Meta Data
Title in national language: 
Bərpa olunan enerji mənbələrindən istifadə sahəsində pilot layihələrin həyata keçirilməsi tədbirləri haqqında Azərbaycan Respublikası Prezidentinin Sərəncamı/Распоряжение Президента Азербайджанской Республики о мерах по реализации пилотных проектов в области использования возобновляемых источников энергии
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
2019
Scope: 
National
Document Type: 
Other
Economic Sector: 
Energy
Energy Types: 
Renewable, Solar, Wind
Issued by: 
President of the Republic of Azerbaijan
Notes: 
No official English version available
Overall Summary: 
The Order No. 1673 of 2019 on Actions for Implementing Pilot Projects on the Use of Renewable Energy Sources provides measures related to the construction of power plants for renewable energy sources (wind and solar).
Renewable Energy
RE action plans: 
1.In order to implement pilot projects in the Republic of Azerbaijan (hereinafter referred to as projects) related to the construction of power plants for renewable energy sources (wind and solar), and to coordinate their implementation, create a Commission with the following composition: [...] 1.2. To entrust the Commission: 1.2.1. Within a month, submit proposals to the President of the Republic of Azerbaijan on the allocation of land plots for the implementation of projects; 1.2.2. Within a month, submit to the President of the Republic of Azerbaijan proposals regarding state guarantees that are intended to be provided to investors, as well as proposals related to the state guarantee for the fulfillment of obligations, which will be accepted to investors under the agreements specified in subparagraph 1.2.3. of this Order. 1.2.3. within four months, ensure the preparation, with the involvement of an international consulting company, of a contract for the purchase of electricity, a contract for connecting power plants to power grids, a state guarantee contract related to the implementation of projects and other required contracts; 1.2.4. take the necessary measures to ensure the implementation of projects within the timeframes stipulated in the contracts and within the framework of the conditions outlined in them. 1.2.5. within a month, prepare and submit to the President of the Republic of Azerbaijan proposals on strengthening the network in connection with the connection of the power plant to the electric power network on projects, the integration of renewable energy sources into the electric power network.