Meta Data
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
2005
Scope: 
National
Document Type: 
Guideline
Economic Sector: 
Power
Energy Types: 
Power
Issued by: 
Ministry of Water and Power
Overall Summary: 
In order to remove ambiguities about various parameters for tariff determination and streamline the process of determination of tariff for Independent Power Producers (IPPs) consistent with the Policy for Power Generation Projects 2002, the Government of Pakistan under Section 7 (6) of the Regulation of Generation, Transmission, and Distribution of Electric Power Act (XL of) 1997 (NEPRA Act) has issued the following guidelines.
Pricing
Energy pricing: 
---- NEPRA should now determine an upfront tariff, alongwith complete reference tariff table, and announce it on yearly basis.. IPPs opting for this tariff be deemed to have NEPRA’s approval and can be issued LOS by the competent agency. This •will save a lot of time to Individual lPPs_ This will also save NEPRA frorn the repetitive process of hearings. –--- NEPRA should give upfront tariff separately for each technology e.g. CC plants, conventional steam and dieseI engines after. ---- If an IPP wishes to submit an un-solicited bid according to power policy of 2002 and wants to settle tariff through negotiations, NEPRA should determine the tariff in consultation with the IPP and the power purchasers.---- Tariff should be determined allowing reasonable Internal Rate of Returns (IRR) on equity investment ---- IRR be calculated over the life of the Implementation agreement starting from the date of construction start{ i.e. start of payments to contractors}. ---- IRR should be equal to the long-term interest rates based on auction of ten year PIB held during the last six months plus a premium of "X "% to be determined by NEPRA. ---- For BOOT projects the investor’s equity be allowed to redeemed after completion of debt servicing. The redemption in equity be in equal installments from the time debt servicing has been completed till the end of the concessions period. Effect of exchange rate variation be compensated for equity redemption. The projects be transferred to GoP at the end of concession period at a notional cost of Rs. 1. ---- For BOO projects there should be no redemption of equity. ---- For determination of tariff by NEPRA for the fiscal year 2005-2006, the benchmark rate of interest be taken as KIBOR plus 300 basis points for a 10 year loan with 2 year grace as has been agreed in recent negotiations. The IPPs be given an incentive to arrange better terms of debt financing. If the IPPs arrange better terms by the time of financial close, the overall impact of reduction in debt servicing be shared on yearly basis in the following ratio: Power Puchaser/Govt.: IPP = 60 : 40. ---- It is proposed that the application of withholding tax or mechanism for its collection should not be a subject of any review or alteration by NEPRA. NEPRA should allow the IRR as per 1.4 above. Tax on dividend will be treated as a normaI tax for the purposes of determination of tariff. ----Tariff through competitive process: The bidding process may be structured on either of the following two options: a ) bidding for a tariff b) Offering an up-front benchmark tariff and bidders to quote a discount on the benchmark price. ---- It is proposed that once a tariff has been arrived at through competitive biddings based on either of the processes mentioned at Para 1.9 above, it should not be subjected to further review by NEPRA. The bidding process be structured and administered by PPIB (Ministry of Water and Power) in consultation with the power purchaser (WAPDA/NTDC), Ministry of Finance and NEPRA. The bidding documents (including various formula, formats, etc.) along with evaluation criteria, be also finalized by PPIB in consultation with the same agencies. The lowest evaluated levelized tariff would be recommended to the GOP for acceptance. ---- It is proposed that NEPRA should provide complete soft and hard copies of its assumption, inputs and calculation of tariffs alongwith tariff model while announcing determinations to the concerned IPPs. This would enable better understanding of tariff decision. ---- Evaluation of Tariffs: As fuel cost is a pass through, prices of different fuels e.g. gas, oil, coal, etc, tend to distort the evaluation. Therefore levelized tariff be evaluated on the basis of capacity purchase price, efficiency (taking into account fuel cost) and O&M costs.