to the Electricity DevelopmentDepartment within six months of the next financial year.
- Annual Report:- (1) The licensee, after the commencement of works of the production,transmission or distribution of electricity, shall have to send an annual report e very year to theElectricity Development Department.
(2) In the report pursuant to sub-rule ( 1), the licensee, shall mention the units ofmonthly generated electricity from different power houses, the distributed units showing thecategory of consumers, internal use of the
plant, leakage, load and capacity factor, maximum demand of a month and a specimen of load curve.
- Use of Electric System :- (1) The licensee may, if it is possible from the technical point ofview, supply the electricity produced by him/herself in any part of Nepal to the other pointof the country through the present grid system and vice versa.
(2) The person or corporate body, who has the ownership of the electric systempursuant to sub-rule (1), shall allow to use his/her own system to the licensee if it isreasonable from the technical point of view.
(3) The licensee while supplying the electricity pursuant to sub-rule
(1) shall pay the charge as determined by mutual agreement to the person or corporate body towhom the said electric system belongs to.
- Registration and Permission should be in accordance with the Prevalent Laws:- While issuinga license under these Rules for the works of survey, production, transmission and distribution ofelectricity, the licensee should have been registered under the Industrial Enterprises Act,2049 and permission should ha ve been taken in accordance with the Foreign Investmentand Technology Transfer Act, 2049 in case foreign investment is to be involved.
- These Rules to be Applied:- ( 1) Except the provisions relating to license all other provisions ofthese Rules shall be applicable to production or development of electricity de veloped pursuantto Section 34 of the Act by Government of Nepal by itself.
(2) Except the provisions relating to license all other provisions of these Rules shallbe applicable to any person or corporate body who does
Amended by Third Amendment
the work of production, transmission or distribution of electricity having the capacity ofup to 1000 kilowatt.
94a. Manual or Procedure may be framed: - To meet the objectives of the Act of these Rules,Ministry of Energy may frame and implement necessary Rules of procedure.
- Change and Amendment in Schedule :- Government of Nepal may, by publishing anotification in Nepal Gazette, make any change or amendment, as required, in the schedulesof these Rules.
- Repealing and Saving:- (1) Electricity Rules, 2025 is hereby repealed.
(2) The works done pursuant to the Electricity Rules, 2025 shall be deemed as to havebeen done under these Rules.
Inserted by Third Amendment
Note
- "Electricity Development Centre" has changed into "Electricity Development Department" by First Amendment.
- "Ministry of Water Resources" has changed into " Ministry of Energy" by Third Amendment
Schedule – 1
(Relating to Rule 3)
Relating to Information
To,
The Secretary Through
Electricity Development Department Ministry of Energy
Sir/Madam,
I am providing this information since I am going to conduct survey, production, transmission or distribution of hydropower with a capacity of 100 to 1000 kilowatt with the following particularspursuant to Rule 3 of the Electricity Rules, 2050.
- Full name and address of the person or corporate body willing forsurvey/production/transmission/distribution of hydroelectricity.
- Aim and purpose of the survey/production/transmission/distribution ofhydroelectricity:-
- Area for the survey/production/transmission/distribution of hydroelectricity:-
(a) Zone
(b) District
(c) Village Development Committee/Municipality:-
- Capacity:-
- Particulars required by Rule 3 of the Electricity Regulation, 2050:-
The facts mentioned above are correct and true. In case if it is found false I/we am/areprepared to hear according to law.
Seal of corporate body.
Signature of the person or Corporate body providing the information
Signature:- Name:-
Address:- Date:-
Schedule- 2
(Relating to Rule 4)
Application for the License to Conduct Survey for Production ofElectricity
To,
The Secretary Through
Electricity Development Department Ministry of Energy
Sir/Madam,
I am submitting this application with the following particulars to conduct a survey forproduction of electricity pursuant to Rule 4 of the Electricity Rules, 2050.
- Full name and address of the person or corporate body willing to conduct
survey for production of electricity:-
- Type of electricity to be surveyed for production:-
- Name of water resources if survey is to be conducted for production of hydroelectricity:-
- Area of Survey:-
(a) Zone:-
(b) District:-
(c) V.D.C./Municipality:-
(d) Boundary:-
East West
North South
- Nature of Survey:-
- Estimated cost of survey:-
(Justification also should be given)
- Duration of Survey:-
From ............................ to....................................... (date)
- Other particulars:-
The facts mentioned above are correct and true. In case if it is found false, I/we am/areprepared to bear according to law.
