NOTE: Some content may not display correctly, including tables and figures. See PDF for full details.
ASIAN DEVELOPMENT BANK
LAO PEOPLE’S
DEMOCRATIC REPUBLIC
ENERGY SECTOR ASSESSMENT,
STRATEGY, AND ROAD MAP
NOVEMBER 2019
ASIAN DEVELOPMENT BANK
Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO)
© 2019 Asian Development Bank
6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines
Tel +63 2 8632 4444; Fax +63 2 8636 2444 www.adb.org
Some rights reserved. Published in 2019.
ISBN 978-92-9261-894-0 (print), 978-92-9261-895-7 (electronic)
Publication Stock No. TCS190567
DOI: http://dx.doi.org/10.22617/TCS190567
The views expressed in this publication are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent.
ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. The mention of specific companies or products of manufacturers does not imply that they are endorsed or recommended by ADB in preference to others of a similar nature that are not mentioned.
By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area.
This work is available under the Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) https://creativecommons.org/licenses/by/3.0/igo/. By using the content of this publication, you agree to be bound by the terms of this license. For attribution, translations, adaptations, and permissions, please read the provisions and terms of use at https://www.adb.org/terms-use#openaccess.
This CC license does not apply to non-ADB copyright materials in this publication. If the material is attributed to another source, please contact the copyright owner or publisher of that source for permission to reproduce it. ADB cannot be held liable for any claims that arise as a result of your use of the material.
Please contact [email protected] if you have questions or comments with respect to content, or if you wish to obtain copyright permission for your intended use that does not fall within these terms, or for permission to use the ADB logo.
Corrigenda to ADB publications may be found at http://www.adb.org/publications/corrigenda.
Notes:
In this publication, “$” refers to United States dollars.
ADB recognizes "Laos" as the Lao People's Democratic Republic, "Korea" as the Republic of Korea, and "Vietnam" as Viet Nam.
Cover design by Mike Cortes.
Tables, Figures, and Maps v
Acknowledgments vii
Abbreviations viii
Weights and Measures ix
Currency Equivalents ix
1 Introduction 1
2 Overall Sector Context 2
2.1 Energy Resources 5
2.2 Energy Balance 10
3 Institutional Context 12
3.1 Government Institutions in the Power Sector 12
3.2 State-Owned Enterprises 14
3.3 Role of the Private Sector 16
3.4 Legal Framework 19
3.5 Policy Evolution 20
4 Core Sector Issues 22
4.1 Power Capacity and Generation 22
4.2 Domestic Demand 31
4.3 Transmission and Cross-Border Exports 35
4.4 Distribution and Tariffs 40
4.5 Climate Change and the Environment 42
4.6 Electrification and Access to Electricity 47
4.7 Energy Efficiency 50
5 Power Sector Constraints 52
5.1 Financial Sustainability of Électricité du Laos 52
5.2 Transmission Infrastructure Requirements 57
5.3 Regulation and the Need for Institutional Capacity Building 61
5.4 Realizing Hydropower Potential 63
6.6 ADB Sector Forward Strategy 68
6.7 Lending and Non-Lending Program and Resource Needs 69
6.8 Risks and Assumptions 70
7 Sector Road Map and Results Framework, 2018–2023 72
iv Contents | | | | | |
6 | Sector Strategy | | | | 64 |
| 6.1 Government Sector Strategy | | | | 64 |
| 6.2 ADB Sector Support Program and Experience | | | | 65 |
| 6.3 ADB Self-Evaluation | | | | 66 |
| 6.4 ADB Lessons Learned | | | | 66 |
| 6.5 Other Development Partner Support | | | | 67 |
Appendixes
1 Energy Sector Problem Tree 73
2 Power Plants of the Lao People’s Democratic Republic, as of 2017 74
3 Key Transmission Projects Proposed in the Lao People’s Democratic Republic 76
4 Pipeline of Hydropower Projects of the Lao People’s Democratic Republic 77
5 Laws and Regulations for Power Project Development 80
in the Lao People’s Democratic Republic
Tables
1 Summary of Lao Holding State Enterprise Project Investments, 15
as of December 2017
2 Current and Official Proposed Future Plant Type Mix in 30
the Lao People’s Democratic Republic
3 Renewable Energy Development Targets for 31
the Lao People’s Democratic Republic
4 System Average Interruption Duration Index and System Average 41
Interruption Frequency Index within Southeast Asia, 2013–2015
5 Intended Mitigation Activities to be Implemented by 44
the Lao People’s Democratic Republic in 2015–2020
6 Électricité du Laos Key Financial Ratios 53
7 EDL-Generation Public Company Key Financial Ratios 54
8 Regional Domestic Peak and Domestic Installed Capacity for 60
the Lao People’s Democratic Republic, 2017 and 2030
9 ADB Loan and Technical Assistance Support to the Power Sector in 65
the Lao People’s Democratic Republic, since 2005
Figures
1
Energy Intensity in the Lao People’s Democratic Republic 4
and Selected Southeast Asian Nations, 2005–2016
2 Historical Economic Growth and Per Capita Income in 5
the Lao People’s Democratic Republic
3 Visualization of Annual Runoff and Precipitation in the Mekong River 7
4 Solar Potential of Selected Members of the Association of Southeast 8
Asian Nations
5 Historical Total Energy Supply by Source and Final Energy Use by Sector in 11
the Lao People’s Democratic Republic, 2012–2016
6 Structure of the Power Sector in the Lao People’s Democratic Republic 13
7 Energy Generation Capacity by Sponsor Nation 19 8 Domestic and Export-Oriented Installed Capacity in 23
the Lao People’s Democratic Republic, as of 2017
9 Power Capacity in the Lao People’s Democratic Republic, 23
by Domestic Consumption and Export, and by Fuel Source, 2017
10 Past Domestic Generation, Short-Term Exports and Imports 24
11 Rainfall Trends in the Lao People’s Democratic Republic 25
12 Power Capacity for Domestic Consumption and the Adjusted Reserve 26
Margin in the Lao People’s Democratic Republic
17 Diurnal Demand Profile in Four Grids of the Lao People’s 33
Democratic Republic
18 Electricity Imports from Neighboring Countries to the Lao People’s 34
Democratic Republic in 2017 and Average Precipitation, 1960–2005
19 Transmission and Distribution Grid Losses in the Lao People’s 36
Democratic Republic, 2000–2016
20 Regional Peak Demand and Installed Capacity for Domestic 37
Consumption in the Lao People’s Democratic Republic, 2017
21 Tariff Trends of Key Customer Classes and Average Cost of Supply in 42
the Lao People’s Democratic Republic
vi Tables, Figures, and Maps | |
13 Outlook for Generation Serving the Domestic Market in | 27 |
the Lao People’s Democratic Republic 14 Export Power Capacity Outlook for the Lao People’s Democratic Republic | 28 |
15 Contracted Power Exports of the Lao People’s Democratic Republic | 29 |
16 Electricity Consumption in the Lao People’s Democratic Republic, by End-User Type, 2010–2017 | 32 |
22
National Electrification Levels in the Lao People’s Democratic Republic 48 23 Électricité du Laos Recurring Revenues, Costs, and Profit/Loss 53
24 Électricité du Laos Tariffs, 2017 55
25 Profile of Global Average Power Tariffs 56
Maps1 Transmission Network of the Lao People's Democratic Republic 3
2 Électricité du Laos Near-Term Transmission Expansion Plans in the North, Central 1, Central 2, and Southern Grids 39
3 Electrification Rate in the Lao People’s Democratic Republic, by Province, as of 2017 49
4 Électricité du Laos Long-Term 500-Kilovolt Transmission Plan 59
his report was prepared by a team from The Lantau Group under the technical supervision of Pradeep Tharakan, principal climate change specialist from the Energy Division, Southeast Asia Department, of the Asian Development Bank (ADB). Additional guidance and support were provided by Andrew Jeffries (director,
Energy Division, Southeast Asia Department, ADB). The team wishes to thank Yongping
Zhai, chief, Energy Sector Group, Sustainable Development and Climate Change Department, ADB, as the report's peer reviewer; Julie Casabianca, consultant, ADB, who provided contributions; and Elmar Elbling, consultant, ADB, who helped guide the final preparation of the report.
The team would also like to thank the Department of Energy Policy and Planning, Ministry of Energy and Mines, Électricité du Laos (EDL), EDL-Generation Public Company of the Lao People’s Democratic Republic (Lao PDR), and development partners for their inputs and discussions during the preparation of the report. The team is also grateful to ADB’s Lao PDR Resident Mission and Department of Communications for their support.
ADB | Asian Development Bank |
AFD | Agence Française de Développement |
ASEAN | Association of Southeast Asian Nations |
ASR | assessment, strategy, and road map |
BOT | build–operate–transfer |
CAGR | compound annual growth rate |
CPS | country partnership strategy |
DEB | Department of Energy Business |
EDL | Électricité du Laos |
EDL-Gen | EDL-Generation Public Company |
EEC | energy efficiency and conservation |
EGAT | Electricity Generating Authority of Thailand |
FDI | foreign direct investment |
GDP | gross domestic product |
GMS | Greater Mekong Subregion |
INDC | Intended Nationally Determined Contribution |
IPP | independent power producer |
JICA | Japan International Cooperation Agency |
Lao PDR | Lao People’s Democratic Republic |
LHSE | Lao Holding State Enterprise |
MEM | Ministry of Energy and Mines |
MOU | memorandum of understanding |
NSEDP | National Socio-Economic Development Plan |
PDP | power development plan |
PEA | Provincial Electricity Authority (Thailand) |
PPA | power purchase agreement |
PRC | People’s Republic of China |
PV | photovoltaic |
RPTCC | Regional Power Trade Coordination Committee |
SEA | strategic environmental assessment |
SHS | solar home system |
SOE | state-owned enterprise |
USAID | United States Agency for International Development |
Weights and Measures
GW gigawatt
GWh gigawatt-hour km kilometer kV kilovolt
kWh kilowatt-hour kWp kilowatt-peak mt million ton
MTOE million tons of oil equivalent
MW megawatt
MWh megawatt-hour TWh terawatt-hour Currency Equivalents
(as of 5 September 2019)
Currency unit – kip (KN)
KN1.00 = $ 0.00011
$1.00 = KN8,793.22
his sector assessment, strategy, and road map (ASR) reviews the state of the energy sector of the Lao People’s Democratic Republic (Lao PDR). Consistent with the government’s plans and strategy, the ASR proposes supportive actions for the energy
sector to be taken by the Asian Development Bank (ADB) during 2019–2022. It also provides sector background information, which will be updated as needed for investment and technical assistance operations. The ASR is a working paper based on a systematic review of the Lao PDR’s energy sector and consultations with the government and other development partners.
The ASR is linked with and informs ADB’s country partnership strategy (CPS) for the Lao PDR. The current CPS (2017–2020) sets out principles for assistance and partnership between ADB and the Lao PDR. The CPS is aligned with the government’s policies and priorities and draws upon ADB’s new Strategy 2030.[1] Published in July 2018, Strategy 2030 outlines a framework for ADB’s overall operations for 2030. The ASR will also be used for the preparation of the next CPS (2021–2025).
he Lao PDR is a landlocked nation in Southeast Asia with a total land area of 236,800 square kilometers and comprising 18 provinces.[2] It is characterized by a rugged mountainous topography and the north to south flow of the Mekong River,
which straddles much of the country’s long western frontier with Thailand. The Lao PDR also shares a border with Viet Nam to the east and adjoins Cambodia, Myanmar, and the Yunnan Province of the People’s Republic of China (PRC).
The population of the Lao PDR is one of the smallest in Southeast Asia and, as of July 2017, was estimated to be 7,126,706, having grown at a compound annual growth rate (CAGR) of 1.90% since 2010.[3] The Lao PDR is classed as a “lower middle-income country,” with per capita gross domestic product (GDP) of $2,027 in 2016, from $621 in 2006.[4][5] Map 1 provides a geographic overview of the country’s transmission network, which comprises the northern, central 1, central 2, and southern regions.
With a GDP of $17.15 billion as of 2017, the Lao PDR’s economy is the third smallest in Southeast Asia.[6] Having historically been a centrally planned economy prior to the introduction of the New Economic Mechanism in 1986, it has since developed its agricultural foundation into a market-oriented economy, of which around half is now tied to services (48.02%); the industrial sector accounts for 32.51% and the agricultural sector at 19.47% on a value-added basis.[7] Given the country’s small population, the economy is strongly intertwined with the development and export of natural resources, principally mining, hydropower, and timber extraction industries.[8]
The per capita electricity consumption of the Lao PDR, at 725 kilowatt-hours (kWh) in
2017, is one of the lowest in Southeast Asia.[9] However, the energy intensity of its economy
Map 1: Transmission Network of the Lao People’s Democratic Republic
Source: Électricité du Laos. 2017. Electricity Statistics 2016. Vientiane.
is higher than Indonesia, Myanmar, and the Philippines yet lower than Viet Nam as indicated by the steepness of the data series presented in Figure 1.[10] The Lao PDR also has very low carbon emissions, at 0.30 metric tons per capita in 2014 or 6% of the global average equivalent of 4.97 metric tons (footnote 9).
Notwithstanding its comparatively small size, the economic growth of the Lao PDR in recent years has been robust, with real GDP at an average annual growth rate of 7.67% between 2010 and 2016 as shown in Figure 2 (footnote 5).
The rate of economic growth is forecast to remain strong—albeit slowing down slightly—in the coming years with an average annual growth rate of 7.02% from 2018 to 2022 (footnote 5). Growth is expected to be buoyed by the commissioning of new hydropower projects and increased foreign investment, as the Lao PDR has established special economic zones to increase foreign direct investment (FDI) inflows.[11] The government has prioritized not only the electricity sector but also the agroforestry, tourism, mining, and construction sectors.[12]
Despite this positive near- to medium-term economic outlook, some prominent economic institutions—notably the International Monetary Fund (IMF), World Bank, and ADB—have highlighted that the ability of the Lao PDR to achieve sustainable and inclusive economic growth over the longer term will be tied to overcoming structural challenges and risks. These include reducing the current account deficit and lowering external debt-to-GDP and debt service-to-revenue ratios while strengthening public banks to achieve higher capital buffers. The risk of the country facing “external debt distress” is now risen from moderate to high, with the IMF calling for an urgent need for the country to develop a strategy for medium-term debt management, tighten its fiscal policy, and improve public financial management (footnote 10). Indeed, external debt has played a key role in financing capital-intensive hydropower projects.
2.1 Energy Resources
Compared with neighboring countries in the Greater Mekong Subregion (GMS), principally Thailand and Viet Nam, the Lao PDR is not blessed with abundant fossil fuel resources. The country relies on imports of close to 100% of petroleum products,[13] while estimates of coal reserves range between 600 million tons (mt) and 700 mt and mostly comprise lignite and small amounts of anthracite.13 The Lao PDR’s lignite resources are concentrated in Hongsa in Xayabuli Province to the northwest, where reserves are estimated to contain greater than 400 mt (footnote 13).
Coal is primarily used by cement factories along with a few small industrial users, with consumption totaling about 300,000 tons per year.[14] However, this pattern of coal use has changed markedly in recent years following the commissioning of the 1,878-megawatt (MW) lignite-fired thermal plant in Hongsa in 2015, which accounted for 34.9% of the overall generation mix in 2017.[15] The majority of the electricity generated from this plant (1,778 MW) is exported to Thailand, and 100 MW is sold to the Lao PDR’s state utility, Électricité du Laos (EDL).
Despite having somewhat modest fossil fuel resources, the Lao PDR has a vast hydropower potential owing to its positioning within the Mekong River, high precipitation levels, and mountainous topography that provides high levels of runoff (Figure 3).[16] The country’s exploitable hydro potential is estimated to be 23,000 MW, and 5,172 MW of hydropower capacity had been commissioned as of 2017 with several forthcoming projects at varying stages of development (footnote 15).
The ability of the Lao PDR to monetize its vast hydrological resources, both in terms of existing and future hydropower capacity, will have a major bearing on its ambition to be eligible to graduate from least-developed country status by 2024, in line with its national socioeconomic development plan.[17]
Hydropower makes a significant contribution to the overall economy. The government earns revenue from taxes, royalties, and dividends from EDL and independent power producers (IPPs), and, more broadly, the country benefits from substantial foreign private investment. Indeed, revenues from hydropower are forecast at 1.2% of GDP in 2018, with royalties accounting for 0.8% (footnote 10). While hydropower development is expected to drive future economic growth in the Lao PDR, the establishment of new power exchange arrangements will be an important prerequisite to help earn export revenues and to dispatch excess capacity.
Nearly half of the forthcoming hydropower projects in the Lao PDR are earmarked for cross-border exports. The country’s central location within the GMS allows it to supply electricity to sizable neighboring markets such as Thailand and Viet Nam; and to a lesser extent, also to Cambodia and Myanmar. The Lao PDR does, however, face challenges on several fronts in order to realize these ambitions. These include the financing burden and social and environmental impact of such projects, the parallel requirement to develop enabling transmission infrastructure, potential competition from cheaper exports from southern PRC where considerable surplus capacity exists, as well as the recent trend of importing countries to shore up their generation mix
with increased renewable energy and battery storage.[18] These issues are discussed further in sections 3, 4, and 5 of this report.
The Lao PDR is also endowed with significant resource potential for non-hydro renewables that includes solar, biomass, small or mini-hydro, and wind. Through its Renewable Energy Development Strategy, 2011–2025, the country is seeking to promote non-large hydropower renewable resources to reach a 30% share of the country’s total energy demand by 2025.[19] Thus far, the commercial-scale application of these renewable generation technologies is still very much in its infancy, limited in part by the absence of a feed-in tariff scheme. Equally, there has been no comprehensive study of the country’s overall energy potential that would otherwise allow an integrated approach to the planning and development of the country’s energy resources to take place.
Solar potential is estimated to be 4.4 kWh/square meter/day, within a range of 3.6–5.5 kWh/square meter/day and equating to 1,800–2,000 hours of sunlight per year.[20] While being more favorable in the south of the country, conditions for solar power are less favorable than most other Association of Southeast Asian Nations (ASEAN)
member countries owing to the Lao PDR’s mountainous and forested terrain, and are therefore a limiting factor for the development of utility-scale solar projects (Figure 4). That said, the seasonality in hydropower and solar irradiation occurs at different times of the year, thus providing a degree of complementarity that gives the potential for balancing year-round variations in generation and supply.
