Meta Data
Проект документа: 
No
Пересмотр более раннего документа?: 
No
Год вступления в силу: 
2011
Год окончания действия: 
2017
Виды актов по количеству участников: 
National
Тип документа: 
Plan/Strategy
Экономический сектор: 
Energy, Power
Виды энергоресурсов: 
Coal, Power, Renewable, Bioenergy, Solar, Other
Подготовлен: 
Ministry of New and Renewable Energy
Ссылка на документ: 
Сводный обзор: 
The Plan was prepared by the MNRE, covering the last year of the 11th plan and the next 5 years period of the 12th plan, and perspective till 2022. It sets out the goals of the Ministry, the strategy to be adopted by it during this period to achieve these goals and the corresponding action plan. In particular, through the SPNRES, India is promoting Renewable Energy Systems (RES). These systems are expected to meet rural energy needs, as well as to supplement energy and lighting necessities in urban areas, in industry, and commercial establishments. Also, 100 units of electricity will be provided free of cost every month to every Project Affected Family, meaning those families affected by the development of a hydro project, for a period of ten years from the date of commissioning.  
Доступ
Bi-, multi-lateral mechanisms to expand access: 
Development of entrepreneurship for rural electrification through biomass wastes, rice husk, solar, etc. and enabling availability of banks/grant funds.---The ministry will continue to work towards creation of a fund to promote effective deployment of renewable energy technologies and utilizing the same to promote development in areas of energy access.
Energy access priorities: 
Replace use of different fossil fuels wherever possible, and increase access to electricity/ lighting in remote and rural areas, through Renewable Energy Systems.---2) To promote renewable energy initiatives for: (a) Meeting energy/lighting needs in rural areas (b) Supplementing energy needs in urban areas [...].
Energy access action plan: 
Identifying niche areas for application of renewable energy (RE) technologies and reducing consumption of diesel and evolving suitable mechanisms for off-grid deployments.---the vision is to increase the possible numbers of off-grid application and villages to be covered ---Development of entrepreneurship for rural electrification through biomass wastes, rice husk, solar, etc. and enabling availability of banks/grant funds.
Energy access targets: 
The Ministry would like to cover about 10,000 villages from biomass-based systems and over 1000 villages from solar power up to 2022. ---The Ministry would like to enable distribution of over 10 million stoves for households with some limited Government support by 2022.---Improved Biomass Cook-stoves - Family 10 million - Community 0.5 million.
Clean cooking solutions: 
Incremental improvements in technologies for achieving greater efficiencies to make them more viable and acceptable, especially for solar cooling and cooking. --- Improved Cookstoves: Average subsidy @ Rs.750 per cookstove.
Consumer subsidies: 
Improved Cookstoves: Average subsidy @ Rs.750 per cookstove.
Efficiency
Приоритеты ЭЭ: 
Identifying niche areas for application of renewable energy (RE) technologies and reducing consumption of diesel and evolving suitable mechanisms for off-grid deployments.
EE targets: 
The Ministry[...] aspires to have 200 million sq. mtr. GRIHA rated buildings by 2022.---20 million solar lights are estimated to avoid use of 1 billion litres of kerosene per annum in 2020.---5 million sq. m thermal collectors are expected to save about 350 million litres fuel oil per annum in 2020.---15 million sq. m thermal collectors are expected to save 9 billion units of electricity per annum in 2020.---3,000 MW of roof top PV systems and 3,000 MW of other power plants by 2020, 50% of which will mainly be used for avoiding use of diesel during daytime for power generation, are expected to save about 1050 million litres of diesel per annum in 2020.
EE building standards: 
The Ministry wants to pursue promotion of green buildings in a mission mode and intends to undertake a huge capacity building effort in this regard. It aspires to have 200 million sq. mtr. GRIHA rated buildings by 2022.
EE public awareness/promotional programmes: 
Capacity building and awareness generation in Green buildings and campuses.
Renewable Energy
RE priorities: 
1) To promote deployment of grid interactive renewable power generation projects; 2) To promote renewable energy initiatives for: (a) Meeting energy/lighting needs in rural areas (b) Supplementing energy needs in urban areas 3) Supplementing energy needs in industry and commercial establishments 4) Human Resource Development in new and renewable energy sector 5) Putting in place suitable policy and regulatory framework at national and state levels for growth of new and renewable energy sector [...].