Seal of the Corporate body
Applicant’s Signature:-Name:-
Address:- Date:-
Schedule- 3
(Relating to Rule 5)
Application for the License to Conduct Survey for Transmissionof Electricity
To,
The Secretary Through
Electricity Deve lopment Department Ministry ofEnergy
Sir/Madam,
I am submitting this application with the following particulars to conduct a survey oftransmission of electricity pursuant to Rule 5 of the Electricity Rules, 2050.
- Full name and address of the person or corporate body willing to conduct
survey for transmission of electricity:-
- Particulars of the project/place from where the electricity to be transmitted is to beprovided:-
- Particulars relating to place of transmission:-
From:- To:-
- Area for survey of transmission of electricity:-
(a) Zone:-
(b) District:-
(c) V.D.C./Municipality:-
(d) Boundary:-
East West
North South
- Voltage and quantity of transmission of electricity:-
- Nature of survey:-
- Estimated cost of survey:-
(Justification also should be given)
- Duration of survey:-
From……………………………..To................................ (date)
- Other particular:-
The facts mentioned above are correct and true. In case if it is found false, I/we am/areprepared to bear according to law.
Seal of the Corporate body
Applicant’s Signature:-Name:-
Address:- Date:-
Schedule - 4
( Relating to Rule 6)
Application for the License to Conduct Survey for Distributionof Electricity
To,
The Secretary Through
Electricity Deve lopment Department Ministry ofEnergy
Sir/Madam,
I am submitting this application with the following particulars to conduct a survey fordistribution of electricity pursuant to Rule 6 of the Electricity Rules, 2050.
- Full name and address of the person or corporate body willing to conduct
survey for distribution of electricity:-
- Description of the project/place from where the electricity to be distributed is to beprovided:-
- Area of Survey:-
(a) | Zone:- | |
(b) (C) (d) | District:- V.D.C./Municipality:-Boundary:- |
| East | West |
| North | South |
- Nature of survey:-
- Estimated cost of survey:-
(Justification also should be given)
- Duration of Survey:-
From ............................... to................................... ( date)
- Other particulars:-
The facts mentioned above are correct and true. In case if it is found false, I/we am/areprepared to bear according to law.
Seal of the Corporate body
Applicant’s Signature:-Name:-
Address:- Date :-
Schedule- 5(A)
(Relating to Rule 8)
License for Survey for Production of Electricity
License No:-
Gentleman/Madam,
Government of Nepal Ministry of Energy
As per your application submitted on........ (date) seeking to obtain a license for production of electricity, this license has been hereby issued to you with the following particulars in accordancewith Sub- section ( 2) of Section 4 of the Electricity Act, 2049 and Rule 8 of the Electricity Rules,2050.
- Full name and address of the person or corporate body willing to conduct survey forproduction of electricity:-
- Type of electricity to be surveyed for production:-
- Name of water resources to be surveyed for production of electricity:-
- Area of Survey:-
(a) Zone:-
(b) District:-
(c) V.D.C./Municipality:-
(d) Boundary:-
East West
North South
- Nature of survey:-
- Period of validity of survey:-
From.......................... to......................................... (date)
- Other conditions:-
License Issuing Authority's
Signature:- Name:-
Designation : Secretary
Address: Ministry of Energy Date:-
Schedule - 5(B)
(Relating to Rule 8)
License for Survey for Transmission of Electricity
License No:-
Government of Nepal Ministry ofEnergy
Gentleman/Madam,
As per your application submitted on .......... (date) seeking to obtain a license fortransmission of electricity, this license has been hereby issued to you with the following particulars in E accordance with Sub- section ( 2) of Section 4 of the Electricity Act, 2049 andRule 8 of the Electricity Rules, 2050.
l. Full name and address of the person or corporate body willing to conduct survey fortransmission of electricity:- .
- Particulars of the project/place from where the electricity to be transmitted is to be provided:-
- Particulars relating to place of transmission:-
From ................................... To…………...............