Thus far, the development of solar projects has amounted to 32 MW, following the commissioning of three government-led pilot projects in Vientiane in February 2017 (3 MW), August 2017 (7 MW), and May 2018 (22 MW).[21] While a further 68 MW of utility-scale solar photovoltaic (PV) projects are planned by 2020, scaling of utilityscale solar generation in the Lao PDR will require institutional and financial resources to support grid integration studies, site assessments, and cost–benefit analyses, which are traditionally integral to decisions to make such investments. Rooftop solar PV installations also exist at Wattay International Airport (236 kilowatt-peak [kWp]), EDL’s head office (178 kWp), the United Nations Development Programme office (18 kWp), and the Ministry of Industry and Commerce (10 kWp), among other locations (footnote 15).
Given the Lao PDR’s geography, there are inherent practical challenges to developing conventional ground-mounted solar in the country; to that end, installing floating solar on reservoirs used for hydropower generation and irrigation dams is being considered by ADB and other development partners as a potential pathway for more solar power deployment (explored further in section 4.5.1).
Despite the commercial-scale application of solar power being in its infancy, solar power has played an important role in spurring electrification in off-grid areas in the Lao PDR. Around 16,689 solar home systems (SHSs) are in operation across 379 remote villages. The potential for similar distributed technologies to further increase electrification in the country is discussed in section 4.6.[22]
Wind speeds in the Lao PDR are typically very low at around 1 meter/second, except in some mountainous areas, thus limiting the commercial application of wind power.[23] While estimates put the country’s addressable wind potential at 3,000–3,500 MW, the true potential for the technology is unknown. Indeed, pre-feasibility studies of wind potential have thus far only been undertaken in two districts in Savannakhet Province (64 MW) and one district of Champasak Province (50 MW).[24] Data collection is underway in Luang Prabang, Xayabuli, Xaisomboun, and Vientiane provinces, as well as Vientiane capital and the remaining districts of Champasak. Currently, there are no operational wind projects in the Lao PDR despite the 73 MW target via the Renewable Energy Development Strategy, 2011–2025,
Lao People’s Democratic Republic Energy Sector Assessment, Strategy, and Road Map
though private companies have signed some memorandums of understanding (MOUs) and memorandums of cooperation to date.
The Lao PDR also has significant biomass resources from agricultural and forestry wastes such as rice straw and husks, sawdust, and corn cobs, which are estimated to total 500 million tons of oil equivalent (MTOE) and support up to 938 MW of generation capacity (footnote 14). Biomass resources are principally used for energy in households, with more than 80% of the population relying on biomass energy for applications such as cooking. Biomass fuels are also used in small-scale industrial production in rural areas, such as alcohol production and tobacco processing.
In terms of the use of biomass in electricity generation, two bagasse-fueled plants totaling 39.7 MW of installed capacity are operational in the south of the country, and a 60 MW plant is under construction (footnote 24). Agricultural products and wastes also provide the Lao PDR with a high potential for biofuel production via the utilization of crops such as palm oil, soybean, and jatropha. Among the pilot projects to plant jatropha for biodiesel production is a 2,500-hectare plantation and biodiesel factory in Xayabuli Province that is capable of producing 2,000 liters per day (footnote 11). Biogas production is estimated to be able to support more than 313 MW of generation capacity.[25]
2.2 Energy Balance
The total primary energy supply in the Lao PDR was around 2.88 MTOE as of 2016, representing a CAGR of 1.3% since 2000.[26] Biomass accounted for nearly half of energy supplied (1.37 MTOE, 48%), followed by coal (0.40 MTOE, 14%), electricity generation (0.56 MTOE, 19%), imported petroleum products (0.49 MTOE, 17%), and electricity imports (0.07 MTOE, 2%) (Figure 5). Production from hydropower increased at a CAGR of 8.5% during 2012–2016; the Lao PDR has since pivoted and is now a net exporter of energy, predomi nantly supplying to Thailand and Viet Nam, and to a lesser extent to Cambodia and Myanmar.[27]
In 2016, total energy consumption stood at 2.46 MTOE, representing a CAGR of 2.4% since 2000 (footnote 26). Total energy consumption comprised 50.8% in biomass, 18.1% in petroleum products, 16.5% in electricity, and 14.6% in coal. At a sectoral level, residential consumers accounted for the largest share (74%) of total energy consumption, followed by the transport sector (19%) and industry (7%) (footnote 26).
3.1 Government Institutions in the Power Sector
Within the government, the Ministry of Energy and Mines (MEM) is primarily responsible for the power sector in the Lao PDR, with jurisdiction over energy policy, strategy, and management of the energy and the mining industries across the country. MEM oversees the activities of several state-owned enterprises (SOEs) involved in the energy sector: EDL, EDL-Generation Public Company (EDL-Gen), and its subsidiary EDL-Gen Solar (the roles of these SOEs are detailed in section 3.2). The Ministry of Finance supports the role of MEM by ensuring financial management and accountability within the energy sector, while also being in charge of strategy and investments of the aforementioned SOEs as well as Lao Holding State Enterprise (LHSE).[28] The Ministry of Planning and Investment and Ministry of Natural Resources and Environment also provide additional oversight to MEM. Figure 6 illustrates the structure of the Lao PDR’s power industry.
MEM underwent restructuring in September 2017 and currently consists of eight departments involved in policy and regulatory affairs.29 The departments include the Department of Energy Business (DEB), which is in charge of private sector investments, project development, and project monitoring within the Lao PDR’s power sector. More specifically, the responsibilities of DEB include
- reviewing investment proposals, processing technical feasibility studies, and, ultimately, approving generation projects over 15 MW;
- performing financial analysis on project feasibility to establish levies, taxes, returnon-investment, and debt arrangements for commercial lenders; and
- implementing project agreements, and monitoring and enforcing compliance under relevant legislation.[29]
Other departments within MEM include the Department of Energy Policy and Planning, which is responsible for formulating national energy policies and plans; implementing pricing policies for all types of supply; and supporting the DEB with environmental engineering, promotion, and review of hydropower projects at the MOU stage. The Department of Energy Management is in charge of drafting energyrelated laws, regulations, guidelines, and technical and safety standards, and monitors government agencies, SOEs, and private operators for compliance. The Department of Planning and Cooperation is responsible for coordinating various stakeholders such as central and local government agencies, private parties, nongovernment organizations, and foreign governments to engage in cooperation agreements and MOUs. The Institute of Renewable Energy Promotion is responsible for promoting renewable energy, energy conservation, and rural electrification. The Department of Mining Management oversees the administration and promotion of mining, mineral processing, and export and import of mineral products.
Due to the recent restructuring, EDL now assumes responsibility for the negotiation and preparation of documents for concession agreements (mandatory for IPPs to develop, own, and operate generation assets), as well as power purchase agreements (PPAs) and credit facilities (formerly under the mandate of DEB).
Outside of central government, provincial authorities support rural electrification through the operation of 85 mini-grids supplied by diesel generators, small hydropower, or other renewable sources, and assist with the preparation of regional power development plans (PDPs). Whereas MEM has the authority to approve generation projects of over 15 MW, provincial authorities are required to approve projects between 1 MW and 15 MW (footnote 30).
3.2 State-Owned Enterprises
Within the power sector in the Lao PDR, EDL and LHSE are the two dominant SOEs. Established in 1959, EDL is a state-owned, vertically-integrated electricity utility overseen by MEM and has been responsible for generation, transmission, distribution, and services to all grid-connected customers in the country since 1986.[30] EDL led the development of the Lao PDR’s first hydropower projects and, through its implementation of the national electrification program, has arguably played a central role in supporting socioeconomic development. Electrification levels increased from 36% in 2000 to 92% in 2016, and, for much of the population, access to electricity is one of the few tangible ways through which they interface with the state.[31]
From a commercial standpoint, EDL is the single buyer in the domestic power market. EDL also holds shares in four export-oriented hydropower plants that are in operation and several other independent power projects under construction (footnote 11). EDL-Gen, a public company owned by EDL, assumed ownership of nearly all EDL generation assets following its formation in 2010, and, together with EDL, both entities accounted for 813 MW of installed capacity and 2,849 gigawatt-hours (GWh) of generation in 2017.[32]
While the majority of investments in generation are undertaken by EDL, owing to its ability to secure debt financing at more attractive levels, ownership of generation assets is transferred to EDL-Gen following the commissioning of new power projects. However, in light of the high level of indebtedness of EDL, the government is currently considering the full unbundling of EDL into separate companies that would cover its generation, transmission, distribution, and operations and maintenance responsibilities and activities.
EDL-Gen, which is responsible for EDL’s generation activities, was established in December 2010 and is 75% owned by EDL and 25% by private investors[33] as listed on the Lao Securities Exchange. EDL-Gen operates by purchasing shares of existing and near-operational generation assets, including those of EDL, financed through the issuance of bonds and with loans, which collectively amounted to $1.08 billion as of mid-2017.[34] As such, EDL-Gen is the main generator that serves the domestic market in the Lao PDR, and as of 2017 accounted for installed capacity of 622 MW across 10 wholly owned projects, with generation of 2,610 GWh.[35]In addition, EDL-Gen owns equity stakes in several operational IPP hydropower projects (totaling 2,300 MW) that amount to 635 MW on an ownership-weighted basis (footnote 35). EDL-Gen is
Table 1: Summary of Lao Holding State Enterprise Project Investments, as of December 2017
Projects | Shareholding Structure | Capacity (MW) | Project Cost ($ million) | Debt/Equity Ratio | LHSE Equity ($ million) | LHSE (Funding Sources) |
Nam Theun 2 | EDF (France) 40% EGCO 35% LHSE 25% | 1,080 | 1,297 | 72/28 | 112.5 (real drawdown 93.4) | ADB, AFD, IDA, EIB, GOL |
Hongsa Mine Mouth Power | Power Plant: BANPU 40% RATCH 40% LHSE 20% Mining: BANPU 38% RATCH 38% LHSE 25% | 1,878 | 3,710 | 75/25 | 217.8 | Krung Thai Bank, Government Savings Bank |
Xe Pian-Xe Namnoy | SK Group (Republic of Korea) 26% Korea Western Power 25% RATCH 25% LHSE 24% | 410 | 1,020 | 70/30 | 100.6 | Krung Thai Bank, Economic Development Cooperation Fund |
Nam Ngiep 1 | KPIC Netherlands B.V. (Japan) 45% EGAT International 30% LHSE 25% | 290 | 906 | 71/29 | 103.5 | JBIC, Thai EXIM Bank, Bangkok Bank |
| | 3,658 | 6,933 | 73/27 | 534.4 | |
Note: Numbers may not sum precisely due to rounding.
ADB = Asian Development Bank, AFD = Agence Française de Développement, BANPU = Banpu Public Company Limited, EDF = Électricité de France, EGAT = Electricity Generating Authority of Thailand, EGCO = Electricity Generating Public Company Limited, EIB = European Investment Bank, GOL = Government of the Lao PDR, IDA = International Development Association, JBIC = Japan Bank for International Cooperation, LHSE = Lao Holding State Enterprise, MW = megawatt, RATCH = Ratchaburi Electricity Generating Holding Public Company Limited, Thai EXIM = Export–Import Bank of Thailand.
Source: LHSE. Project Investment. http://www.laoholding.com/Investment.aspx (accessed 27 February 2019).
also actively developing non-hydro renewable energy projects through its subsidiary EDL-Gen Solar.
EDL-Gen Solar is a small subsidiary of EDL-Gen and a relatively new entity, having been established in 2015 to focus on developing solar energy projects in the country. EDL-Gen Solar is majority owned by EDL-Gen, with the Thai firm Pattana Energy
Absolute Company Limited holding the remaining 40% stake (footnote 28). In August 2017, EDL-Gen Solar commissioned two solar pilot projects totaling 10 MW in Vientiane region, with a PPA having been signed with EDL in the following month. These first projects were financed by EDL-Gen (80%) with EDL-Gen Solar equity comprising the remaining 20%. An additional 22 MW of solar capacity reached commercial operation in May 2018. The price of the electricity sold to EDL is around $0.08 per kWh. EDL-Gen Solar has longer-term ambitions to develop an additional 100 MW of solar projects in the Lao PDR for domestic consumption and 500 MW at a later stage to provide exports to Thailand (footnote 28).
While EDL and its subsidiaries manage predominantly state-owned generation assets, LHSE is responsible for the state’s financial holdings in hydropower projects built by foreign and private investors. These projects are focused more on cross-border power exports than on serving the domestic market, and include the government’s 25% share in Nam Theun 2 Power Company and a 20% share in the Hongsa lignite mine mouth power project, among others (footnote 30). LHSE may also hold shares in other generation projects and transmission projects. Table 1 provides a summary of LHSE’s current project investments.
3.3 Role of the Private Sector
Foreign and private sector investors play a major role—in addition to the role of the Lao PDR’s SOEs—in the development of the Lao PDR’s generation, transmission, and distribution infrastructure. The country has been very successful in encouraging and attracting private investment and foreign direct investment (FDI) in power generation projects, and, as of the end of 2017, IPPs accounted for around 6.3 gigawatts (GW) (88%) of total installed capacity in the country.[36] The country also has a reasonably well-established framework for the participation of IPPs, which continue to play an essential role in the development of the power sector.
All IPPs must enter into concession agreements with the Lao PDR government, with the primary models being the build–operate–transfer (BOT) and build– own–operate–transfer for export-oriented IPP projects, typically with a term of 20–30 years.38Conversely, IPP projects supplying the domestic market are based on a build–own–operate model. IPPs seeking to develop power projects in the Lao PDR can submit either solicited or unsolicited proposals to the government via the Ministry of Planning and Investment, who in turn approach MEM to undertake technical feasibility study (e.g., system planning). IPP projects between 5 MW and 100 MW must be approved by the government upon consultation with stakeholders, while projects greater than 100 MW must be approved by the country’s National Assembly.[37]
Domestic PPAs between EDL and the private sector are negotiated on a project basis and lack a common framework for aspects such as contract size, tenor, and price (footnote 30). Indeed, while MEM’s Regulation on Domestic IPPs Purchasing Price
(2016) sets out United States (US) dollars as the settlement currency, the “model PPA” is instead denominated into a mixture of US dollars and kip (KN), the share of which varies over the project PPA lifetime.
Most of EDL’s domestic PPAs come with take-and-pay clauses,[38] where EDL is only responsible for the volume of electricity generated and sold according to predetermined unit cost. EDL pays out predetermined fees regardless of volume generated and sold (per take-or-pay clause) for a few PPAs with higher than 100 MW generation capacity, at least during the loan tenure (footnote 30). While for certain investors obtaining a PPA with a take-or-pay clause is a prerequisite for securing external financing, it could hamstring EDL financially should expected demand not materialize (discussed further in section 5.1.2).
Conversely, developers of export-oriented projects first secure a PPA with neighboring incumbents such as the Electricity Generating Authority of Thailand (EGAT). It is, however, understood that the Lao PDR government is seeking to promote EDL as a single buyer for all power contracts (both domestic and export) over the longer term. Such a transition would afford EDL considerable system flexibility by allowing it to supply the required amount of power contracted by its counterparts in Cambodia, Thailand, and Viet Nam from any substation along the border with each country, rather than dedicated 500-kilovolt (kV) and 230 kV transmission lines that traverse across the country at present. Indeed, a single buyer regime would allow for centralized and holistic system planning to take place and ultimately strengthen the Lao PDR’s position as an exporting nation. However, this increases the risk of export buyers to the EDL system and EDL itself and may have negative impacts on the ability of project developers to finance such projects.
The country benefits financially from the involvement of IPPs by earning royalties, collecting taxes, and in some cases receiving dividends. Government revenues from hydropower are expected to rise to 1.6% of GDP by 2021 from 1.0% in 2013–2014 (footnote 10). In practice, the materiality of these income streams is countered by the many incentives and exemptions provided to IPPs as set out below.
From an early stage, the Lao PDR has recognized the significant need to attract private and foreign investment to drive the development of generation infrastructure and increase cross-border power exports. The Law on the Promotion of Foreign Investment was promulgated in 2004, followed later in 2009 by the Law on Investment Promotion, which set out the provision of the following financial and nonfinancial incentives for investments in generation and transmission assets in the country:
(i) attractive return-on-investment levels;
(ii) no import duty on production machinery, equipment, and raw materials;
(iii) no import duty on chemical materials necessary for biofuels production within 7 years;
(iv) profit tax exemption for a certain period depending on activities, investment areas, and size of investment;
(v) subsidies on product depending on energy type;
(vi) lease period of up to 75 years;
(vii) permission to repatriate income to home or other countries; and
(viii) permission to employ foreign workers, but not more than 10% of the total company employment (footnote 11).
Amendments made to the Law on Investment Promotion in April 2017 have seen the removal of minimum registered capital requirements for foreign investors, along with changes in investment incentives (profit tax and concession fee exemptions) for certain promoted business sectors and/or within designated economic zones.
In addition to these financial and nonfinancial incentives, financial support in the form of state-backed investments in IPP generation projects is provided to encourage foreign and private investments in the Lao PDR’s power sector. Despite changes in the Electricity Law in 2011 that removed the legal requirement for the government to invest in IPP projects, both EDL-Gen and LHSE continue to provide financial support by investing in many IPP projects, most of which are financed through debt (footnote 30). LHSE, whose financial interests in IPP projects are tied to assets that export to neighboring markets, may need to be increasingly selective in taking equity stakes in such projects over the longer term, particularly given the long lead times for developing such projects and correspondingly the long period before which returns are seen. More broadly, the country’s legal framework has also been improved to facilitate international financing of projects, and offshore bank accounts are also permitted.
FDI has driven much of the growth in the Lao PDR’s generation capacity. When accounting for projects under development, 74.6% of the total installed capacity will be foreign sponsored by 2030, with the PRC accounting for 28.9% and Thailand for 23.8% (Figure 7).
Overseas investment has played a role supporting growth in the country’s national transmission and distribution infrastructure, with EDL entering into BOT contracts that were considered to be relatively inexpensive on an upfront basis. However, the short tenor of these contracts, many only 6–7 years, and the high cost of funding have added to the financial strain currently facing EDL, which could have been lessened through longer tenor contracts, which provide sufficient time for
investment costs to be recovered. Additional issues surrounding the quality of national transmission and distribution infrastructure have also been reported and have the potential to exacerbate the financial burden. Going forward, a more thorough and competitive contracting framework is required, along with the transition to more cost-reflective tariffs.
