Meta Data
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
2000
Scope: 
National
Document Type: 
Rule/Regulation
Economic Sector: 
Energy, Power, Multi-Sector
Energy Types: 
All, Oil, Power, Gas, Renewable, Hydropower
Issued by: 
Ministry of Environment
Overall Summary: 
The Pakistan Environmental Protection Agency (Review of IEE and EIA) Regulations, 2000 is fully titled as the Pakistan Environmental Protection Agency Review of Initial Environmental Examination and Environmental Impact Assessment Regulations, 2000, require all the energy projects listed in Schedule I shall file an initial environmental examination (IEE) with the Federal Agency.
Environment
Pollution control action plans: 
3. Projects requiring an IEE. A proponent of a project falling in any category listed in Schedule I shall file an IEE with the Federal Agency, and the provisions of section 12 shall apply to such project. [...] SCHEDULE I (See Regulation 3). List of projects requiring an IEE. B. Energy: 1. Hydroelectric power generation less than 50 MW 2. Thermal power generation less than 200 KW 3. Transmission lines less than 11 KV, and large distribution projects 4. Oil and gas transmission systems 5. Oil and gas extraction projects including exploration, production, gathering systems, separation and storage 6. Waste-to-energy generation projects.