Meta Data
Draft: 
No
Revision of previous policy?: 
No
Draft Year: 
2009
Effective Start Year: 
2009
Effective End Year: 
2030
Scope: 
National
Document Type: 
Plan/Strategy
Economic Sector: 
Power
Energy Types: 
Coal, Power, Renewable, Hydropower
Issued by: 
Department of Energy
Overall Summary: 
The Power Development Plan (PDP) 2009-2030 highlights the plans and programs of the energy sector to fuel support for the economic growth of the country for the period 2009-2030.
Renewable Energy
RE action plans: 
In Visayas, of the 638 MW total committed power projects, 600 MW will come from coal-fired power plant and the remaining 38 MW is from renewable energy. In Mindanao, the 100.5 MW total committed projects are all renewables.
Energy Supply and Infrastructure
Energy mix: 
In Visayas, of the 638 MW total committed power projects, 600 MW will come from coal-fired power plant and the remaining 38 MW is from renewable energy. In Mindanao, the 100.5 MW total committed projects are all renewables.
Infrastructure development priorities: 
[...] In Luzon, the 600 MW coal-fired plant from GN Power will come on-stream before the end of 2012. In Visayas, of the 638 MW total committed power projects, 600 MW will come from coal-fired power plant and the remaining 38 MW is from renewable energy. In Mindanao, the 100.5 MW total committed projects are all renewables.---List of committed projects: - Luzon: 2x300MW Coal-Fired Power Plant (2012). - Visayas 3x80MW CFB Power Plant Expansion Project (2010-2011); 2x100MW Cebu Coal-Fired Power Plant (2011); 17.5MW Panay Biomass Power project (2011); Nasulo Geothermal Plant (2011); 2x80MW CFB Power Plant (2010). - Mindanao: Sibulan Hydroelectric Power (Unit I-16.5MW) (Unit II-26MW) (2010); Cabulig Mini-Hydro Power Plant (2011); Mindanao 3 Geothermal (2014).