3.4 Legal Framework
The Electricity Law of 1997, later revised in 2008, 2011, and 2018, provides the legal framework underpinning the Lao PDR’s power sector and establishes the principles, regulations, and measures that govern activities therein. The Electricity Law seeks to promote the sustainable and efficient use of energy resources to support socioeconomic development. At a more actionable level, the Electricity Law requires that electricity development plans be developed at a strategic level and over long-, medium-, and short-term time frames, with the dual objective of promoting cross-border power exports and meeting domestic electricity requirements to drive socioeconomic growth.
The most recent revision to the Electricity Law, promulgated in August 2018, requires the preparation of a 10-year power development strategy to set out the road map for the power sector. The Electricity Law also stipulates that PDPs be prepared at both the national and provincial levels, and that such PDPs cover 5 years, marking a change from previous PDPs that spanned 10- to 15-year windows. PDPs set out generation and transmission requirements to meet forecasted domestic and export demand and are supplemented by a funding and budgetary plan for the development of new projects (footnote 39). The power development strategy and PDPs must align with the country’s socioeconomic development plan, and thus, to the extent possible, keep tariffs low and ensure that water resources, land, and forestry are utilized and managed in an integrated and legally compliant manner.
3.5 Policy Evolution
Since its first Power Sector Policy in 1990, the Lao PDR has continued to enact significant policy reforms that guide the development of the power sector. While changing in language and nuance over the years, the country’s strategic priorities have followed consistent themes:
(i) promote electricity exports across the ASEAN, particularly to neighboring Thailand and Viet Nam, as a means of generating foreign exchange to finance the Lao PDR’s socioeconomic development;
(ii) develop indigenous hydropower resources, with an increasing focus on the participation of private sector foreign investment to build generation infrastructure (footnote 32);
(iii) provide reliable and sustainable electricity supply to the population through affordable tariffs;
(iv) improve electrification, particularly in rural areas (with electrification targets of 70% by 2010 and 90% by 2020 both surpassed ahead of schedule); and
(v) encourage both domestic and foreign entities to invest in electricity businesses and activities while promoting cooperation within the sector at regional and international levels.
The National Policy on Sustainable Hydropower Development in Lao PDR, reflecting the central role that hydropower plays in the power sector and its broader economic contribution, was implemented in 2015. The policy requires project developers and government agencies to undertake due analysis of technical, engineering, financial, environmental, and social considerations on hydro projects larger than 15 MW. The environmental implications of the policy are explored further in section 4.5.1.
The government’s 8th National Socio-Economic Development Plan (NSEDP) 2016-2020, approved in April 2016, serves as the most recent platform for the implementation of the country’s socioeconomic development objectives.[39] Within the 8th NSEDP, “Vision 2030” targets the Lao PDR’s eligibility for graduation from
least-developed country status by 2020 and ascension to an upper middle-income developing country by 2030. The 8th NSEDP sets out that Vision 2030 requires sustainable economic, social, and environmental development and—recognizing that expanded access to modern and affordable forms of energy and better utilization of current energy resources will play an essential role—prioritizes the need to develop the energy sector in a cost-effective, inclusive, and sustainable manner. The 8th NSEDP is discussed further in section 6.1. Specific objectives that it sets out include
(i) achieving a household electrification ratio of 95% by 2020, at reasonable costs;
(ii) utilizing available energy resources by recognizing their competitiveness, sustainability, and efficiency; and
(iii) improving grid connections across the ASEAN through the improvement of transmission infrastructure and harmonization of technical standard.
4.1 Power Capacity and Generation
4.1.2 Existing Capacity and Generation
Installed capacity for domestic supply stood at 2,526 MW as of December 2017 with annual generation of 7.0 terawatt-hours (TWh) as shown in Figure 8. Generation capacity allocated for export was 4,550 MW, with an estimated generation of 24.3 TWh.[40]
Aggregate installed generation capacity in the Lao PDR saw a particularly sharp rise between 2014 and 2017, owing largely to the commencement of operations of the three units at the Hongsa mine mouth lignite-fired power plant, a principally exportdriven project. In addition, several hydropower plants serving the domestic market were commissioned (such as Nam Ou 2/5/6, Nam Ngiep 2, and Houay Lamphangnay) and precipitated a state of excess domestic capacity, wherein 2017 year-end capacity was 2,526 MW compared with an annual peak demand of 928.2 MW (footnote 42).
At 1,878 MW, Hongsa represents the country’s only large-scale form of thermal baseload generation supply. The majority of the plant’s capacity is contracted for export to Thailand, with only 100 MW designated for sale to EDL (footnote 11). As outlined in section 2.1, there are modest lignite reserves of approximately 400 million tons (mt) in Xayabuli Province where Hongsa is situated, while 12.8 mt of the 14.8 mt of lignite mined each year serve the mine mouth plant. Based on the 25-year PPA lifetime and running at a baseload capacity factor, the Hongsa power plant would consume 320 mt of lignite equating to around 80% of estimated local lignite reserves.
Despite the addition of the lignite-fired plant at Hongsa, the Lao PDR’s generation mix is still dominated by hydropower projects, which account for the majority of the country’s operational power plants and approximately 73% of overall generation capacity (Figure 9). Conversely, the large lignite-fired plant in Hongsa accounts for 26% of capacity, while two plants fueled by sugarcane bagasse account for less than 1% of capacity.
Figure 10: Past Domestic Generation, Short-Term Exports and Imports
8,000
7,000
6,000
5,000
4,000
3,000
2,000
1,000
0
-1,000 2010 2011 2012 2013 2014 2015
-2,000 2016
PRC Imports Thailand Imports Cambodia Short Term Exports
Domestic Generation Viet Nam Imports Thailand Short Term Exports Net Generation
GWh = gigawatt-hour.
Sources: Tokyo Electric Power Company Holdings, Inc. and Hokuriku Electric Power Company,
Inc. 2017. Study on Independent Power Producers (IPPs) in the Lao PDR; Government of the Lao PDR,
Ministry of Energy and Mines. 2018. Electricity Statistics 2017. Vientiane; Électricité du Laos. 2016. Country Presentation. Presentation prepared for the 21st Meeting of the Regional Power Trade Coordination
Committee. Siem Reap. 8–9 December; and Government of the Lao PDR, Ministry of Energy and Mines. 2016. Power Development Plan 2016–2030. Vientiane; and ADB. 2017. Lao PDR: Accelerating Structural Transformation for Inclusive Growth: Country Diagnostic Study. Manila.
Recent trends in domestic generation, cross-border exports, and short-term imports are summarized in Figure 10.[41] While additions to domestic capacity have helped propel generation upward and increased short-term exports to Thailand, the Lao PDR has historically relied on imports from Thailand to balance the effects of the dry season, where both high domestic demand and lower dependable hydropower capacity coincide to drive system tightness. At the same time, a lack of transmission capacity has limited the ability to move power from the north to the south. Issues of seasonality, imports, and exports are discussed further in sections 4.2.1 and 4.3.
An analysis of capacity data, commissioning dates, and plant capacity factors indicates that close to 1,350 MW of domestic capacity[42] was commissioned from 2014 to 2017, which more than doubled the existing national capacity from 1,176 MW to 2,526 MW.[43] Interestingly, this translated into only a 70% increase in domestic generation over
the same period to 7.0 TWh, and thus did not wholly track the increase in capacity for several reasons. First, most of these new hydropower plants were reservoirbacked projects and not run-of-river, therein requiring a few years to fill up before full generation can be achieved. Second, some existing plants are functioning at capacity factors well below design potential.[44] The average capacity factor of Nam Song (6 MW) is at 17.5% while that of Nam Ngiep 3A (44 MW) is at 15.1% between 2015 and 2016. While the precise reasons are unknown for the lag in output, the average rainfall in 2014 and 2015 may also be a contributing factor (Figure 11).
4.1.2 Forecast Capacity and Generation
The Lao PDR has abundant hydro resources with an estimated exploitable potential of around 23 GW when the country’s share of the Mekong River is taken into account (footnote 28). The country’s mountainous and upland topography provide a significant amount of water catchment. Based on an analysis of projects coming online by 2030, total hydropower build-out for both domestic and export use will total 16.5 GW or around 70% of estimated potential, with 8.7 GW serving the domestic market and 7.8 GW being export-oriented (footnote 42).
Forthcoming power capacity additions and associated generation forecasts have been informed by an analysis of several documents provided by the Lao PDR authorities and reports from visiting foreign missions.[45] Analysis indicates that domestically, by 2030, peak generation demand will have risen to 3,990 MW, equating to a compound annual growth rate (CAGR) of 11%, while generation will increase to 37 TWh, equating to a CAGR of 13%, indicating a slight rise in the system load factor.[46] This impressive rate of growth is driven, in particular, by ever-increasing levels of electrification outlined in official plans and growth from the industrial sector. Demand by extractive industries is a trend that is likely to continue in light of the build-out of several large and energyintensive mining projects; however, it is worth noting that the mining industry is cyclical and vulnerable to fluctuations in commodity prices.[47]
Generation Capacity Serving the Domestic Market
The vast bulk of new capacity additions in the Lao PDR will be hydropower, and there are close to 12,000 MW of domestic hydro projects at various stages of development. However, a project-by-project analysis that excludes those projects that have been subject to numerous project development agreement and MOU renewals, have not reached construction agreement stage, and/or cannot attract robust sponsors indicates that around 6,250 MW of hydropower projects are likely to come online between 2018 and 2030 (Figure 12).[48]
In the immediate future, the addition of 6,250 MW of domestic hydropower plants will shift the domestic power sector to a state of substantial excess capacity, which is reflected in an adjusted wet season reserve margin[49] that reaches 52.6% by 2023, and which is expected to entirely remove the need for imports within the next 2 years even during the dry season. Domestic generation is forecast to rise to 37 TWh by 2030 from 7.0 TWh in 2017, or at a CAGR of 13% (Figure 13).
On a capacity basis, the hydropower generation in the Lao PDR is largely comprised of reservoirs, but run-of-river hydro is accounting for a substantial portion of new build. By 2030, reservoirs and run of river could each account for half of hydro installed capacity (footnote 42). By 2020, there will be close to 400 MW in hydro capacity accounted for by 50 power plants of less than 15 MW, with such plants serving domestic demand rather than the export market. By 2030, a further 400 MW of small-hydro could be added to the fleet by 90 plants if all planned projects are built. That would take the small-hydro capacity to 800 MW out of a total installed capacity of close to 18,000 MW (footnote 42).
On its present trajectory, the substantial increase in generation capacity and resulting oversupply in the coming years will likely not improve until the late 2020s, when adjusted reserve margins level off to reach 26.7% by 2030. In the near- to mediumterm, this presents a challenge to EDL on several fronts. One of the foremost issues is that it is set to increase the financial burden on EDL because of the liabilities it will face due to most domestic PPAs having take-or-pay clauses. It will also require a significant build-out and strengthening of the transmission and distribution grids in the country, and these costs will invariably need to rise if the country is to find a way to export their surplus power. These issues and constraints are discussed further in sections 4.3 and 4.4.
While the country’s outlook for new build is focused on export-oriented hydropower projects, which in turn form a central part of its economic development strategy,52 the ability of the Lao PDR to meet its own domestic needs across all regions will need to be carefully balanced with the desire for greater exports. As an example, the large Nam Thuen 2 hydro plant in the central 2 area provides 1,000 MW of capacity for exports to Thailand with EDL taking just 75 MW, yet the demand–supply balance in
52 Government of the Lao PDR, Ministry of Energy and Mines, Department of Energy Policy and Planning.
2015. Energy Policy August 2015. Vientiane.
central 2 is tight and in the adjoining southern region is negative. Moreover, exportoriented IPP project capacity is, with a few exceptions, directly connected to the respective transmission network of the off-taker, meaning that such plants are not physically capable of serving the domestic market.
Export-Oriented Generation Capacity
The trend in export-oriented capacity additions beyond 2017 is similarly dominated by hydropower (Figure 14). The growth profile for export hydro capacity is “lumpy” compared with that for domestic hydro because most export-oriented projects are quite large and much fewer than smaller domestically oriented projects. There are no additions of lignite for export as the four proposed lignite power plants are marked for domestic use. If the Lao PDR were to build grid solar, it would be most likely to support rural distributed residential demand and not exported.
Contracted power exports are forecast to rise to 50 TWh by 2030 from 16 TWh in
2016, or at a CAGR of 9% (Figure 15).[50]
Diversification of the Generation Mix and New Renewable Technologies
With a view to lowering the seasonality risks associated with the high weighting of hydropower in the generation mix, the authorities in the Lao PDR have indicated a desire to introduce more thermal capacity in the fuel mix (Table 2). This is most likely to be lignite-fired plants, but progress on proposed projects is slow.[51]
Non-hydro renewables, such as solar and wind, would similarly provide a means for the Lao PDR to diversify its generation mix, yet currently lack any visibility in the Lao PDR’s long-term PDP.[52] This is partly a reflection of MEM’s unwillingness to subsidize any additional cost of renewable energy and the challenges of deploying renewables in an environment where end-user tariffs are already below cost recovery levels for conventional forms of generation (discussed in section 4.4.1). No feed-in tariffs are planned for domestic sales to EDL, meaning that renewable energies will need to be competitive to allow their rollout (footnote 28).
Utility-scale solar is increasingly gaining traction in countries such as Thailand and the Philippines. But the mountainous and forested geography of the Lao PDR also presents practical challenges to increasing capacity. Thus far, 32 MW of pilot solar projects have been completed by May 2018 (footnote 21). With this progress, the Lao PDR is on track to meet its 2020 target of 36 MW stated under the Renewable Energy
Development Strategy, 2011–2025 as shown in Table 3.[53]
As there are practical challenges to developing conventional ground-mounted solar within the country, floating solar has recently become prominent in discussions regarding renewable energy deployment. Floating solar, sited on reservoirs used for hydropower generation and irrigation dams, not only circumvents land constraint issues but also provides essentially “symbiotic” benefits. These benefits include reducing water evaporation from reservoirs, thus improving hydropower capacity factors, and boosting the energy yield from solar PV due to the convection cooling effect of the water. Floating solar can also use existing transmission resources in a
Table 2: Current and Official Proposed Future Plant Type Mix in the Lao People’s Democratic Republic
Plant Type | Present % of Capacity | % of the fleet by 2030 |
Reservoir hydro | 75 | 40 |
Run-of-river hydro | 20 | 40 |
Thermal | 5 | 20 |
Sources: Tokyo Electric Power Company Holdings, Inc. and Hokuriku Electric Power Company, Inc. 2017. Study on Independent Power Producers (IPPs) in the Lao PDR; Government of the Lao PDR, Ministry of Energy and Mines. 2018. Electricity Statistics 2017. Vientiane; Électricité du Laos. 2016. Country Presentation. Presentation prepared for the 21st Meeting of the Regional Power Trade Coordination Committee. Siem Reap. 8–9 December; and Government of the Lao PDR, Ministry of Energy and Mines. 2016. Power Development Plan 2016–2030. Vientiane.
Table 3: Renewable Energy Development Targets for the Lao People’s Democratic Republic
Source | Target 2010–2015 (cumulative MW) | Target 2016–2020 (cumulative MW) | Target 2021–2025 (cumulative MW) |
Small hydro | 80 | 134 | |
Solar | 22 | 36 | |
Wind | 6 | 12 | 73 |
Biomass | 13 | 24 | 58 |
Biogas | 10 | 19 | 51 |
Municipal solid waste | 9 | 17 | 36 |
| 140 | 242 | 651 |
Lao PDR = Lao People’s Democratic Republic, MW = megawatt.
Source: Government of the Lao PDR, Ministry of Energy and Mines, Institute of Renewable Energy Promotion. 2016. Renewable Energy Data in Lao PDR. Paper prepared for the East and Southeast Asia Renewable Energy Statistic Training Workshop. Bangkok. 12–14 December.
symbiotic manner with storage hydro. Perhaps more importantly, the integration of solar power with hydropower would mitigate the effects of hydro resource seasonality and, depending on the relative proportion of solar that could be installed, allow for generation optimization that provides increased dispatchable energy supply akin to more of a baseload operating regime, as opposed to mid-merit or peaking. The fast ramp rates of hydropower generation mean that solar intermittency can also be balanced.
In November 2017, ADB identified the potential for several GW of floating solar within the Lao PDR, of which over 1 GW could conservatively be deployed at the large reservoirs of Nam Ngum 1, Nam Ngum 2, Nakai, and Nam Gnouang.[54] Among other benefits cited by ADB are the ability for floating solar to be deployed quickly in the country (over 1,000 MW per annum), its modular nature allowing the initial capital outlay to be minimized, and its scalability (it can track underlying demand growth). Integration of floating solar and hydropower generation would also allow existing transmission lines to be utilized or upgraded, thus mitigating the need for greenfield transmission capacity to be developed (footnote 28).
4.2 Domestic Demand
Electricity consumption in the Lao PDR stood at 4.97 TWh in 2017, with peak demand reaching 928.2 MW and, after adjusting for losses, an estimated generation peak at 955 MW.[55] The country has experienced a rapid increase in domestic electricity demand in recent years, experiencing a CAGR of close to 9.5% during 2007–2017 (footnote 15). Over the same period, electricity consumption per capita rose from 218 kWh to 725 kWh per capita but remains one of the lowest in Southeast Asia (footnotes 9 and 15).
Increases in demand have occurred in tandem with strong economic growth, and, at a sectoral level, have been spurred by the residential sector and improved levels of electrification, with growth transitioning in recent years to the industrial sector. Indeed, the industrial sector is now the most significant driver of demand growth, having risen almost threefold during 2010–2017 at a CAGR of 16.7%, and at 2.09 TWh, accounted for 42% of total consumption in 2017. In the residential sector, demand rose by a CAGR of 9.8% during 2010–2017 to 1.81 TWh and accounts for 37% of total consumption. Growth in the commercial sector has been more modest, however, rising by a CAGR of 3.8% and at 0.76 GWh, accounted for 15.3% of total consumption (Figure 16).
At a more granular level, peak demand typically occurs between April and May each year, coinciding with seasonally higher temperatures that drive domestic and commercial loads higher. Figure 17 shows the diurnal composition of the country’s electricity demand, in this case during the peak day of 2016. Central 1 region, which includes Vientiane, accounts for around 53% of daily peak demand and also a significant proportion of the “diurnal flex” that sees peak demand occur in the evening.
