Meta Data
Проект документа: 
No
Пересмотр более раннего документа?: 
Yes
Год составления проекта документа: 
1975
Год вступления в силу: 
1975
Виды актов по количеству участников: 
Bilateral
Тип документа: 
Agreement
Экономический сектор: 
Power
Виды энергоресурсов: 
Power, Renewable, Hydropower
Подготовлен: 
Ministry of Water and Power, Nepal
Ссылка на документ: 
Сводный обзор: 
Through the Revised Agreement on The Kosi Project, His Majesty's Government (HMG) of Nepal and the Government of India (the Union) amended their commitment to the Kosi Project. The Agreement shall come into force from the date of signatures of the authorised representatives of HMG and the Union respectively and thereafter, it shall remain valid for a period of 199 years.
Environment
Energy-water nexus: 
HMG shall have every right to withdraw for irrigation and for any other purpose in Nepal water from the Kosi river and from the Sun-Kosi river or within the Kosi basin from any other tributaries of the Kosi river as may be required from time to time. The Union shall have the right to regulate all the balance of supplies in the Kosi river at the barrage site thus available from time to time and to generate power in the Eastern Canal.
Ценообразование
Energy pricing: 
The tariff rates for electricity to be supplied to Nepal pursuant to the provisions of this clause shall be fixed by mutual agreement.
Trade
Bi- and multi-lateral energy agreements: 
HMG shall be entitled to obtain for use in Nepal any portion up to 50 percent of the total hydro-electric power generated by any Power House situated within a 10- mile radius from the barrage site and constructed by or on behalf of the Union, as HMG shall from time to time determine and communicate to the Union: Provided that: - HMG shall communicate to the Union any increase or decrease in the required power supply exceeding 6,800 KW at least three months in advance: (iii) If any power to be supplied to Nepal pursuant to the provisions of this sub-clause is generated in a power house located in Indian territory, the Union shall construct the necessary transmission line or lines to such points at the Nepal – Indian border as shall be mutually agreed upon. (iv) The tariff rates for electricity to be supplied to Nepal pursuant to the provisions of this clause shall be fixed by mutual agreement.
Investment
Tax and duty exemptions for energy equipment: 
HMG shall charge no customs duty or duty of any kind, during construction and subsequent maintenance, on any articles and materials required for the purpose of the Project and the work connected therewith.
Деятельность органов власти
Energy institutional structures: 
For the discussion of problems of common interest in connection with the project and for purposes of co-ordination and co-operation between the two Governments with regard to any matter covered in this agreement, the two Government shall at an early date establish a joint "Indo-Nepal Kosi Project Commission".