Meta Data
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
2007
Scope: 
National
Document Type: 
Other
Economic Sector: 
Energy
Energy Types: 
Coal
Issued by: 
Ministry of Coal
Overall Summary: 
The Procedure for Processing of Proposals for IPPs/CPPs Seeking Coal Blocks/Coal Linkage Received from the Ministry of Coal outlines the guidelines for allocation of coal blocks/linkages for power sector.
Governance
Energy management principles: 
3.(i) The applicants are required to send their proposals directly to the Ministry of Coal for grant of coal blocks / coal linkage. (ii) The proposals as received from the Ministry of Coal for comments would be sent to the Central Electricity Authority (CEA) for their examination and remarks. For this purpose, CEA would set up a Standing Committee with the following composition to examine proposals for coal linkage / coal blocks: 1. Member (Thermal) CEA 2. Chief Engineer (Thermal) CEA 3. Chief Engineer (Planning) CEA 4. Chief Engineer (OM) CEA 5. Nominee of Power Finance Corporation Ltd, New Delhi.