Meta Data
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
2015
Scope: 
National
Document Type: 
Overarching Policy
Economic Sector: 
Energy, Power, Transport
Energy Types: 
All, Oil, Power, Gas, Nuclear, Renewable, Bioenergy, Hydropower, Solar, Other
Issued by: 
Ministry of Energy
Overall Summary: 
Thailand Integrated Energy Blueprint is an integrated master energy plan comprising five master plans (The Power Development Plan - PDP, The Energy Efficiency Development Plan - EEDP, The Alternative Energy development Plan - AEDP, The Oil Development Plan and The Gas Development Plan). The plan is divided into a five-year short-term plan (2022-2027), a five to 10 year mid-term plan and a 20-year long-term plan.
Governance
National policy structure: 
Thailand Integrated Energy Blueprint (TIEB) includes: 1. Power Development Plan (PDP); 2. Energy Efficiency Development Plan (EEDP); 3. Alternative Energy Development Plan (AEDP); 4. Gas Plan; 5. Oil Plan.