Сводный обзор: 
These Regulations establish the Power System Development Fund, its scope and utilization.
Investment
Financial incentives for energy infrastructure: 
There shall be constituted a fund to be called the “Power System Development Fund” or "PSDF"[...].---PSDF shall be utilized for the following purposes: (a) Transmission systems of strategic importance based on operational feedback by Load Despatch Centers for relieving congestion in inter-State transmission system (ISTS) and intra-State Transmission Systems which are incidental to the ISTS. (b) Installation of shunt capacitors, series compensators and other reactive energy generates including reactive energy absorption and dynamic reactive support like static VaR compensator (SVC) and static synchronous compensator (STATCOM) for improvement voltage profile in the Grid. (c) Installation of special protection schemes, pilot and demonstrative projects, standard protection schemes and for setting right the discrepancies identified in the protection audits on regional basis. (d) Renovation and Modernization (R&M) of transmission system for relieving congestion. (e) Any other scheme/ project in furtherance of the above objectives such as technical studies, capacity building, installation of Phasor Measurement Unit (PMU) etc.
Деятельность органов власти
Energy institutional structures: 
Government of India (Ministry of Power) shall constitute an Inter-Ministerial Monitoring Committee under the Chairmanship of Secretary (Power) Government of India to be known as Monitoring Committee [...].