- Area of Survey:-
(a) Zone:-
(b) District:-
(c) V.D.C./Municipality:-
(d) Boundary:-
East West
North South
- Voltage and quantity of electricity to be transmitted:-
- Nature of survey:-
- Period of validity of license:-
From……………………….To……………………..
- Other conditions:-
License Issuing Authority's
Signature:- Name :-
Designation: Secretary Ministry ofEnergy Date:-
Schedule - 5(C)
(Relating to Rule 8)
License for Survey for Distribution of Electricity
License No:-
Gentleman/Madam,
Government of Nepal Ministry of Energy
As per your application submitted on........ (date) seeking to obtain a license for distributionof electricity, this license has been hereby issued to you with the following particulars in accordancewith Sub- section ( 2) of Section 4 of the Electricity Act, 2049 and Rule 8 of the Electricity Rules,2050.
- Full name and address of the person or corporate body willing to conduct survey fordistribution of electricity:-
- Particulars of the project/place from where the electricity to be distributed is to be provided:-
- Area of Survey:-
(a) Zone:-
(b) District:-
(c) V.D.C./Municipality:-
(d) Boundary:-
East West
North South
- Voltage and quantity of electricity to be distributed:-
- Nature of survey:-
- Period of validity of license:-
From ........................ To …...............
- Other conditions:-
License Issuing Authority's
Signature: Name:
Designation: Secretary Ministry ofEnergy Date :
Schedule – 6
(Relating to Rule 12)
Application for Obtaining a License for Production of Electricity
To,
The Secretary, Through
Electricity Development Department Ministry of Energy
Sir/Madam,
I am submitting this application with the following particulars along with the necessary documents for production of electricity pursuant to Section 4 of the electricity Act, 2049 and Rule 12 of the ElectricityRules, 2050.
- Name and address of the person or corporate body who is going to produce electricity:-
- Name of the project of electricity:-
- Means to produce electricity:-
- If water resources is to be used:-
(a) Name of the river:-
(b) Area where water resources is to be utilized:-
(i) Zone:- (ii) District:-
(iii) V.D.C./Municipality:- (iv) Boundary:- East West
North South
(c) Quantity of water to be utilized:-
- Descriptions of main structures and where to be located? :-
- Date of commencing the work:-
- Date of completing the work:-
- Other particulars:-
The facts mentioned above are correct and true, if it is found false, I/we am/are prepared to bearaccording to law.
Seal of the Corporate body
App1icant's Signature:- Name:- Address:- Date:-
Schedule – 7
(Relating to Rule 13)
Application for Obtaining a License for Transmission of Electricity
To,
The Secretary, Through
Electricity Development Department Ministry of Energy
Sir/Madam,
I am submitting this application with the following particulars alongwith the necessary documentsfor transmission of electricity pursuant to Section 4 of the Electricity Act, 2049 and Rule 13 of theElectricity Rules, 2050.
- Name and address of the person and corporate body who is going to transmit the electricity:-
- Description of the project/place from where the electricity to be transmitted is to be
provided:-
- Descriptions of the point from where the electricity is to be transmitted and destination of thetransmission:-
(a) Zone:- (b) District:-
(c) V.D.C./Municipality:-
- Quantity and voltage of electricity to be transmitted:-
- Date of commencing the work:- Date ofcompleting the work:-
- Other particulars:-
The facts mentioned above are correct and true, if it is found false, I/we am/are prepared to bearaccording to law.
Seal of the Corporate body
Applicant's
Signature :-
Name :-
Address :-
Date :-
Schedule – 8
(Relating to Rule 14)
Application for Obtaining a License for Distribution of Electricity
To,
The Secretary, Through
Electricity Development Department Ministry of Energy
Sir/Madam,
I am submitting this application with the following particulars along with the necessary documents for distribution of electricity pursuant to Section 4 of the Electricity Act, 2049 and Rule 14 of theElectricity Rules, 2050.
- Name and address of the person or corporate body who is going to distribute the electricity:-
- Description of the project/place from where the electricity to be distributed is to be provided:-
- Quantity and voltage of electricity to be distributed:-
- Area where the electricity is to be distributed:-
(a) Zone:- (b) District:-
(c) V.D.C./Municipality:- (d) Boundary:- East West
North South
- Date of commencing the work:- Date ofcompleting the work:-
- Other particulars:-
The facts mentioned above are correct and true, if it is found false, I/we am/are prepared to bearaccording to law.