4.2.1 Seasonality and Imports
The impressive demand growth in the Lao PDR, particularly from the industrial sector, has not always been matched by the ability of domestic generation supply to meet it, and imports from neighboring countries, particularly Thailand, accounted for around 20% of domestic consumption during 2009–2016.[56] In 2017, 85% of imports came from Thailand, with the EGAT transmission system accounting for 66% of imports and approximately 19% from the low-voltage grids of Thailand’s Provincial Electricity Authority (PEA) (footnote 15). Figure 18 highlights the composition of the Lao PDR’s imports during 2017 and their higher magnitude during the dry season.
The country’s reliance on power imports has especially been the case during the peak of the dry season in January–April, as precipitation and Mekong River flows, which drive hydropower generation, reach maximum levels between July and September each year. The tightness caused by this counter-cyclicality of higher domestic demand (which peaks during April and May) and lower hydropower generation has resulted in brownouts for large industrial users in the central 2 and southern grids in the past.
Against the backdrop of the Lao PDR now being a major exporter of power to
Thailand, the latter’s ability—via EGAT and PEA—to still provide flexible supply
Figure 18: Electricity Imports from Neighboring Countries to the Lao People’s Democratic Republic in 2017 and Average Precipitation, 1960–2005
100 400
90 350
80
300 70
60 250
50 200
40 150
30
100
20
10 50
0 -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Thailand (EGAT) Thailand (PEA) PRC Viet Nam Average precipitation (RHS)
EGAT = Electricity Generating Authority of Thailand, GWh = gigawatt-hour, Lao PDR = Lao People’s Democratic Republic, mm = millimeter, PEA = Provincial Electricity Authority (Thailand), RHS = right-hand side axis.
Note: EGAT imports include electricity supplied to the Sepon mine.
Sources: Électricité du Laos. 2016. Country Presentation. Presentation prepared for the 21st Meeting of the Regional Power Trade Coordination Committee. Siem Reap. 8–9 December; Government of the Lao PDR, Ministry of Energy and Mines. 2018. Electricity Statistics 2017. Vientiane; World Bank. Climate Change Knowledge Portal. http://sdwebx.worldbank.org/climateportal/ (accessed 3 March 2018).
during periods of seasonal tightness in the Lao PDR offers a good example of regional cooperation within the Greater Mekong Subregion (GMS). Most imports of power from the PEA are to the central 2 and southern grids and, while offsetting seasonal swings in hydropower generation, have also been required to supply burgeoning growth in the mining sector and within special economic zones.[57]
Given the significant increase in domestic capacity build-out and the continued rise in adjusted reserve margin expected in the next few years, MEM expects that imports will no longer be needed within the next 2 years, even during the dry season. However, the inability of EDL to pass the costs of these imports to end-users through the prevailing tariff regime has been one of the several factors contributing to EDL’s precarious financial position.
The cost of imported power through trading with EGAT has broadly matched the price of EDL’s energy sales, with spot sales by EGAT priced at a wholesale level. During 2011–2013, the prices averaged around $43/megawatt-hour (MWh) (footnote 59) and were $40/MWh in 2016, slightly below the wholesale price of domestic power from EDL-Gen of $50/MWh.[58] In 2015, the estimated price of all sales of power to Thailand, spot and under PPAs, was close to $35/MWh,[59] and the price of spot sales in 2016 was $37/MWh (footnote 61).
However, EDL’s purchases of spot power from PEA have been priced at prevailing retail rates and have been expensive, as they include demand charges and wheeling rates. During 2010–2013, the cost of these imports ranged from $100/MWh to $120/MWh (footnote 59) and was $103/MWh in 2016 (footnote 61). Volumes imported from the PEA in 2016 represented only 20% of the volumes imported from EGAT, the higher price meant that the PEA accounted for 33% of the cost ($32 million) of all imported power.
4.3 Transmission and Cross-Border Exports
The Lao PDR’s transmission network is operated by EDL and comprises four grid regions across the north, central 1, central 2, and south. Grid expansion and development undertaken during 2009–2011 resulted in a now moderately interconnected transmission grid; before this, each regional grid operated as discrete 115-kilovolt (kV) systems, while the central region was split into central 1 and central 2. As of 2017, the national high-voltage transmission network consisted of 11,301 kilometers (km), predominantly 115 kV and 230 kV lines, with only 462 km rated at 500 kV (footnote 15).
Several high-voltage lines exist and are used for exports. Three 500 kV lines and two 230 kV lines are dedicated for export to Thailand. Two additional 230 kV lines are for export to Viet Nam. Seven 115 kV lines facilitate power exchange between Cambodia (1), the PRC (1), and Thailand (5). Nineteen medium-voltage (22 kV and 35 kV) lines are dedicated for import from all five neighbors: Cambodia (1), Myanmar (1), the PRC (3), Thailand (7), and Viet Nam (7).[60] While the majority of high-voltage transmission lines are owned by EDL, five export-oriented IPP projects also have dedicated transmission lines to interconnect directly with EGAT’s grid (footnote 59).
Transmission and distribution losses have exhibited a downtrend since 2000 and have stabilized around 10%–13% since 2009 (Figure 19). This improvement has been brought about by grid reinforcement and upgrading of power transmission and distribution systems, and, as suspected, by a reduction in nontechnical losses. Further improvements to the transmission and distribution systems were outlined in the long-term transmission development plan presented by EDL at the 21st meeting
of the Regional Power Trade Coordination Committee (RPTCC) in December 2016. Notwithstanding, losses have risen slightly in recent years for unclear reasons.
The disparity between peak demand by region and the capacity for the domestic market in each region highlights the need for adequate transmission to meet peak demand. Installed capacity is well over peak demand in the northern and central 1 regions, but the demand–supply balance is much tighter in the central 2 region, for instance, particularly when considering the seasonality risks associated with hydropower generation (Figure 20).
Based on the regional misalignment of demand–supply balances, it is evident that some capability strengthening in system planning could help the Lao PDR improve the technical, and thus economic, efficiency of its power grid. Furthermore, the EDL grid lacks any formal provision for ancillary services, and the governor control function of generating units is not managed properly. As a result, EDL essentially relies on the neighboring EGAT transmission grid, with which it is interconnected, to implicitly provide frequency response.[61] While the Lao Grid Code refers to frequency control and voltage levels, many of them are not implemented due to lack of resources.
In the near- to medium-term, the underdeveloped nature of the EDL transmission grid raises significant issues in terms of its technical fragility, geographic scope, and ability to accommodate the considerable amount of new domestic capacity coming
Figure 20: Regional Peak Demand and Installed Capacity for Domestic Consumption
in the Lao People’s Democratic Republic, 2017
1,250
1,000
750
550
250
0
North Central 1 Central 2 South
Peak demand Capacity (Domestic)
MW = megawatt.
Sources: Tokyo Electric Power Company Holdings, Inc. and Hokuriku Electric Power Company, Inc. 2017. Study on Independent Power Producers (IPPs) in the Lao PDR; Government of the Lao PDR, Ministry of Energy and Mines. 2018. Electricity Statistics 2017. Vientiane; Électricité du Laos. 2016. Country Presentation. Presentation prepared for the 21st Meeting of the Regional Power Trade Coordination
Committee. Siem Reap. 8–9 December; and Government of the Lao PDR, Ministry of Energy and Mines. 2016. Power Development Plan 2016–2030. Vientiane; and ADB. 2017. Lao PDR: Accelerating Structural Transformation for Inclusive Growth: Country Diagnostic Study. Manila.
online. In the longer term, and when combined with the lack of harmonization of technical standards, it also highlights the challenges in any implementation of regional power trading arrangements either within the GMS or across the ASEAN regional bloc. Indeed, ASEAN countries are working toward setting up arrangements for electricity swaps and trading within the region via the ASEAN Power Grid, with the Lao PDR as a key proponent of the initiative as it seeks to export more electricity.
Seeking to address these issues, the Japan International Cooperation Agency (JICA) started a 25-month collaboration with MEM’s Department of Energy Policy and Planning and EDL in September 2017, aimed at developing a national transmission master plan.[62] Among the projects being considered are high-voltage transboundary interconnections (discussed further in section 5.1.2).
It is important to note that introducing regional power trading will also invariably face challenges beyond the technical domain and in establishing a robust regulatory environment that has the buy-in of all counterparts. Issues that will need to be overcome include arrangements and charging for wheeling, settlement, and apportioning taxes and duties, and how to facilitate open access.
4.3.1 Existing Cross-Border Arrangements
Owing to its central position within the GMS and vast hydropower potential, the Lao PDR has held long-standing ambitions to be a major provider of cross-border power exports. Power exports currently account for around two-thirds of hydropower generation and represent 15% of the country’s export earnings, being eclipsed by copper and copper ores that account for a combined 25% of exports.[63]
The country currently has 32–33 interconnections with its neighbors, including
Cambodia (2), Myanmar (1), the PRC (4), Thailand (17), and Viet Nam (7) (footnote
59). MOUs and cooperation agreements are in place to supply Thailand (up to 9 GW),67 Viet Nam (up to 5 GW),[64] and Cambodia (up to 1.5 GW) by 2020. MEM has also signed an MOU with Myanmar’s Ministry of Electricity and Energy with a view to securing exports for 300–500 MW.
Thailand has continued to be the main off-taker of exported power. Exports to Viet Nam have begun only recently with around 1 GW at present and MEM expecting a further 1.5 GW by 2025. In September 2017, the Lao PDR signed an energy purchase and wheeling agreement with Malaysia and Thailand, representing the first multilateral energy exchange or trade in the ASEAN and facilitating multilateral cross-border power trade beyond the Lao PDR’s immediate neighbors. Under the 2-year agreement, the Lao PDR is to sell up to 100 MW of electricity to Malaysia via Thailand’s power transmission grid, beginning on 1 January 2018.[65]
4.3.2 Near-Term Transmission Expansion Plans
Through its existing long-term PDP, the Lao PDR has considerable plans for the development of transmission infrastructure, the aims of which are two-fold: (i) to facilitate growth and improve resiliency in domestic supply and consumption and (ii) to enable increased cross-border exports. As discussed in section 3.3, the government is ultimately aspiring to facilitate cross-border power trade through gridto-grid interconnections rather than through plant-specific, dedicated export lines at present.
The country has plans to install 25 more transmission lines and associated substations by 2025 (footnote 59). Plans include nine new cross-border high-voltage lines, six of which will be owned by EDL, including the first high-voltage transmission line for export to Myanmar. Owing to the lack of progress with financing and intergovernmental MOUs, it is unclear how much of the government’s plans will be realized. The transmission grid development in the Lao PDR is also essential for creating an integrated power market in the GMS—a common goal of the GMS
Map 2: Électricité du Laos Near-Term Transmission Expansion Plans in the North, Central 1, Central 2, and Southern Grids
kV = kilovolt.
Source: Électricité du Laos. 2016. Country Presentation. Presentation prepared for the 21st Meeting of the Regional Power Trade Coordination Committee. Siem Reap. 8–9 December.
countries. Although the aforementioned lack of technical standards and need for harmonization are pressing concerns.
Significant improvements and extensions to the high-voltage transmission grid will also serve to mitigate regional imbalances in supply–demand and reduce the risk of brownouts, which have affected large industrial users in the past, such as the openpit copper mine in Sepon. In the north and central 1 regions, the transmission grid will be expanded through six 115 kV lines of 458 km and six 230 kV lines of 216 km, while in the central 2 and southern regions, near-term capacity expansion is limited to two 230 kV lines of 247 km (Map 2). Further information on transmission infrastructure development is provided in section 5.2 and Annex B of this report.
4.4 Distribution and Tariffs
According to EDL, combined transmission and distribution losses have ranged between 10% and 13% in recent years, as referred to in Figure 19. The exact percentage attributable to the distribution grid is not known, although EDL’s Technical Department suggests it to be around 9%. Notwithstanding, and based on general trends in other emerging markets, much of the losses are likely to be in the lower voltage, 22 kV distribution part of the delivery system.
EDL has targets to reduce distribution losses by 0.5% per annum and, to that end, is currently developing a pilot project in collaboration with the World Bank and has ongoing assistance from ADB’s power distribution investment programs.[66] One particular challenge is that network automation is low, and only new substations can be monitored remotely. Bilateral aid agencies are also offering assistance, and EDL has shown interest in this area for potential support from Agence Française de Développement (AFD) (footnote 28). EDL highlighted the needs for improvements of the Vientiane distribution grid and the establishment of a distribution master plan for Vientiane area as possible future areas of partnership.
The World Bank Group Enterprise Survey has revealed in several recent editions that a high percentage of companies identified electricity as a major constraint on their business (over 17% in 2018).[67] The worst of the outages are in central 2 and south regions, and, compared with its peers within the ASEAN bloc, the Lao PDR has bigger system average interruption duration index and system average interruption frequency index, indicating considerable room for improvement (Table 4).
Table 4: System Average Interruption Duration Index and System Average Interruption Frequency Index within Southeast Asia, 2013–2015
Country | CAM | IND | LAO | MAL | PHI | SGP | THA | VIE |
SAIDI | 63 | 3.5 | 49 | 0.5 | 5.4 | 0.01 | 0.7 | 27 |
SAIFI | 48 | 2.4 | 94 | 0.5 | 3.1 | 0.01 | 1.5 | 11 |
CAM = Cambodia, IND = Indonesia, LAO = Lao People’s Democratic Republic, MAL = Malaysia, PHI = Philippines, SAIDI = System Average Interruption Duration Index, SAIFI = System Average Interruption Frequency Index, SGP = Singapore, THA = Thailand, VIE = Viet Nam.
Source: World Bank. 2017. Electricity Tariffs, Power Outages and Firm Performance: A Comparative Analysis. Washington, DC.
4.4.1 End-User Tariffs
With input and support from major development partners, the government has developed a policy to gradually increase electricity tariffs to cover production, transmission, and distribution costs. Based on the government’s decision in March 2012, electricity tariffs were to increase on average by 2% or more annually. From 2009 to 2017, average tariffs grew at a CAGR of 2.9% in $/kWh terms ($0.0805/kWh) and 2.2% in KN/kWh terms (KN649/kWh), having been moderated from their highpoint in 2015 (footnote 58). Yet despite these increases, overall tariff rates in the Lao PDR are low and remain below cost recovery; during 2015, tariffs were approximately $0.0200/kWh below the average cost incurred by EDL, with this gap growing to $0.0441 in 2016 (footnote 15). Moving forward, EDL is focusing on reducing power purchase costs by 2% and distribution losses by 1.5% to maintain a 2% tariff increase (footnote 11).
At present, residential tariffs are considerably lower than for general business or high-voltage customers (large businesses), indicating a degree of cross-subsidization when compared with EDL’s total average cost per MWh (Figure 21). While many residential end-users also benefit from tariff subsidization, these subsidies are both expensive and untargeted, and, together with a lack of cost-reflective tariffs, are important factors impairing EDL’s financial position. Subsidies are discussed further in section 5.1.
Despite the current tariff regime expiring at the end of 2017, the 2017 tariff remains in effect while MEM prepares a new tariff decree through 2022 as part of their financial review of EDL and the Lao PDR power sector.[68]
In designing new tariffs, challenges and delays have resulted from the need to separate EDL’s investment expenditure for domestic and export-related transmission infrastructure to ensure that the domestic market only bears costs for which it is responsible. The aims of the Lao PDR for inclusive economic development serve as a challenge for the government to implement the new tariff regime without adversely affecting the poor; small users will likely continue to pay non-cost reflective tariffs. In
fact, larger residential users (with consumption of greater than 150 kWh per month) already pay twice the rate of residential users in the 25–150 kWh bracket.
4.5 Climate Change and the Environment
The Lao PDR has a long and deep-rooted history of being fundamentally intertwined with its natural environment and resources shaped by the Mekong River along its western frontier; a land area of which 80% is covered by natural forest, forest plantation, and unstocked forest; and an economy founded on agriculture. The country is considered to be particularly vulnerable to the effects of climate change, both at the economic and social levels.[69] Its location within the Mekong River gives rise to the potential for extreme climatic hazards such as flooding and droughts, which may have a material impact on vital areas such as agricultural cycle and food security as well as water supply and hydropower production.
As a consequence, the country has had a long-standing and progressive policy agenda for reducing greenhouse gas emissions and addressing climate change, having first approved the National Strategy on Climate Change in early 2010. The strategy was followed a year later by the Renewable Energy Development Strategy,
2011–2025, which included financial incentives, such as reduced import duties and tax incentives, and a legal framework to support the development of economically viable technologies and promote competition.[70] Ultimately, the aim is to increase renewable energy use—excluding large hydropower—to 30% of total energy consumption by 2025, with biofuel production accounting for 10% of total energy consumption in transport (footnote 74). Despite the incentives and measures provisioned by the strategy, the implementation of new renewable technologies in the country has been limited so far (section 2.1), suggesting that the economics of renewable technologies remains not sufficiently attractive at present, that there are difficulties in implementing these plans, or a combination of both.
In addition, the Renewable Energy Fund is to be introduced as a part of the
Renewable Energy Development strategy and as a sub-account of the Rural Electrification Fund, with the intention of providing financial assistance and removing financial barriers to promote the development of renewable energy (footnote 74). On the issue of energy efficiency, the government is aiming for a reduction of 10% of energy consumption by 2030 compared to the business-as-usual outlook.[71]
Other policies aimed at adapting to and mitigating the effects of climate change have since included the following:
- Climate Change Action Plan of the Lao PDR (2013–2020);
- Investment and Financial Flows to Address Climate Change in Energy, Agriculture, and Water Sector (2015);
- National Adaptation Programmes of Action for Climate Change;
- Intended Nationally Determined Contribution (INDC); and
- Nationally Appropriate Mitigation Actions for the Renewable Energy Sector of the Lao PDR.[72]
Given the Lao PDR’s rich hydro resource potential, the development of hydropower projects has naturally served as one of the central thrusts behind the country’s climate-focused policies. To date, large hydropower development has mostly been a result of FDI under build–operate–transfer (BOT) and build–own–operate–transfer schemes. FDI seems poised to remain the main source of such new development, with financial strains of local developers such as EDL and its subsidiaries limiting their ability to develop capital-intensive hydro projects. There are also explicit policies to promote large hydro, such as those stated under the INDC, as outlined in Table 5.
