Infrastructure development priorities:
ERC Approved Projects 1)Luzon- Luzon-Mindoro Interconnection: To provide Mindoro Island access to reliable and cheap electricity - 2013; Luzon Substation Expansion II: To provide additional transformer capacity to meet load growth - 2012; Luzon Substation Expansion III: To provide additional transformer capacity to meet load growth - 2012; Luzon Voltage Improvement II: To maintain the voltage profile at various substation within the allowable limits 2013; - Mariveles Coal transmission Reinforcement: To reinforce Hermosa-Limay B line to maintain N-1 during simultaneous maximum dispatch of Mariveles Coal and Limay plants - 2012; San Jose 500 kV Reconfiguration: To ensure the reliability of the existing ring-bus substation - 2015; San Jose Transformer Replacement Project: To ensure the reliability of the substation and to increase the substation capacity - 2010; San Jose-Balintawak Line 3: To increase transfer capacity and maintain the N-1 provision - 2013.---2) Visayas: Culasi-Sibalom 69 kV Transmission Line: To provide N-1 for the existing corridor - 2013; Sta. Rita-Quinapundan 69 kV Transmission Line: To provide N-1 for the existing corridor - 2014. ---3) Mindanao: Tacurong-Nuling 138 kV Transmission Line: To provide new transmission corridor from North Cotabato to Maguindanao - 2013.