Seal of the Corporate body
Applicant's Signature:-Name :- Address:- Date:-
Schedule - 9 (A)
(Relating to Rule 17)
License for production of Electricity
License No:-
Gentleman/madam,
Government of Nepal Ministry of Energy
As per your application submitted on ......... (date) seeking to obtain a license for production of electricity,this license has been hereby issued with the conditions as follows:-
- Full Name of the person or corporate body obtaining the license:- Address:-
- Name of the project of electricity:-
- Means to produce the electricity:-
- If water resources is to be utilized:-
(a) Name of the river:-
(b) Area where utilization of water resources is to be provided:-
(i) Zone:- (ii) District:-
(iii) V.D.C./Municipality:- (iv) Boundary:- East West
North South
(c) Quantity of water resources to be utilized:-
- Description of main structures and where to be located ?
- Period of validity of license:-
- Other conditions:-
License Issuing Authority's
Signature:- Date:-
Name:-
Designation:- Secretary Ministry of Energy
Schedule - 9 (B)
(Relating to Rule 17)
License for Transmission of Electricity
License No:-
Gentleman/Madam,
Government of Nepal Ministry of Energy
As per your application submitted on ......... (date) seeking to obtain a license for transmission of electricity, this license has been hereby issued with the conditions as follows:-
- Full Name of the person or corporate body obtaining the license:- Address:-
- Name of the project of transmission:-
- Description of the point from where the electricity is to be transmitted and destination oftransmission:-
(a) Zone:- (b) District:-
(c) V.D.C./Municipality:-
- Quantity and voltage of electricity to be transmitted:-
- Period of validity of license:-From…………………..to…………………………….
- Other conditions:-
License Issuing Authority's
Signature:- Date:-
Name:-
Designation:- Secretary Ministry ofEnergy
License No:-
Gentleman/Madam,
Schedule - 9 (c)
(Relating to Rule 17)
License for Distribution of Electricity
Government of Nepal Ministry of Energy
As per your application submitted on ......... (date) seeking to obtain a license for distribution of electricity, this license has been hereby issued with the conditions as follows:-
- Full Name of the person or corporate body obtaining the license:- Address:-
- Name of the project of distribution:-
- Description of the project/plant from where the electricity is to be distributed is to be provided:-
- Quantity and voltage of electricity to be distributed:-
- Area where the electricity is to be distributed:-
(a) Zone:- (b) District:-
(c) V.D.C./Municipality (d) Boundary:- East:- West:-
North:- South:-
- Period of validity of license:-
From ............................ to .............................
- Other conditions:-
License Issuing Authority's
Signature:- Date:-
Name:-
Designation:- Secretary Ministry ofEnergy
Schedule – 10
(Relating to Rule 22)
License for Production, Transmission and Distribution of Electricity
License No:-
Government of Nepal Ministry ofEnergy
Gentleman/Madan,
As per your application submitted on ....... (date) seeking to obtain a license for production,transmission and distribution of electricity, this license has been hereby issued with the following particulars pursuant to Sub-section (3) of Section 4 of the Electricity Act, 2049 and sub-rule (2) of Rule23 of the Electricity Rules, 2050.
- Name and address of the person or corporate body to do the work of production, transmission anddistribution of electricity:-
Address:-
- Name and particulars of each electricity generating plant:-
(a) Energy capacity (in kilowatt):-
(b) Estimated annual production (in kilowatt):-
(c) Date of commissioning:-
(d) Means being used in production of electricity:-
(e) Name of water resources if water resources is being utilized:-
(f) Location of electricity plant:-
Zone:- District:-
V.D.C./Municipality:-
- Particulars of each transmission line:-
(a) Name:-
(b) Standard of voltage:-
(c) Size of wire:-
(d) Transmitting capacity:-
(e) Voltage of concerned sub-stations and capacity of installed transformers:-
(f) Date of starting the transmission:-
- Particulars of distribution of electricity:-
(a) Area of distribution:-
Zone:- District:-
V.D.C./Municipality:-
(b) Voltage of electricity to be distributed:-
- Total capacity of distributing transformers:-
- Number of consumers:-
(a) Domestic:-
(b) Industrials:-
(c) Commercial:- (d) …………….