More recently, the Lao PDR signed the climate treaty known as the Paris Agreement, with its ratification taking effect on 4 November 2016.[73] Through the country’s INDC, several programs and measures were identified to improve resilience to climate change and reduce future greenhouse gas emissions. The activities to be implemented under the INDC are summarized in Table 5, including the corresponding objectives and estimated resulting carbon dioxide equivalent reductions in emissions.
The INDC sets out adaptation projects for some of its key sectors in addition to the mitigation-related activities in Table 5. These include promoting resiliency and adaptability to climate change in sectors such as agriculture, forestry and land use change, water resources, transport and urban development, and public health. Implementation of the INDC will be facilitated by the Ministry of Natural Resources
Table 5: Intended Mitigation Activities to be Implemented by the Lao People’s Democratic Republic in 2015–2020
Name of Activity | Objectives of Activity | Estimated CO2e Reduction |
Implementation of Forestry Strategy to the Year 2020 | To increase forests to cover 70% of land area by 2020 | 60,000–69,000 ktCO2e (once the forestation target is met by 2020 onward) |
Implementation of Renewable Energy Development Strategy | (i) To increase the share of renewable energy to 30% of energy consumption by 2025 (ii) To increase the share of biofuels to meet 10% of the demand for transport fuels by 2025 | 1,468,000 ktCO2e (by 2025) |
Implementation of Rural Electrification Programme | To make electricity available to 90% of households in rural area by 2020 Note: this target has already been surpassed and subsequently adjusted upward to 95% in 2020. | 63 ktCO2e per annum (once the target is met in 2020) |
Implementation of transportfocused NAMAs | To further develop the road networks and increase the use of public transportation | 33 ktCO2e per annum for road network development and 158 ktCO2e per annum for public transport development |
Expansion of the use of largescale hydroelectricity | To build largescale (>15 MW) hydropower plants to provide clean electricity to neighboring countries Approximately 5,500 MW of total installed capacity by 2020 and 20,000 MW of additional hydroelectric capacity are planned for construction after 2020. | 16,284 ktCO2e per annum (2020-30). |
Implementation of climate change action plans | To build capacity to monitor and evaluate policy implementation success, with a view to producing new policy, guidance, and data | To be estimated as part of the implementation plan |
ktCO2e = kiloton carbon dioxide equivalent, Lao PDR = Lao People’s Democratic Republic, MW = megawatt, NAMA = Nationally Appropriate Mitigation Action.
Source: Government of the Lao PDR. 2015. Intended Nationally Determined Contribution. Vientiane.
and Environment, whose approach will focus on four elements: (i) overall strategy, coordination of INDC implementation, and regulatory framework; (ii) capacity building; (iii) finance; and (iv) monitoring, reporting, and verification. In total, the mitigation and adaptation projects would cost approximately $2.37 billion, with significant capacity building required. The financial situation of the Lao PDR is similar to other developing nations, insofar as its commitments to tackling climate change are contingent upon international support (footnote 76).
4.5.1 Linkages between the Power Sector and the Environment
While the continued development of hydropower capacity in the Lao PDR appears compatible with the country’s commitment to tackling climate change, it is premature to view it as a panacea. The propensity for climate change to potentially alter or diminish the hydrological resources upon which such infrastructure relies presents risks to the operations and viability of hydropower generation over their lifetime (50–60 years is typical). In its climate change impact assessment of the Nam Ngiep 1 Hydropower Project, the International Centre for Environmental Management identified the following distinct risks posed by climate change:
(i) performance risks: sensitivity of generation to reservoir inflows due to daily, weekly, and seasonal changes in rainfall and evaporation rates;
(ii) reservoir life risks: the useful operating life of a hydropower plant can be impinged by increased sediment loads, which reduce the amount of reservoir storage;
(iii) safety risks: increasing risk and intensity of extreme flooding events that can potentially threaten the structural integrity of a dam;
(iv) secondary risks: land subsidence or slippage that can threaten dam integrity or block upstream water flows, with a resultant impact on generation;
(v) environmental risks: increasing water temperatures that can endanger the aquatic environment and biodiversity, thereby compromising the environmental compliance of hydropower projects; and
(vi) risks due to changing patterns of water demand: potential for warmer climatic conditions to increase evapotranspiration and reduce water quantities, which may increase competition for water in instances where it is also used for irrigation purposes and not solely electricity generation.[74]
Both small and large hydropower projects pose an array of local environmental risks that can raise concerns about social equity despite being generally considered “carbon neutral” and nonpolluting. In particular, they can often have substantial impacts on local ecosystems, including land, forests, and hydrology, and can lead to the displacement of populations. As these projects tend to be developed in more rural areas, associated economic repercussions on less affluent local populations and local ecological assets can sometimes be perceived as regressive. The impact on local populations and assets creates the impetus to better understand the implications of new project development so that the consequences can be dealt with accordingly.
Building on its long history of recognizing the importance of managing its environment and natural resources sustainably, the Lao PDR has sought to better understand and assess the potential environmental impact of power generation projects through the National Policy on Sustainable Hydropower Development, enacted in 2015.[75] One of the tenets of this policy has been the mandating of strategic environmental assessments (SEAs) to be undertaken when developing policies, strategic plans, and programs within the power sector.[76] Rather than assessing the impact of an individual project, SEAs aid the overall planning process by providing an integrated evaluation of different generation mix pathways that considers social and environmental impacts, risks, and mitigation actions, as well as alternative development options (footnote 80). SEAs mark a step change away from conventional project-specific planning approaches by providing a holistic approach that seeks to evaluate the full economic cost and implications associated with different power sector development pathways. In turn, this should allow development within the sector to be sustainable from an economic, environmental, and social perspective.
In the Lao PDR, where hydropower generation has been and is likely to continue to be the predominant form of power project development, some of the foremost issues that should be considered by an SEA are the
- impact on hydrology, such as changes in seasonal water flows, flooding, and drought risks;
- resettlement of people displaced by the construction of dams;
- impact on agriculture and livelihoods in local communities, and social cost; and
- impact on forest cover, biodiversity, and natural habitats (footnote 80).
Such holistic project evaluation is not only important from the perspective of evaluating the interplay of negative project externalities with general concerns for social equity and environmental sustainability. Additionally, understanding these environmental issues, along with the local environmental impacts associated with large hydro project development, has wider benefits for these projects. For instance, rampant illegal deforestation has blighted the country for some time, contributing to approximately 140,000 hectares per year (1.25% per annum) of forests being lost between 1992 and 2002 (footnote 30). The resulting feedback effects—changing the nature of local hydrology and increasing the incidence of landslides— can have substantial repercussions for hydropower projects. To the degree that such a changing environmental situation impacts hydropower projects, it could have negative economic consequences, and to the degree that these impacts are not understood and remain unquantified, they are likely to increase the perceived risk profile of hydropower development in the Lao PDR, and in turn lead to an increase in the cost of capital for such projects.
The Lao PDR has yet to realize the full benefit of adopting the SEA framework, as the inclusion of SEA principles in power development planning only extends as far as screening hydropower projects in terms of their proximity to designated protected areas (footnote 55). Further, the absence of non-hydropower forms of renewable energy from the Lao PDR’s long-term power development plan (PDP) means that the application of SEA principles cannot be consistently applied (footnote 55). Given that large-scale hydropower is likely to continue to be a mainstay of Lao PDR's electricity sector, it is imperative that the full economic, social, and environmental costs of these projects are studied much more systematically, and that a robust framework for environmental and technical compliance is put in place. A compliance framework will undoubtedly help to alleviate concerns and address consequences associated with these projects regarding social equity, environmental sustainability, and project finance, among other things.
4.6 Electrification and Access to Electricity
The Lao PDR is widely recognized as having made significant progress in providing electricity to its citizens, having very successfully implemented its National Electrification Program since the turn of the century. Between 2000 and October
2017, the rate of electrification increased from 36% (footnote 59) to 94% (footnote 24), and in turn led the country to surpass its previous target of 90% electrification by 2020 ahead of schedule.[77] The Lao PDR’s progress in electrification can be considered all the more impressive given the inherent challenges associated around 60.35% of the country’s population living rurally (2016).[78]
While revenues from hydropower exports were critical in funding the first years of the national electrification program, the rapid expansion of access to electricity was a result of several other factors including
- proactive government policies and financial assistance;
- high performance of EDL with regards to leading, planning, and implementing the program in a cost-efficient manner;
- state subsidies and below-cost retail rates for poorer segments of the population;
- implementation of a financing mechanism— Power to the Poor Program—to assist the poorest rural households;[79] and
- utilization of off-grid solutions for households in remote areas when costeffective.[80]
The success of the Lao PDR’s electrification program can be seen in Figure 22 (footnote 46).
Despite the impressive headline statistics for electrification, access to electricity still varies substantially by region; around 67,000 households remain without electricity and instead rely on traditional biomass for lighting and cooking (footnote 58). The more densely populated and less mountainous central regions generally have higher rates than the northern and southern regions. The electrification rates by province are shown in Map 3.
The Lao PDR government aims to continue expanding access to electricity under its National Electrification Program and has stated a goal of 95% electrification by 2020 and 98% by 2025.[81] Specifically, in northern provinces where electrification rates are significantly below the national average, such as Phongsaly (58.4% in 2017) and Houaphan (73.2% in 2017), the government has made the development of basic infrastructure, including the extension of power distribution lines, a priority (footnote 55).
Map 3: Electrification Rate in the Lao People’s Democratic Republic, by Province, as of 2017
Source: Government of the Lao PDR, Ministry of Energy and Mines. 2018. Electricity Statistics 2017. Vientiane.
The government’s plan to electrify the remaining unconnected households is generally via an extension of the power grid. Inherently, many of the households that remain without electricity live in more inaccessible “last mile” areas and have limited disposable cash income. In such locations, electrification via grid extension proves to be very expensive and does not offer the most cost-effective option. ADB estimates that the marginal cost of electrifying the remaining unelectrified households is more than double the costs of electrifying the previous 15%–20% of households. The relatively unamenable conditions of the remaining unconnected households to traditional grid extension may mean that alternative solutions are more cost-effective in many cases.
In particular, off-grid alternatives such as solar home systems (SHS) or micro-grids are often lower cost solutions to “last mile” electrification issues. Such alternatives have been utilized at times in the Lao PDR. In 2006, 25,000 SHSs introduced via the World Bank-financed Village Off-Grid Promotion and Support program, with 15,775 systems (totaling 590 kWp) still in operation across.[82]Though solar power has likely played the most significant role in off-grid electrification initiatives to date, other technologies also play a role in off-grid electrification in the Lao PDR. In 2011, a 3 MW sugarcane bioenergy plant commenced operations in Savannakhet Province, subsequently increasing capacity to 8 MW, while a 30 MW bioenergy and ethanol plant in Attapeu Province entered service in 2013.[83] Several other projects including waste-to-energy technologies are also actively being developed.
As the Lao PDR’s remaining population without electricity becomes more difficult and expensive to reach via conventional grid expansion, renewable technologies in off-grid distributed applications are becoming more cost-effective and technically feasible alternatives and should be considered as a means of expanding access to electricity.
4.7 Energy Efficiency
The Lao PDR government has not established a framework through which energy efficiency would be implemented. There is no agency tasked with pushing the energy efficiency agenda in the country, nor is there a policy that broadly deals with this issue. Despite lacking an overarching framework, the Lao PDR does have a general energy savings target of 10% for the period through 2025.[84]
The absence of a formal institutional framework through which to promote energy efficiency and conservation (EEC) programs has seen some programs carried out by various agencies. For instance, the ASEAN–Japan: Promotion of Energy Efficiency
and Conservation and the Ayeyawady–Chao Phraya–Mekong Economic Cooperation Strategy programs were implemented, with the aim of promoting awareness and knowledge of the issues through a series of workshops, seminars, trainings, and energy audits (footnote 88).
Furthermore, the World Bank and Global Environment Facility have funded the twophase Demand Side Management and Energy Efficiency project. Phase 1 activities included energy audits and energy efficiency improvement recommendations, pilot energy efficiency measures, expansion of the public sector energy database, cleaning of air conditioners and installation of various technologies, and awareness building (footnote 88). Phase 2 involved the (i) replacement of 400,000 light bulbs in the residential sector with compact fluorescent light lamps, and lighting and air conditioner units in government buildings; and (ii) continued dissemination of information to promote awareness building regarding energy savings opportunities.
The 2018 amendment to the Lao PDR’s Electricity Law mandates MEM to develop policies to implement energy efficiency and conservation measures (and similarly, for the use of alternative forms of energy). A new EEC policy was established in 2017 and an EEC decision is currently under preparation. Additional implementing regulations will need to be promulgated to develop a complete EEC framework.
The power sector in the Lao PDR faces challenges on many fronts, with the following four key areas:
- EDL’s financial sustainability and substantial debt burden, as well as the lack of cost-reflective tariffs and high take-or-pay clauses associated with the forthcoming domestic supply surplus;
- meeting the required capital expenditure for transmission infrastructure, both to serve domestic demand and to evacuate excess power to export markets; • lack of regulation and the need for capacity building within MEM and EDL; and
- realizing hydropower build-out potential.
5.1 Financial Sustainability of Électricité du Laos
The build-out of power plant capacity and transmission and distribution in a lower middleincome country such as the Lao PDR has been achieved by balancing low tariff levels that reflect the low ability of the residential sector to pay with subsidy support from the government and concessional financing from the international development agencies.
5.1.1 Financial Position of Électricité du Laos
As the single buyer for the domestic market, EDL is responsible for domestic retailing, domestic transmission and distribution, and some generation and wholesale exports. EDL earns revenues from the sale of electricity to domestic and foreign consumers and dividends from some independent power producers (IPPs). However, these combined revenue streams have produced growing losses (Figure 23).
As further illustrated in Table 6, EDL’s financial situation is quite precarious and thus relies on implicit or explicit government support. EDL has been financed in large part through government-to-government lending, such as with the PRC. While this has been at attractive interest rates of around 2%, EDL has paid a “marked up” rate closer to 5% along with the repayment of the underlying capital. Since 2014, EDL’s long-term debt to equity ratio has risen rapidly and is now probably unsustainable. In 2016, EDL Group could not fully service its debt and breached its financial covenants (Table 6). With EDL’s liabilities increasing, obtaining further financing becomes even more difficult.
By contrast, EDL’s 75%-owned subsidiary, EDL-Gen, has stakes in many domestic small power producers, IPPs, and some export-oriented IPPs and makes a profit (gross profit in 2016 was around $157 million, which largely came from the sales to
EDL). Yet, even EDL-Gen’s financial ratios are showing some signs of deterioration. Profits are on a downtrend, and debt-to-equity and net debt-to-earnings before interest, taxes, depreciation, and amortization rose sharply in 2016. EDL-Gen’s liabilities as of June 2017 amounted to around $1.1 billion, while a rising accounts receivable figure alludes to the liquidity issues being seen downstream at EDL, the single buyer (footnote 35).
Table 6: Électricité du Laos Key Financial Ratios
Year | Long-Term Debt to Equity (Nonconsolidated) | Long-Term Debt to Equity (Consolidated) | Current Assets / Current Liabilities (Consolidated) |
2011 | 1.2x | 1.2x | 0.5x |
2012 | 1.3x | 1.3x | 0.6x |
2013 | 1.6x | 1.8x | 0.3x |
2014 | 2.3x | 2.5x | 0.5x |
2015 | 2.8x | 3.3x | 0.3x |
2016 | 4.4x | 5.4x | 0.5x |
Financial covenant/ target | <= 1.5–2.0x | <= 1.5–2.0x | >= 1.0x |
Source: ADB estimates.
Table 7: EDL-Generation Public Company Key Financial Ratios
` | EBITDA | Net Debt | Equity | Net Debt / Equity | EBITDA / Interest | Net Debt / EBITDA |
2011 | 99 | 165 | 490 | 0.34x | 19.2x | 1.7x |
2012 | 100 | 135 | 699 | 0.19x | 22.4x | 1.4x |
2013 | 147 | 133 | 751 | 0.18x | 38.0x | 0.9x |
2014 | 145 | 312 | 790 | 0.40x | 36.6x | 2.2x |
2015 | 122 | 358 | 1,138 | 0.31x | 15.8x | 2.9x |
2016 | 157 | 1,193 | 1,149 | 1.04x | 8.1x | 7.6x |
EBITDA = earnings before interest, taxes, depreciation, and amortization. Note: Units are in $ million, unless it’s a ratio.
Source: EDL-Generation Public Company. 2017. Presentation Thailand Focus 2017. Investor Relations presentation. Vientiane. http://www.edlgen.com.la/presentations/?lang=en.
Some of EDL’s financial issues include the following:
(i) Both domestic sales and exports are not profitable for EDL.
(ii) Power purchase costs per unit have significantly increased after the segregation of EDL-Gen.
(iii) Gross imports were around 28% of supply over the past 7 years (until 2015), although EDL is now a net exporter and will continue to remain so.
(iv) EDL does not receive the benefit of low-cost financing from international financial institutions and governments, as the Government of the Lao PDR adds an interest charge to EDL lending.
(v) EDL is making heavy loan-funded investments, and debt covenants are severely stretched with EDL facing difficulties to meet debt obligations.
(vi) There has been no equity injection into EDL in the last 7 years.
(vii) EDL has limited financial liquidity and is using short-term liabilities (by retaining trade payables) to invest in capital assets.
(viii) EDL’s asset transfers to EDL-Gen do not seem to have positively impacted EDL.
A continuation of a tariff regime that does not reflect underlying costs, combined with the capital-intensive nature of planned generation and transmission infrastructure, indicates that EDL’s cumulative losses will invariably grow in the coming years. At a structural level, two options would help alleviate EDL’s financial position:
- Balance sheet. As mentioned, there has been no equity injection into EDL since 2011, and a major equity injection would help EDL with its heavy capital expenditure burden although it is only a stop-gap rather than a long-term solution. A debt-to-equity conversion would be an alternative.
- Rationalization of asset transfers. Preliminary information indicates that EDL-Gen received a better deal than EDL on asset transfers for some power plants or shares in IPPs. An independent regulator could assist with ensuring alignment in the prices of future transfers of hydro plants or shares in IPPs from EDL to EDL-Gen.
5.1.2 Key Financial Challenges Facing Électricité du Laos
Lack of Cost-Reflective Tariffs
The strain on EDL’s finances has been the result of many factors, one of which is the low level of electricity tariffs, which have not reflected the cost of procured generation and transmission and distribution investment, for many years. EDL’s tariff card subsidizes small residential users (26–150 kWh per month) and the agriculture and irrigation sectors. While this policy subsidizes lower-income households and farmers, this is causing severe pressure on EDL’s profits and balance sheet as shown in Table 6 and Table 7.
There is a natural conflict between the need to allow tariffs to rise and the need to attract economic growth into the country, particularly given the looming overcapacity. However, there may be a greater weight being placed on electricity prices in attracting industry than is the case.
In 2015, about 82% of domestic consumers paid tariff rates below the cost of electricity (in part due to expensive untargeted subsidies), and revenue collected per kWh supplied to this sector was 17% lower than the average unit cost of supply (Figure 24) (footnote 11). EDL realized considerable losses from its sales to the agriculture and residential sectors, which represented 39% of total electricity consumption in 2015.
Based on the data gathered from power tariffs in 32 cities globally, cost-reflective tariffs tend to result in a higher charge to small residential users and a lower charge to large consumers as illustrated in Figure 25, which is the opposite of the situation in the Lao PDR.
In seeking to raise and/or rationalize tariffs, a change away from a simple system all day flat rate KN per kWh tariff (by customer group, consumption, and/or voltage) would be a useful part of restructuring the EDL tariff schedule. There are several options for rationalization of tariffs:
(i) two-part tariffs, with a standing charge to cover fixed costs and an energy charge to cover variable items;
(ii) time-of-day tariffs, with consumers being charged higher amounts for peak power and lower amounts for off-peak power;
(iii) slab size, which could recalibrate the number and size of bands into which customers would fall depending on their consumption; and
(iv) kilovolt-ampere-hour tariffs, which would use the power factors of larger customers and charge a premium for customers with low power factors.
A government policy that subsidizes smaller users with low household incomes is reasonable for a developing nation in some cases. For example, it has been a formal policy in Indonesia since the passing of the Law on State-Owned Enterprises in 2003 for the initial law to be subsequently followed up by various decrees and regulations that refine the method in calculating the amount the government transfers to the state power company each year. In essence, the government covers the difference between the company’s revenues and costs and adds on a 7% markup on costs to provide a positive net margin. The calculation of the public service obligation is subject to strict audits and close checks by various government agencies.
A subsidy policy could be explored in the Lao PDR. The first step would require the government to recognize its policy directive that causes losses for EDL. Second,
the government should make tariffs cost reflective to the extent possible and, if not, provide financial support to EDL in the form of a public service obligation to keep it solvent. Efforts should also be made to improve low tariff collection rates—particularly to recoup the debts accumulated by agricultural consumers and government agencies—that have exacerbated EDL’s weak financial situation.
Financial Liabilities of Électricité du Laos from the Impending Domestic Power Surplus
Another serious issue relates to the build-out of domestic capacity and generation surplus that is expected in the coming years and that on its present course will see the adjusted reserve margin reach 52.6% by 2023. This is a particular concern because, for most of the new IPP- and small power producer-owned plants, EDL entered into PPAs with take-or-pay clauses (without any seasonal or peak/off-peak distinction) whereby failure to purchase the agreed off-take will result in financial penalties (footnote 35). One option would be for EDL to try renegotiating the terms of these contracts with investors, such as by extending the concession period in exchange for a lower levelized tariff. This option could potentially save 2.5%–4.0% of power costs over 5 years, or KN1.4 trillion–KN2.5 trillion, while renegotiating the dividends and/or royalties that EDL earns from investors is another possibility.
A second potential option would be for EDL to find a market for this power in Thailand or Viet Nam with firm off-take, though this would be contingent on their willingness and ability to buy, as well as to secure an export tariff that recovers the cost of generation from EDL-Gen and the domestic IPPs. It is understood that while Thailand remains the Lao PDR’s largest export market, incremental growth in cross-border power trade is likely to be driven by demand from Viet Nam, along with frontier markets such as Malaysia and Singapore, over the longer term. Notwithstanding, any reassignment of domestic generation projects to export markets would invariably require further investment in new transmission infrastructure to make this possible, and the means for EDL to take on more debt to finance such commitments is unclear.
5.2 Transmission Infrastructure Requirements
Against the backdrop of EDL’s weak financial position, substantial capital expenditure in transmission and distribution infrastructure is needed. Investments in generation by EDL, EDL-Gen, and the private sector have not been matched with a proportionate investment in transmission and distribution infrastructure, and there is a heightened need for the requisite infrastructure to allow excess power to be evacuated. Such a build-out of transmission infrastructure could place further pressure on EDL’s finances because the cost of developing transmission infrastructure in the Lao PDR is particularly high. The high cost is due to several factors including (i) low asset utilization rates due to a lack of holistic system planning; (ii) singlesource procurement from engineering, procurement, and construction contractors without any design input from EDL; and (iii) contractors arranging financing that may not be the least-cost option. To that end, development partners are in discussions with the government to explore alternative approaches such as a transmission BOT auction, with a view to reducing costs and the debt burden on EDL.
Currently, the capacity of the national transmission grid is insufficient to meet peak demand and match growing domestic generation and demand. When viewed alongside this study’s analysis that domestic generation capacity will rise by 3,000 MW from 2,900 MW to 5,900 MW during 2017–2022, it means that significant transmission and distribution investment is required over the next 5 years. All else equal, this would substantially increase EDL’s outstanding net debt, but it represents a level of capital expenditure that is far beyond EDL’s financial capabilities. Embarking, therefore, on a more reasonable investment program would appear paramount, as would exploring the opportunity for public–private investment partnerships.
From the discussions with the government, it is clear that the looming overcapacity is seen more as an opportunity to export more electricity than as a problem. Further, raising electricity tariffs is seen as a drawback if it deters investment in new industries in the Lao PDR. There may be a greater aspiration to sell exports (and increase domestic demand) than there is demand for exports. Little analysis on the actual export demand (and on the impact of electricity tariff on domestic FDI) seems to have been undertaken, nor is there a cost–benefit analysis of exports given the small tax and royalty gains and the high cost of investment in both power and transmission infrastructure. It is essential that the Lao PDR ensures export-oriented IPPs have firm off-take arrangements and that EDL does not take this risk.
Long-Term Plan for National 500 kV Backbone Transmission
EDL also has long-term plans to add a 500 kV backbone transmission system to properly connect all regions, especially to connect the north with the other regions (Map 4). The northern region is expected to continue to have substantial net surplus capacity. In addition, the emerging expected surplus capacity in the south will need transmission to allow power to be evacuated to central 2 region particularly.
Investment in transmission infrastructure, such as the 500 kV backbone, is crucial if EDL is to look to export the forthcoming domestic generation surplus. While it is understood that some parts of the 500 kV backbone will be committed to as part of the upcoming PDP, in May 2018 the Lao PDR’s National Assembly approved a $1.66 billion in loans from the PRC to finance five new transmission lines, of which four are sections of the 500 kV backbone.[85] The slower pace of transmission buildout is evidently a symptom of the financial constraints that EDL faces, as well as the limitations that below-cost tariff rates have on EDL’s investment capabilities for system expansion and integration. Issues such as securing right-of-way access could complicate the build-out of transmission infrastructure and increase cost as a result.
Map 4: Électricité du Laos Long-Term 500-Kilovolt Transmission Plan
Source: Électricité du Laos. 2016. Country Presentation. Presentation prepared for the 21st Meeting of the Regional Power Trade Coordination Committee. Siem Reap. 8–9 December.
Analysis of Regional Peak and Capacity Imbalances
Based on the capacity and demand model used in section 4, the regional imbalances between peak and installed capacity will show some improvement by 2030 (Table 8). A key feature is that the south, which has long been short of power capacity, should have much more capacity available by 2030. The north remains a major source of surplus power capacity, and this again highlights the need for transmission build-out to transfer power to other regions.
Table 8: Regional Domestic Peak and Domestic Installed Capacity for the Lao People’s Democratic Republic, 2017 and 2030
MW = megawatt.
Sources: Tokyo Electric Power Company Holdings, Inc. and Hokuriku Electric Power Company, Inc. 2017. Study on Independent Power Producers (IPPs) in the Lao PDR; Government of the Lao PDR, Ministry of Energy and Mines. 2018. Electricity Statistics 2017. Vientiane; Électricité du Laos. 2016. Country Presentation. Presentation prepared for the 21st Meeting of the Regional Power Trade Coordination Committee. Siem Reap. 8–9 December; and Government of the Lao PDR, Ministry of Energy and Mines. 2016. Power Development Plan 2016–2030. Vientiane.
Foreign Agency Assistance in Power System Planning
The Japan International Cooperation Agency (JICA) is leading a 25-month study to assist with the development and expansion of the Lao PDR’s transmission network.[86] The expansion of the transmission network is needed to (i) supply high-quality electric power to satisfy domestic power demand and (ii) expand power trade with neighboring countries utilizing abundant hydropower resources. Some constraints that the preliminary JICA study has identified are
- insufficient power network infrastructure to accept huge and growing power supply sources,
- funding required for the power grid extension being several times larger than the current EDL operations, and
- lack of suitable power system operation rules.
The aims of the power network system master plan include
- formulating realistic power trade expansion scenario and road map to fulfill the needs of neighboring countries and domestic power demand;
- establishing a new power network system development plan with high reliability and high efficiency, taking into account social and environmental considerations and the desire for greater power exports;
- proposing ways to establish system operation rules that are harmonized with those of neighboring countries; and
- analyzing the financial impact on EDL resulting from the implementation of a power network system development plan and proposing impact mitigation measures.
5.3 Regulation and the Need for Institutional Capacity Building
At an institutional level, a key area of concern relates to the lack of capacity and capability of both MEM and EDL to perform their duties effectively, and particularly the bearing this has on their ability to undertake a rigorous and integrated approach to generation and system planning. The effects of this lack of capacity and capability are evident on several fronts:
- The first tranche of the Lao PDR’s export-oriented IPPs was successful. IPPs such as Nam Theun 2 and Theun Hinboun 1, in which EDL holds a stake, were contracted at commercially viable tariffs and had dedicated off-take arrangements. While this success was arguably a catalyst for subsequent export-oriented IPP projects, revenues from several of these plants have underperformed because no firm export off-take arrangements are in place. This underperformance has exacerbated EDL’s financial predicament given the large loans used to help finance their stakes.
- Another symptom that underscores the need for more robust planning and analysis is tied to the approval of new domestic generation projects and the impending substantial domestic generation surplus, which are set to severely impair EDL’s finances given the take-or-pay clauses within many of the associated contracts. Furthermore, there is a lack of contingency regarding the potential to reassign this capacity to export markets, both contractually and insofar as it will require significant build-out of transmission infrastructure to make this possible.
- There are also delays to the PDP, which was expected to be released in early
2018; it remains stalled as of May 2019. The PDP made by EDL’s Technical Department must first be financially analyzed and approved, for example, in terms of the ability for EDL to undertake the required investment for any proposed transmission infrastructure. While such an approach is sensible, there is no clarity provided to EDL’s Technical Department about the upcoming domestic generation surplus and whether these projects will ultimately serve the domestic or export markets. MOUs for cross-border exports, for example, do not provide sufficient certainty and cannot be used as a basis for PDP development and the investment in capital intensive infrastructure—such as the proposed 500 kV backbone— which follows.
- Recognizing these issues, in March 2019, the government announced a moratorium on new power sector investments until 31 December 2020 to allow the government to inspect, assess, and seek markets for projects that have been previously approved and to reformulate the power sector strategy.[87] Depending on their progress and market potential, projects may be subject to postponement or cancellation. Small and medium-sized renewable energy projects for self-consumption or that already have a market for power supply are exempted. MEM will carry out a study of domestic electricity demand in the Lao PDR and import demand from neighboring countries.
These issues underscore the need to provide support to MEM and EDL, such that the necessary analysis, due process, and capacity building can take place within these institutions and improve their overall financial management. With technical assistance from the World Bank, MEM and EDL developed the Financial Action Plan (footnote 72) that lays out actions for cost optimization, revenue enhancement, and other strategic actions. For example, MEM and EDL have agreed to renegotiate the power purchase price, take-or-pay clause, and payment currency on PPAs with over 30 power generators. The parties have also agreed on a plan to sell or transfer to EDL-Gen some hydropower projects and other generation investments by the end of 2019.
A key piece of the energy landscape that is missing in the Lao PDR is an independent regulator (footnote 11). The paramount mission for a regulator is fairness, i.e., to balance the potentially conflicting interest of all stakeholders. EDL and EDL-Gen are undertaking the following activities that should probably be subject to checks or approval by an independent party such as a regulator:
- approving tariffs including any restructuring of the rate card;
- overseeing any public service obligation payments to EDL;
- subjecting PDPs to independent oversight;[88]
- reviewing the fairness of asset sales from EDL to EDL-Gen;
- protecting consumers from exploitation by firms with extensive market power;
- safeguarding foreign investors from arbitrary decisions by the single buyer; and
- promoting energy efficiency.
5.4 Realizing Hydropower Potential
General market intelligence indicates investor willingness to accept EDL risk as it is considered a creditworthy off-taker due to implicit or explicit government guarantees on domestic IPPs. EGAT is similarly well regarded.
Contracted power exports could increase from 16 TWh in 2016 to 50 TWh by 2030. PPA sales prices vary by IPP and will likely rise in the future, but, assuming sales price rises from $35/MWh in 2016 to $40/MWh in 2030, revenues from exports could rise from $555 million in 2016 to $2 billion by 2030, which in turn will help narrow the country’s trade deficit.[89] While power exports are an important source of revenue for the government’s poverty reduction initiatives, an export-oriented policy for the development of hydropower generation projects will face the following challenges:
(i) ensuring that negative social and environmental impacts are properly assessed and minimized;
(ii) balancing domestic consumption needs and export opportunities;
(iii) optimizing trade-offs between short-term benefits (e.g., dividends from equity participation in IPPs) and longer-term benefits (e.g., unified transmission network with interconnection to GMS countries);
(iv) mobilizing and managing financial resources to avoid adverse impact on the economy (e.g., exchange rate effects on agriculture and other exports);
(v) ensuring that development of hydropower projects is consistent with the least-cost expansion planning and done not in an ad hoc basis;
(vi) improving capacity for managing the concession awarding process to ensure that terms and conditions for investors are consistent;
(vii) building capacity for enforcing inspection procedures and monitoring environmental and social safeguards compliance, particularly at the local level; and
(viii) ensuring proper management and tracking of export revenues.[90]
6.1 Government Sector Strategy
The government’s 8th National Socio-Economic Development Plan (NSEDP), covering 2016–2020, targets the Lao PDR’s eligibility for graduation from least-developed country status by 2020, as well as sustainable economic, social, and environmental development.
[91] Recognizing that expanded access to modern and affordable forms of energy and better utilization of current energy resources is essential for the Lao PDR’s continued social and economic advancement, the 8th NSEDP prioritizes the need to develop the energy sector in an affordable, inclusive, and sustainable manner. In the Energy Policy 2015, the government laid out the following targets for the power sector: (i) provide affordable, reliable, and sustainable electricity supply to the population; (ii) achieve an electrification rate of more than 90% by 2020; (iii) improve and expand transmission networks to facilitate power exchange with ASEAN countries; (iv) develop the country’s hydropower potential with private investor participation; and (v) expand renewable energy to account for 30% of the power mix under a reasonable feed-in tariff scheme. EDL’s Power Development Plan (PDP) 2010–2020 lays out investment requirements for generation, transmission, and distribution to meet national objectives.
[92]
Having achieved 92% electrification of households in 2016, the government is now targeting 95% electrification by 2020 and has made the development of basic infrastructure, including the extension of power distribution lines, in the northern provinces a priority. The government is also refocusing its attention on exporting a greater amount of electricity to its neighboring countries, particularly under its long-standing export agreements with Thailand and Viet Nam.[93] The government has recently initiated a study in collaboration with the Japan International Cooperation Agency (JICA) to prepare a power network system master plan that would help it realize its plans to increase export of electricity. A near-term export market is Shan State in Myanmar, which is well-placed to receive surplus generation from the north of the Lao PDR.
6.2 ADB Sector Support Program and Experience
ADB has played a long-standing role in providing financial support and technical assistance to the Lao PDR energy sector, as early as May 1971 with the development of the Vientiane power distribution network. Assistance in the sector has primarily focused on increasing generation capacity, particularly hydropower, in an environmentally and socially sustainable manner; expanding transmission and distribution networks into poor rural areas; and enhancing the capacity of EDL’s staff in technical and procurement matters. Since 1971, ADB has awarded 25 loans and
29 technical assistance programs to the Lao PDR energy sector, totaling $840 million. Projects approved since 2005 are highlighted in Table 9.
As part of its ongoing sector support, ADB, with cofinancing from the Export-Import
Bank of Korea, is currently implementing the Greater Mekong Subregion (GMS)
Northern Power Transmission Project.[94] The project supports the government to
Table 9: ADB Loan and Technical Assistance Support to the Power Sector in the Lao People’s Democratic Republic, since 2005
Project | Date Approved | Committed (in $) |
Technical Assistance | | |
GMS Northern Power Transmission Project | July 2006 | 800,000 |
Cumulative Impact Assessment for the Nam Ngum 3 Hydropower Project | February 2007 | 983,000 |
Na Bong–Udon Thani Power Transmission Project | December 2007 | 760,000 |
GMS Nam Theun 2 Hydroelectric Project - Social Safeguards Monitoring | July 2008 | 400,000 |
Small and Mini Hydroelectric Development Project | January 2009 | 1,000,000 |
Renewable Energy Development in Remote Communities Project | September 2011 | 1,000,000 |
Loan | | |
Nam Ngiep 1 Hydropower Project (PSOD) | July 2014 | ADB loan: 50,000,000 ADB loan: 71,700,000 |
ADB = Asian Development Bank, GMS = Greater Mekong Subregion, Lao PDR = Lao People’s Democratic Republic, PSOD = Private Sector Operations Department.