Total:-
- Average selling price:-
- Date of beginning of distribution:-
- Period of validity of license:-
- Other Conditions:-
License Issuing Authority's
Signatures:- Date:- Names:-
Designation:- Secretary Ministry ofEnergy
§Schedule- 11
(Relating to Rule 24 and 25)
License or License Renewal Fees
(A) For the Lice nse to Conduct Survey for Production of Electricity
S.N | Energy to be produce | License Fee | License Renewal Fee |
1. | From 1MW to upto 5 MW | Per year lump sum Rs. 50,000/- | Per year equal of license fee |
2. | From 5MW to upto 100 MW | Per mw rate of Rs.10,000/ per year | Per year equal of license fee |
3. | From 100MW to upto 500 MW | Per year lump sum Rs. 10,00,000/- | Per year equal of license fee |
4. | Above 500 MW | Per year lump sum Rs. 20,00,000/- | Per year equal of license fee |
(B) For the Lice nse to Conduct Survey for Transmission and Distribution of Electricity
S.N | Energy to be produce | License Fee | License Renewal Fee |
1. | From 1MW to upto 5 MW | Rs. 10,000/- | Half of the license fee |
2. | From 5MW to upto 100 MW | Rs.50,000/- | Half of the license fee |
3. | From 100MW to upto 500 MW | Rs. 5,00,000/- | Half of the license fee |
4. | Above 500 MW | Rs. 10,00,000/- | Half of the license fee |
(C) For the Lice nse of production, Transmission and Distribution of Electricity
S.N | Energy to be produce | License Fee | License Renewal Fee (only for Transmission and Distribution) |
1. | From 1MW to upto 5 MW | Rs. 1,00,000/- | Equal of license fee |
2. | From 5MW to upto 100 MW | Rs.5,00,000/- | Equal of license fee |
3. | From 100MW to upto 500 MW | Rs. 10,00,000/- | Equal of license fee |
4 | From 500MW to upto 1000 MW | Rs. 25,00,000/- | Equal of license fee |
5. | Above 1000 MW | Rs. 50,00,000/- | Equal of license fee |
- § Amended by First Amendment and changed by notification of 2064.5.24 of Nepal Gazette.
Schedule- 12
(Relating to Rule 48)
Distance which ought to be from wire to the ground |
S. No. Standard of voltage of electricity | While accrossing theroad (meter) | On | the side the road(meter) | of | In | other places(meter) |
1. In between230/400 and 11,000 | 5.8 | 5.5 | 4.6 |
2. In between 11,000 and 33, 000 | 6.1 | 5.8 | 5.2 |
Schedule -13
(Relating to Rule 50)
Minimum distance which ought to be from the wire to the house or tree
S. No. | Standard of Voltage of Electricity | Minimum Distance to be from house or tree |
1. | Standard 230/400 to 11,000 | 1.25 meter |
2. | From 11,000 to 33, 000 | 2.00 meter |
Note:- While determining the minimum distance as above, maximum deflection of wire arisingdue to air pressure shall also have to be considered.
Schedule- 14
( Relating to Rule 74)
Format of the information of accident caused due to electric current
- Time and date of accident:-
- Place, distr ict and zone of accident:-
- Electric ity supply volta ge and system:-
- Name of the person killed or injured due to accident ( if animal is affected, mention it) :-
- Name of the licensee of the area of accident:-
- Occupation of the person sustaining accident (work relating to electricity or other work)to be mentioned clearly:-
- (a) If accident was occurred due to work relating to electricity, particulars ofthe same:-
(b) If accident was occurred due to other work, how it occurred, particulars of thesame:-
- If accident was occurred due to work relating to electric ity, the name and
designation of the person on whose order the victim was working and the statement ofthe person giving order:-
- Detailed description of accident:-
- Description of the work done after accident:-
- Details of the measures take or to be taken by the licensee in order to remove thepossibility of such accident in future:-
Licensee's Signature:-Name:-
Designation :- Date:-