Source: ADB. List of ADB Loans and Technical Assistance Programs since 1970.
construct transmission lines and associated substations to (i) expand access to grid electricity to consumers in Xayabuli, Phongsaly, and Vientiane provinces; and (ii) increase power trade with Thailand. The project is currently on track for the commissioning of the transmission and distribution systems by June 2019 and provides significant lessons for the management of future projects. With regional sector support, ADB has helped promote the development of a GMS power market through the Regional Power Trade Coordination Committee (RPTCC).[95]6.3 ADB Self-Evaluation
The country partnership strategy (CSP) final review undertaken in 2016 reflects the most recent independent evaluation of ADB’s performance in the Lao PDR’s energy sector, as well as its role in supporting the country more broadly. The review concluded that ADB’s performance was satisfactory because of an effective local mission by taking “a leading role in policy dialogue within the government’s aid management framework” and by satisfactorily supervising project implementation.[96] The report rated ADB’s overall performance in the Lao PDR successful, while noting that ADB’s performance in the project completion reports ranged from highly satisfactory to satisfactory. 6.4 ADB Lessons Learned
ADB’s CPS 2017–2020, which sets out the principles for ADB’s assistance and support to the Lao PDR, makes several high-level recommendations based on lessons from its 2012–2016 strategy. These recommendations include (i) enhancing work with the private sector to promote inclusive growth; (ii) continuing to support the development of human capital; and (ii) boosting the growth of micro, small, and medium-sized enterprises and their integration across the ASEAN Economic Community (footnote 100). At a more operational level, the need for improved coordination between ADB divisions and other development partners is highlighted as an area where improvements could be made by improving synergies among operations, and adopting more systematic approaches in areas such as knowledge management.
While the review rated ADB’s overall performance in the Lao PDR successful, not every project it has undertaken in the country has had the intended outcomes; differing project outcomes invariably mean that lessons can be learned. One notable example is the Renewable Energy Development in Remote Communities Project, which sought to provide technical assistance that would see 5.5 MW of renewable energy resources improving electrification in remote areas of Oudomxay, Luang Namtha, and Phongsaly. The project, approved in 2011, ultimately failed as a result of an overly rigid financing framework that offered only loan—and not grant—funding to the Ministry of Energy and Mines (MEM) due to the country’s debt distress rating at the time.[97] MEM was not prepared to receive financing that did not include a significant portion of grant aid for a renewable project that was not financially viable on its own economic merits, and an overly short project implementation window weakened ADB’s ability to reevaluate its approach. While these points of failure contributed to the project not achieving its envisaged outcomes, they do still underscore the challenges—both financially and operationally—in helping the Lao PDR achieve its remaining electrification objectives.
Affordable electricity tariffs are critical to achieving the government’s goals of rural electrification and 95% electricity access. However, as current tariffs are below cost recovery levels, EDL should focus on measures to reduce the cost of supply, including reducing technical and nontechnical transmission and distribution losses, more strictly managing accounts receivable, implementing demand-side management measures, and extending credit for payment of service connection costs (footnote 22), while executing its policy on gradually increasing tariffs at 2% annually. At the same time, the government plans to electrify the remaining households with grid extension; however, this strategy may not be economically viable, as previously mentioned, because the marginal cost to electrify the final 8% of households is estimated to be more than double the cost of electrifying the previous 15%–20% of households. Therefore, the government may want to explore a combination of on-grid and offgrid alternatives, including renewables-based mini-grids and battery storage through a least-cost planning approach. Given the Lao PDR’s large solar endowment and recent reductions in the cost of renewables-based electricity, especially for solar, the Lao PDR may be well-served with off-grid renewables to meet a large portion of its rural electrification needs. Further, this would contribute to the country’s national renewable energy targets. 6.5 Other Development Partner Support
Alongside ADB, several development partners are active in the energy sector in the
Lao PDR, notably JICA, Agence Française de Développement (AFD), the United States Agency for International Development (USAID), and the World Bank, highlighting the need for close cooperation given the interrelated nature of many of the issues the Lao PDR power sector is facing.
JICA has been a long-standing donor and plays a particularly active role in the sector; focus areas of assistance have included planning and feasibility studies of hydropower projects, and technical and investment support for power transmission and distribution infrastructure such as the Southern Region Power System Development Project, which was completed in 2016. Currently, JICA is assisting the Lao PDR with a 40 MW expansion of the Nam Ngum 1 hydropower project, the capacity of which is expected to rise to 195 MW by 2020 (though it is understood that it will be delayed).[98] Since September 2017, JICA has also been providing technical assistance to MEM’s Department of Energy Policy and Planning and EDL on workstreams to support the development of a power system master plan and improve the capacity and resilience of the Lao PDR’s transmission grid.
AFD has provided support for the development of the Nam Theun 2 hydropower project via a nonsovereign loan to Lao Holding State Enterprise (LHSE) and a government grant, and has recently initiated a technical assistance program to complement resettlement and alternative livelihood activities relating to the project.[99] AFD is also currently considering providing nonsovereign loans of up to €50 million to promote the deployment of new renewable technologies. Potential initiatives include a direct loan to EDL-Gen and EDL-Gen Solar to deploy 3–15 MW of solar PV, as well as a credit line to local banks to help finance small-scale renewable projects, particularly small hydropower.
The World Bank has played a central role in electrification initiatives through a commitment of $10 million toward Phase 1 of the Rural Electrification Project[100] in 2006, followed by a further $20 million toward Phase 2 in 2010.[101] In 2005, the World
Bank committed $20 million in grant financing[102] toward the development of Nam Theun 2, an export-oriented hydropower project, and has also provided technical assistance focusing on tariff reform and electricity loss reduction. More recently, the World Bank has provided technical assistance to MEM to allow them to get advice in their review of the financial situation of the power sector, with tariff design as one key aspect (footnote 72). The World Bank is also assisting EDL with a distribution loss reduction plan, in recognition of the need for automation.
In partnership with ADB, USAID’s Clean Power Asia program is undertaking renewable energy-focused technical assistance work in the Lao PDR. In particular, USAID is developing a capacity-building plan for integrating renewable energy, energy efficiency, and climate resilience into the power development planning process and is assisting MEM to design a solar pilot auction.
6.6 ADB Sector Forward Strategy
Under the CPS 2017–2020, ADB operations will focus on (i) improving physical connectivity to catalyze private sector investment in the economy to generate employment and income, (ii) developing skills that support growth in the nonresource sectors and improving access to health services to enhance labor productivity, and (iii) ensuring sustainable natural resource management and climate resilience.[103] Gender equity and governance are crosscutting themes. The energy sector directly supports outcomes under priority (i) above, including supporting regional cooperation and integration through improved rural electrification and increased energy trade as well as the promotion of renewable energy and energy efficiency. The CPS will flexibly respond to government priorities as they evolve. The CPS priorities are aligned with the 8th NSEDP and will help the Lao PDR achieve its commitments to the United Nations Sustainable Development Goals and Nationally Determined Contributions. The CPS also incorporates lessons learned from past ADB operations.
6.7 Lending and Non-Lending Program and Resource Needs
In support of the first strategic pillar of the CPS 2017–2020, ADB’s public and private sector operations will complement the government’s initiatives to (i) complete the electrification agenda, (ii) expand the national transmission and distribution network with cross-border interconnections, and (iii) develop large hydropower and renewable energy sources in an environmentally and socially sustainable manner. The GMS Economic Cooperation Program[104] will continue to be a key platform from which ADB will deliver support. ADB will also support the expansion of on-grid and off-grid distribution, particularly in border areas. ADB’s Private Sector Operations Department will continue to look for opportunities in the generation and transmission sectors, and the Office of Public–Private Partnership will explore the feasibility of supporting investments in transmission. The program will include both lending and non-lending products as detailed in the sector results framework.
6.7.1 Lending Products
Distribution Expansion
ADB plans to continue funding investments in cross-border power trade and new grid expansion projects. An investment project, the Rural Power Distribution and Efficiency Improvement Project, scheduled for 2019 as standby, aims to (i) expand distribution networks in the provinces of Phongsaly, Huaphanh, and Xieng Khuang; and (ii) provide at least 3,640 household connections. Project preparatory activities for this project were initiated in April 2018.
Large Hydropower and Renewables
ADB will continue to monitor the development of renewable energy generation in the Lao PDR and explore possibilities for supporting investments in renewablebased mini-grids, battery storage, and floating solar. ADB’s Private Sector Operations Department will continue to seek investment opportunities in sustainable hydropower generation and other renewable sources.
6.7.2 Non-Lending Products
Regional Cooperation and Power Trade
Energy cooperation, a major pillar of the wider GMS Economic Cooperation Program, is motivated by rapid growth in demand and concerns about energy security throughout the GMS and is facilitated by the RPTCC. Established in 2002, the RPTCC focuses on strengthening regional transmission networks, promoting cross-border investments in energy resources, and developing a regional electricity market in a phased manner. Regional electricity trade can make use of the diverse regional energy resources and power supply in meeting varying demand profiles and contribute to improved reliability, lower costs, and reduced emission levels across the subregion. ADB strongly supports regional power trade as an important element of its policy to emphasize regional economic cooperation.
In the Lao PDR, ADB will assist the government to explore options for additional electricity export due to excess domestic hydropower generation. Under the GMS Economic Cooperation Program (footnote 108), a technical assistance activity for $1.5 million has been approved to support feasibility studies for priority interconnection projects, including a Lao PDR–Myanmar connection (Luang Namtha–Shan State) and Northern Lao PDR–Viet Nam connection (Xam Neua– Nho Quan).
Capacity Building and Institutional Reform
ADB and the World Bank provide technical support to the RPTCC and its two working groups: the Working Group on Regulatory Issues and the Working Group on Performance Standards and Grid Code (footnote 108). The Working Group on Regulatory Issues is in the process of harmonizing regulations regarding open (third-party) access to transmission systems, developing a framework for calculating wheeling charges for use of common transmission facilities, and creating a standard template for long-term power purchase agreements (PPAs). The Working Group on Performance Standards and Grid Code has developed common performance standards and is currently preparing a regional grid code.
6.8 Risks and Assumptions
The fundamental assumption for ADB’s proposed strategy of support for the energy sector is that the government will implement the 8th NSEDP, 2016–2020, which includes targets for the provision of reliable and sustainable energy for domestic and export markets. The government’s Energy Policy 2015 and PDP for 2010–2020 serve as the basis for ADB’s energy strategy for the Lao PDR.
Mobilizing financing, particularly for the build-out of transmission infrastructure for power export, is a key challenge the government must overcome if it wishes to meet
the targets for the energy sector. ADB and other development partners can help by leveraging both public and private sector funding.
ADB’s proposed strategy of support for the Lao PDR energy sector is subject to three main risks. First, the Lao PDR has a limited capacity to plan for, evaluate, and manage energy projects. Well-trained staff are required to identify and appraise potential projects; assess financial, social, and environmental impacts; and implement and manage projects. Second, the rising interest of private developers in projects in the Lao PDR may increase the risk that unsolicited or even unnecessary projects are accepted without considering financial implications or mitigating the environmental and social impacts. Finally, delays in securing IPPs and/or off-take arrangements from neighboring countries would severely impact the government’s export target. For ADB’s program, this would affect support for high-voltage transmission interconnection projects.
The proposed ADB strategy in support of the Lao PDR energy sector includes risk mitigation. Capacity building for MEM, EDL, and Ministry of Natural Resources and Environment staff will be integrated into ADB projects and programs. With appropriate training, the staff of the MEM and EDL will be better able to evaluate the technical, financial, and economic feasibility of project proposals. Well-trained and experienced staff will also be able to properly prioritize power projects and ensure that project developers apply best practice in meeting the standards of ADB’s social and environmental safeguards. The third risk will be mitigated through greater support to project readiness. ADB’s strategy includes support in partnership with both the public sector (for transmission network projects) and the private sector (for hydropower projects).
In summary, the proposed ADB strategy in support of the Lao PDR energy sector is based on the needs of the country, as identified by the government. While there are some risks associated with the implementation of the strategy, appropriate risk mitigation measures have been incorporated.
Country Sector Outcomes Country Sector Outputs | ADB Sector Operations |
Sector Outcomes with ADB Contribution | Indicators with Targets and Sector Outputs with Indicators with Baselines ADB Contribution Incremental Targets | Planned and Ongoing ADB Interventions | Main Outputs Expected from ADB Interventions |
Increased grid-electricity consumption and cross-border electricity trade Improved connectivity of physical infrastructure Enhanced institutional, regulatory, and human resource capacity to provide reliable and sustainable energy/ electricity supply | Power demand Electricity 920 km of increases to 2,000 transmission additional HV MW by 2023 (2017 and distribution transmission baseline: 928 MW) system expanded, lines constructed Electricity exports improved, and well managed by 2023 (2017 baseline: 8,753 km) increased to 30.0 TWh/year by Institutions and 500 km of 2023 institutional additional MV (2017 baseline: capacity sub-transmission 24.9 TWh/year) established for lines constructed Household renewable energy and energy by 2023 (2017 baseline: electrification rate efficiency 30,720 km) increases to 95% in 2020 (2017 Increased use of 500 km of baseline: 92%) renewable energy additional and practice of LV distribution energy efficiency lines constructed by 2023 (2017 baseline: 19,279 km) | Planned key activity areas Transmission and distribution network expansion, including HV lines for domestic connections and international power trade Development of a GMS power market Capacity building for energy efficiency and conservation Pipeline projects with estimated amounts Rural Power Distribution and Efficiency Improvement Project (2019: $30 million OCR) Ongoing projects with approved amounts GMS Northern Power Transmission Project ($20 million and $37.9 million cofinancing) | Pipeline projects About 120 km of distribution lines in Phongsaly, Huaphanh, and Xieng Khuang constructed Electrify at least 3,640 households Ongoing projects Electrify up to 18,800 households and provide nointerest credit to 8,600 households 398 km of 115 kV transmission lines with associated 115kV-to-22 kV substations, and 1,100 km of 22 kV distribution lines to expand the grid in three provinces Capacity building for EDL and MEM National policy on energy efficiency and conservation |
ADB = Asian Development Bank, EDL = Électricité du Laos, GMS = Greater Mekong Subregion, HV = high-voltage, km = kilometer, kV = kilovolt, Lao PDR = Lao People’s Democratic Republic, LV = low-voltage, MEM = Ministry of Energy and Mines, MV = medium-voltage, MW = megawatt, MWh = megawatt-hour, OCR = ordinary capital resources, TWh = terawatt-hour. Source: ADB.
Power Plants of the Lao People’s Democratic Republic, as of 2017
Plant Name | Region | Capacity (MW) Fuel Total Domestic Export | COD |
Nam Dong | North | Hydro 1.0 1.0 | 1970 |
Nam Ko | North | Hydro 1.5 1.5 | 1996 |
Nam Boun 1 | North | Hydro 0.1 0.1 | 1996 |
Nam Mong | North | Hydro 0.1 0.1 | 1996 |
Nam Ngay | North | Hydro 1.2 1.2 | 2001 |
Nam Nhone | North | Hydro 3.0 3.0 | 2011 |
Nam Tha 3 | North | Hydro 1.3 1.3 | 2011 |
Houay Ngou | North | Hydro 0.0 0.0 | 2011 |
Nam Sae | North | Hydro 0.1 0.1 | 2012 |
Nam Long | North | Hydro 5.5 5.5 | 2013 |
Hongsa Lignite | North | Lignite 1,878.0 100.0 1,778.0 | 2015–2016 |
Nam Karn 2 | North | Hydro 130.0 130.0 | 2015 |
Nam Ou 9 | North | Hydro 0.5 0.5 | 2015 |
Nam Ou 2 | North | Hydro 120.0 120.0 | 2016 |
Nam Beng | North | Hydro 36.0 36.0 | 2016 |
Nam Ou 5 | North | Hydro 240.0 240.0 | 2016 |
Nam Ou 6 | North | Hydro 180.0 180.0 | 2016 |
Nam Karn 3 | North | Hydro 60.0 60.0 | 2016 |
Nam Peun 2 | North | Hydro 12.0 12.0 | 2017 |
Nam Nga 2 | North | Hydro 14.5 14.5 North 2,684.7 906.7 1,778.0 | 2017 |
Nam Ngum 1 | Central 1 | Hydro 155.0 155.0 | 1971 |
Nam San | Central 1 | Hydro 0.1 0.1 | 1995 |
Nam Et | Central 1 | Hydro 0.1 0.1 | 1995 |
Nam Sat | Central 1 | Hydro 0.3 0.3 | 1999 |
Nam Leuk | Central 1 | Hydro 60.0 60.0 | 2000 |
Nam Mang 3 | Central 1 | Hydro 40.0 40.0 | 2005 |
Nam Lik 1/2 | Central 1 | Hydro 100.0 100.0 | 2010 |
Nam Ngum 2 | Central 1 | Hydro 615.0 615.0 | 2012 |
Nam Song | Central 1 | Hydro 6.0 6.0 | 2012 |
Nam Ngum 5 | Central 1 | Hydro 120.0 120.0 | 2012 |
continued on next page
Appendix 2 75
continued
Plant Name | Region | Capacity (MW) Fuel Total Domestic Export | COD |
Nam Ka 1/2 | Central 1 | Hydro 0.1 0.1 | 2013 |
Nam Ngiep 3A | Central 1 | Hydro 44.0 44.0 | 2014 |
Tadlang (Nam Saen) | Central 1 | Hydro 5.0 5.0 | 2014 |
Nam Ngiep 2 | Central 1 | Hydro 180.0 180.0 | 2015 |
Nam Sana | Central 1 | Hydro 14.0 14.0 | 2015 |
Nam San 3B | Central 1 | Hydro 45.0 45.0 | 2015 |
Nam San 3A | Central 1 | Hydro 69.0 69.0 | 2016 |
Nam Mang 1 | Central 1 | Hydro 64.0 64.0 | 2016 |
Nam Kuen | Central 1 | Hydro 0.0 0.0 | 2016 |
Nam Song | Central 1 | Hydro 3.0 3.0 | 2016 |
Nam Ngiep 2C | Central 1 | Hydro 14.6 14.6 | 2017 |
Nam Phal | Central 1 | Hydro 86.0 86.0 | 2017 |
Naxaythong Solar Farm | Central 1 | Solar 32.0 32.0 Central 1 1,653.1 1038.1 615.0 | 2017 |
Theun-Hinboun | Central 2 | Hydro 220.0 220.0 | 1998 |
Nam Theun 2 | Central 2 | Hydro 1,075.0 75.0 1,000.0 | 2010 |
Nam Phao | Central 2 | Hydro 1.7 1.7 | 2011 |
Nam Gnouang 8 | Central 2 | Hydro 60.0 60.0 | 2012 |
Tadsalen | Central 2 | Hydro 3.2 3.2 | 2012 |
Theun-Hinboun Extension | Central 2 | Hydro 220.0 0.0 220.0 | 2012 |
Mit Lao Biomass Factory | Central 2 | Biomass 5.0 5.0 Central 2 1,584.9 144.9 1,440.0 | 2012 |
Selabam | South | Hydro 5.0 5.0 | 1969 |
Xeset 1 | South | Hydro 45.0 45.0 | 1991 |
Houay Ho | South | Hydro 152.0 2.0 150.0 | 1999 |
Xeset 2 | South | Hydro 76.0 76.0 | 2009 |
Houay Samong | South | Hydro 0.1 0.1 | 2013 |
Xekamman 3 | South | Hydro 250.0 25.0 225.0 | 2013 |
Xe Namnoy 1 | South | Hydro 14.8 14.8 | 2013 |
Houg Anh Biomass Power House | South | Biomass 20.0 20.0 | 2015 |
Houay Lamphangnay | South | Hydro 88.0 88.0 | 2015 |
Xe Namnoy 6 | South | Hydro 5.0 5.0 | 2016 |
Xeset 3 | South | Hydro 25.0 25.0 | 2016 |
Xenamnoy 2-Xekatam 1 | South | Hydro 10.0 10.0 | 2017 |
Xekaman 1 | South | Hydro 290.0 32.0 258.0 | 2017 |
Nam Kong 2 | South | Hydro 66.0 66.0 South 1,046.9 413.9 633.0 National 6,969.6 2,503.6 4,466.0 | 2017 |
COD = commercial operation date, MW = megawatt.
Note: Numbers may not sum precisely because of rounding.
Sources: Government of the Lao People’s Democratic Republic, Ministry of Energy and Mines. 2017. Electricity Statistics 2016. Vientiane; and Japan International Cooperation Agency. 2018. The Study on Power System Network Master Plan in Lao PDR. Presentation prepared for a preliminary meeting for power export scenario setting. Vientiane. April.
Key Transmission Projects Proposed in the Lao People’s Democratic Republic
Domestic Transmission Line Projects No. From To | Voltage (kV) | Length (km) | COD |
North and Central 1 Regions | | | | |
1 Thafa | Luangnamtha 1 | 115 | 91 | 2017 |
2 Thafa | Pha Oudom | 115 | 22 | 2017 |
3 Thafa | Houayxai | 115 | 51 | 2017 |
4 Xayabuli | Paklay | 115 | 123 | 2017 |
5 Paklay | Non Hai | 115 | 104 | 2017 |
6 Paklay | Ken Thao (Border) | 115 | 67 | 2017 |
7 Nam Ou 7 | Nam Ou 6 | 230 | 39 | 2020 |
8 Nam Ou 4 | Nam Ou 2 | 230 | 33 | 2020 |
9 Nam Ou 3 | Pak Mong | 230 | 33 | 2020 |
10 Hin Huep | Thalat 2 | 230 | 30 | 2017 |
11 Thalat 2 | Na Bong | 230 | 58 | 2017 |
12 Tha Bok | Na Bong | 230 | 23 | 2017 |
Central 2 and South Regions | | | | |
13 Tha Vieng | Lak 20 | 230 | 220 | 2017 |
14 Ban Hat | Don Sahong HPP | 230 | 27 | 2019 |
COD = commercial operation date, HPP = hydropower project, km = kilometer, kV = kilovolt.
Cross-Border Interconnection Projects No. From To | Voltage (kV) | Status | Estimated COD |
North Region | | | | |
1 Paklay | Tha li (Thailand) | 115 | Under construction | 2018 |
2 Ton Pheung | Mae Chan (Thailand) | 115 | Proposed | 2020–2024 |
3 Ton Pheung | Tachileck (Myanmar) | 115 | Proposed | 2020–2024 |
4 M. Long | Shan State (Myanmar) | 230 | Planned | 2020–2025 |
5 MK_Xayabuly | Loei 2 (Thailand) | 500 | Under construction | 2019 |
6 Na Mo | Ban Na (PRC) | 500 | Under study | 2021 |
7 Muang Houn | Nan 2 (Thailand) | 500 | Planned | 2024 |
8 Xam Nuea | Nho Quan (Viet Nam) | --- | Under study | TBD |
South Region | | | | |
9 Ban Hat | Stung Treng (Cambodia) | 230 | Proposed | TBD |
10 Ban Lak 25 | Ubon 3 (Thailand) | 500 | Under construction | 2019 |
11 Hat Xan | Plei ku (Viet Nam) | 500 | Under study | 2021–2025 |
COD = commercial operation date, kV = kilovolt, PRC = People’s Republic of China, TBD = to be determined.
Source: Government of the Lao People’s Democratic Republic, Ministry of Energy and Mines.
Pipeline of Hydropower Projects of the Lao People’s Democratic Republic Projects to be commissioned over 2018–2023 are the following:
Plant name | Region | Status | COD | | Capacity (MW) | |
Total | Domestic | Export |
Nam Peun 1 | North | Under construction | 2018 | 15.0 | 15.0 | |
Nam Sim | North | Under construction | 2018 | 9.0 | 9.0 | |
Nam Tha 1 | North | Under construction | 2018 | 168.0 | 168.0 | |
Nam Hao | North | Under construction | 2019 | 15.0 | 15.0 | |
Nam Mon 1 | North | Under construction | 2019 | 10.0 | 10.0 | |
Nam Dick 1 | North | Under construction | 2020 | 15.0 | 15.0 | |
Nam Ngao | North | Under construction | 2020 | 15.0 | 15.0 | |
Nam Ou 1 | North | Under construction | 2020 | 180.0 | 180.0 | |
Nam Ou 3 | North | Under construction | 2020 | 210.0 | 210.0 | |
Nam Ou 4 | North | Under construction | 2020 | 132.0 | 132.0 | |
Nam Ou 7 | North | Under construction | 2020 | 210.0 | 210.0 | |
Nam Tha 2 | North | Under construction | 2020 | 14.8 | 14.8 | |
Nam Xam 3 | North | Under construction | 2020 | 156.0 | 156.0 | |
Nam Xam 1 | North | PDA | 2020 | 75.0 | 75.0 | |
Nam Long New | North | Under construction | 2021 | 13.1 | 13.1 | |
Nam Ngum 4 | North | Under construction | 2021 | 240.0 | 240.0 | |
Nam Seung 1 | North | PDA | 2021 | 30.0 | 30.0 | |
Nam Ta Lan 2 | North | Under construction | 2021 | 5.0 | 5.0 | |
MK Pakbeng | North | PDA | 2022 | 912.0 | 114.0 | 798.0 |
Nam Pha | North | CA | 2022 | 180.0 | 180.0 | |
Nam Seung 2 | North | PDA | 2022 | 108.0 | 108.0 | |
Nam Xam 4 | North | PDA | 2023 | 150.0 | 150.0 | |
| | North | | 2,862.9 | 2,064.9 | 798.0 |
Nam Chiene | Central 1 | Under construction | 2018 | 104.0 | 104.0 | |
Nam Aow (Nam Pot) | Central 1 | Under construction | 2018 | 15.0 | 15.0 | |
Nam Ngum 1 (extension phase) | Central 1 | Under construction | 2018 | 80.0 | 80.0 | |
Nam PhaGnai | Central 1 | Under construction | 2018 | 19.0 | 19.0 | |
continued on next page
78 Appendix 4
continued
Plant name | Region | Status | COD | | Capacity (MW) | |
Total | Domestic | Export |
MK Xayaboury | Central 1 | Under construction | 2019 | 1,285.0 | 60.0 | 1,225.0 |
Nam Houng Down | Central 1 | Under construction | 2019 | 12.5 | 12.5 | |
Nam Lik 1 | Central 1 | Under construction | 2019 | 64.0 | 64.0 | |
Nam Ngiep 1 (off-take) | Central 1 | Under construction | 2019 | 294.0 | | 294.0 |
Nam Ngiep 2A | Central 1 | Under construction | 2019 | 12.6 | 12.6 | |
Nam Ngiep 2B | Central 1 | Under construction | 2019 | 9.4 | 9.4 | |
Nam Ngiep Regulation | Central 1 | Under construction | 2019 | 18.0 | 18.0 | |
Nam The | Central 1 | Under construction | 2019 | 15.0 | 15.0 | |
Nam Mone | Central 1 | Under construction | 2020 | 6.0 | 6.0 | |
Nam Ngum 1 (extension phase) | Central 1 | Under construction | 2020 | 40.0 | 40.0 | |
Nam Ngum 3 | Central 1 | Under construction | 2020 | 480.0 | 480.0 | |
Nam Samoi | Central 1 | Under construction | 2020 | 5.0 | 5.0 | |
Nam Samuay | Central 1 | Under construction | 2020 | 5.0 | 5.0 | |
Kengseuaten | Central 1 | CA | 2021 | 54.0 | 54.0 | |
Nam Chee 1 | Central 1 | PDA | 2021 | 5.0 | 5.0 | |
Nam Chee 2 | Central 1 | PDA | 2021 | 7.9 | 7.9 | |
Nam Mat (Xieng Kuang) | Central 1 | PDA | 2021 | 15.0 | 15.0 | |
Nam Mat 1 | Central 1 | PDA | 2021 | 15.0 | 15.0 | |
Nam Chat 2 | Central 1 | PDA | 2022 | 8.0 | 8.0 | |
Nam Ken | Central 1 | PDA | 2022 | 5.0 | 5.0 | |
Nam Mo 2 | Central 1 | CA | 2022 | 120.0 | 120.0 | |
Nam Ngum Keng Kaun | Central 1 | Under construction | 2022 | 1.0 | 1.0 | |
Nam Phoun | Central 1 | PPA | 2022 | 45.0 | 45.0 | |
Nam Sor (Borikhamxai) | Central 1 | PPA | 2022 | 5.0 | 5.0 | |
Nam Theun 1 | Central 1 | Under construction | 2022 | 650.0 | 130.0 | 520.0 |
Nam Bak 1 | Central 1 | PDA | 2023 | 160.0 | 160.0 | |
Nam Mo 1 (Nam Kan) | Central 1 | PDA | 2023 | 60.0 | 60.0 | |
Nam Mouan | Central 1 | Feasibility study | 2023 | 100.0 | 100.0 | |
Nam Phouan | Central 1 | PDA | 2023 | 52.8 | 52.8 | |
Nam Poui | Central 1 | PDA | 2023 | 60.0 | 60.0 | |
| | Central 1 | | 3,828.2 | 1,789.2 | 2,039.0 |
Nam Hinboun | Central 2 | Under construction | 2018 | 30.0 | 30.0 | |
Nam Hinboun (Down) | Central 2 | Under construction | 2020 | 15.0 | 15.0 | |
Tadsakhoy | Central 2 | PDA | 2021 | 30.0 | | 30.0 |
Xebanghieng 2A Tatsakhoy | Central 2 | PDA | 2021 | 30.0 | 30.0 | |
Xelanong 1 | Central 2 | Under construction | 2021 | 70.0 | 70.0 | |
| | Central 2 | | 175.0 | 145.0 | 30.0 |
continued on next page
Appendix 4 79
continued
Plant name | Region | Status | COD | | Capacity (MW) | |
Total | Domestic | Export |
Xekaman-Xanxai | South | Under construction | 2018 | 32.0 | 32 | |
Xeset-Houaytapong | South | CA | 2018 | 13.0 | 13 | |
Houay pow | South | Under construction | 2019 | 15.0 | 15.0 | |
MK. Donsahong | South | Under construction | 2019 | 260.0 | 260.0 | |
Xeplen-Xenamnoy | South | Under construction | 2019 | 410.0 | 40.0 | 370.0 |
Xeset-Kengxan | South | Under construction | 2019 | 13.0 | 13.0 | |
Dakcha Liew 1 | South | PPA | 2020 | 11.0 | 11.0 | |
Dakcha Liew 2 | South | PPA | 2020 | 13.0 | 13.0 | |
Houay Chiae | South | Under construction | 2020 | 8.0 | 8.0 | |
Houay Pa Gnoo Down | South | PDA | 2020 | 15.0 | 15.0 | |
Xekatam | South | PDA | 2020 | 81.0 | 81.0 | |
Xekong (Downstream) A | South | PDA | 2020 | 76.0 | 76.0 | |
Houay Palai | South | Under construction | 2021 | 26.0 | 26.0 | |
Houay Phok | South | PPA | 2021 | 12.0 | 12.0 | |
Houay Yoi-Houaykod | South | Under construction | 2021 | 15.0 | 15.0 | |
Houaylay | South | PDA | 2021 | 3.0 | 3.0 | |
Nam kong 1 | South | PPA | 2021 | 160.0 | 160.0 | |
Nam Kong 3 | South | CA | 2021 | 45.0 | 45.0 | |
Nam Pak | South | PDA | 2021 | 150.0 | 150.0 | |
Houay kaphuek Down | South | PDA | 2022 | 7.0 | 7.0 | |
Houay La Nge | South | PDA | 2022 | 60.0 | 60.0 | |
Houy Palal down | South | Under construction | 2022 | 4.0 | 4.0 | |
Houykapheu 1 | South | Under construction | 2022 | 5.0 | 5.0 | |
Nam Bi 1 | South | PDA | 2022 | 50.0 | 50.0 | |
Nam Bi 2 | South | PDA | 2022 | 68.0 | 68.0 | |
Nam Bi 3 | South | PDA | 2022 | 12.0 | 12.0 | |
Sekong 5 | South | Feasibility study | 2022 | 330.0 | 330.0 | |
Xekong 4A | South | MOU | 2022 | 175.0 | | 175.0 |
Xekong 4B | South | MOU | 2022 | 165.0 | | 165.0 |
Xelanong 2 | South | PDA | 2022 | 35.0 | 35.0 | |
Houay Champi | South | PDA | 2023 | 5.0 | 5.0 | |
Xekaman 2B | South | Feasibility study | 2023 | 185.0 | 185.0 | |
Xekaman 4 | South | PDA | 2023 | 70.0 | 70.0 | |
Xenamnoy 5 | South | PDA | 2023 | 5.0 | 5.0 | |
| | South | | 2,534.0 | 1,824.0 | 710.0 |
| | National | | 9,400.1 | 5,823.1 | 3,577.0 |
CA = construction agreement, COD = commercial operation date, MOU = memorandum of understanding, MW = megawatt, PDA = project development agreement.
Sources: Government of the Lao People’s Democratic Republic, Ministry of Energy and Mines. 2017. Electricity Statistics 2016. Vientiane; and Japan International Cooperation Agency. 2018. The Study on Power System Network Master Plan in Lao PDR. Presentation prepared for a preliminary meeting for power export scenario setting. Vientiane. April.
Laws and Regulations for Power Project Development in the Lao People’s Democratic Republic
Salient laws and regulations pertaining to the development of power projects in the Lao PDR:
Law/Regulation | Aspects Relating to Electricity Generation |
The Lao Land Law (1997) | Stipulation of land as a state-owned asset and provision of rights for its utilization, lease, transfer, and inheritance Subsequent regulations relate to the expropriation of land and compensation (Decree on Compensation and Resettlement No. 192/PM 2005), as well as the compensation and relocation for those displaced by development projects (Regulation for the Agreement on Lao National Environmental Standards, 2010). |
Decree on the Preservation of Cultural, Historical, and Natural Heritage (1997) | Designation of national heritage areas that require preservation (Articles 5 and 8) |
Forestry Law (2007 revision) | Stipulation of natural forests and forested areas being state-owned assets Note that the Lao PDR’s Forestry Strategy to the Year 2020, tabled as a project to meet its INDC commitments, seeks to increase forest cover to 70% of total land area by 2020. |
Constitution of the Lao People’s Democratic Republic (2003 and 2015 revisions) | Revised in 2003 (Article 19) to state that there is a national obligation to protect the environment and natural resources Further revised in 2015 (Article 17) to increase the authority of the state, such that “natural resources such as land, minerals, water, air, forest, non-timber forest products, aquatic organisms, and wildlife are owned by the national community represented by the government, and the State ensures the rights to use, transfer and inherit them nationwide in accordance with the laws.” |
Environmental Protection Law (2012 and 2013 revisions) | Enacted in 1999 as a law “embodying Article 19 of the constitution” of the Lao PDR, requiring environmental assessment for any projects that affect, conserve, or utilize natural resources Later expanded from 2010 onward to include specific requirements, regulations, and guidelines for the environmental assessments (In particular, the Decree on Environmental Impact Assessment (2010) set out that any hydropower project above 15 MW requires an environmental impact assessment, with those projects less than 15 MW requiring an initial environmental examination.) 2013 revision states that a strategic environmental assessment is required when developing policies, strategic plans, and programs in the energy sector. |
Water and Water Resource Law (1996 and 2013) | The imposition of a service fee for water use was introduced in December 2015, equating to 5% or more of total income from all export-oriented hydropower projects and domestic hydropower projects exceeding 15 MW. Those domestic hydropower projects less than 15 MW are subject to a water usage fee of 5% of total income. The Water and Water Resource Law was due to be revised in April 2017 to reflect data and information gathering requirements pertaining to the use of hydrological resources (e.g., in electricity generation). |
INDC = intended nationally determined contribution, Lao PDR = Lao People’s Democratic Republic, MW = megawatt.
Source: Government of the Lao People’s Democratic Republic, Ministry of Energy and Mines.
Lao People’s Democratic Republic Energy Sector Assessment, Strategy, and Road Map
Expanded access to modern and affordable sources of energy and more efficient use of energy resources are needed for the Lao People’s Democratic Republic to achieve its development goals. This publication provides an overview of the country’s energy sector, examines its performance, the challenges it faces, and the government’s energy strategy. It also reflects on lessons learned from past Asian Development Bank assistance and proposes potential areas for future support.
About the Asian Development Bank
ADB is committed to achieving a prosperous, inclusive, resilient, and sustainable Asia and the Pacific, while sustaining its efforts to eradicate extreme poverty. Established in 1966, it is owned by 68 members —49 from the region. Its main instruments for helping its developing member countries are policy dialogue, loans, equity investments, guarantees, grants, and technical assistance.
ASIAN DEVELOPMENT BANK
6 ADB Avenue, Mandaluyong City 1550 Metro Manila, Philippines www.adb.org