RE targets: 
Solar Concentrating Systems for heating /cooling applications: 100-200 – on routine basis 1000 –aspiration.---Solar Thermal collectors 20 mln. sqm.- as under Solar mission.---Solar Lighting 20 mln. households as under the Solar Mission.---Decentralised /Off-grid SPV systems: 4000 MW- aspiration- 2000 MW-under Solar Mission ---Increase the contribution of Renewable Energy in the total energy mix of the country to 6 per cent by 2022, with about 10 per cent contribution to total electricity mix, in line with IEPR projections.
RE action plans: 
Develop pilot projects for off-shore wind generation; --- Framework for robust measurement and verification (M&V) for projects and schemes: Facilitating effecting measurement and verification (M&V) of all projects under Ministry of New and Renewable Energy (MNRE’s) renewable energy programs and schemes.----Identifying niche areas for application of renewable energy (RE) technologies and reducing consumption of diesel and evolving suitable mechanisms for off-grid deployments. ---Development of entrepreneurship for rural electrification through biomass wastes, rice husk, solar, etc. and enabling availability of banks/grant funds.
RE prioritization, portfolio standards: 
Increase the contribution of Renewable Energy in the total energy mix of the country to 6 per cent by 2022, with about 10 per cent contribution to total electricity mix, in line with IEPR projections.
RE capital subsidy, grant, or rebate: 
The funds required for implementing the year-wise targets in grid and off grid renewable energy for the period 2011-17 has been summarized in table 15 and 16 attached. (refer to table 15: Funds required for Grid Interactive Renewable Power, and Table 16: Funds required for Off-Grid Renewable Energy (RE) applications). --- Biomass/Agri Waste: Continuation of existing subsidy @~ Rs. 8-10 lakh/ MW depending on capacity of the project. 58; Bagasse Cogen: Subsidy @ Rs. 30 – 50 lakh per MW (surplus power) for cooperative sector sugar mills, depending on boiler pressure; incl. Buy Own Operate Transfer (BOOT) projects. ; U&I Energy: Average subsidy @Rs.1.5 crore/MW ; Small Hydro Power (SHP): Subsidy of an average 10-20% of project cost. More funds would be required during 2012-13 and 2013-14 for special projects in Arunachal Pradesh and Ladakh where 100% financial support is provided. ; Wind: Generation based incentive @Rs.0.50 per kWh. Funds requirement calculated for capacities installed in previous years; committed liabilities under the Generation Based Incentives (GBI) scheme to continue for next 10 years. Annual generation of 2 million units per MW per year. ; Solar: The requirement of funds is based on – (i) Commitment towards 100 MW projects of phase-I sanctioned in 2010-11 @ Rs.12.41 per unit, calculated for 1.66 million units per MW per year for 20 years. (ii) 1000 MW projects of phase-I through bundling by Vidyut Vyapar Nigam Limited (NVVN); no subsidy (iii) Commitment towards new phase-II projects of 1,000 MW sanctioned at 2013-14 tariff, 1,100 MW at 2014-15 tariff, 400 MW at 2015-16 tariff and 400 MW at 2016-17 tariff, all calculated for 1.66 million units per MW per year for 20 years. (iv) The tariff is likely to reduce to Rs.11.80 per kWh in 2013-14, Rs.11.00 per kWh in 2014-15, Rs.10.00 in 2015-16 and Rs.9.00 per kWh in 2016-17. However, the exact tariffs and consequently the commitments will depend on the actual tariffs to be fixed by Central Electricity Regulatory Commissions (CERC) in respective years/outcome of bidding process. **committed liabilities will continue for a total duration of 25 years co-terminus with the Central Electricity Regulatory Commission (CERC) tariff validity period. --- Micro-hydel/ Water mills: Continuation of Subsidy Rs.1 lakh per Water mill. ; Solar Thermal systems for water heating etc: National Solar Mission (NSM) Average Capital Subsidy @Rs.3,500 per sq.m. for 1/3rd of deployment; Interest and Capital Subsidy @ Rs.4,000 /sqm. and refinancing @ Rs. 5,000/sq. m for another 1/3rd of deployment and rest 1/3rd without subsidy. ; Urban Waste-to-Energy (WTE) Plants: Subsidy @ Rs.1-3 crore/MWe depending upon technology; 20% higher in Special Category States. ; Industrial Waste-to- Energy (WTE)/ Bio power in Industry: Subsidy @ Rs.0.2-1.0 crore/MWe depending upon technology; 20% higher in Special Category States. ; Improved Cookstoves: Average subsidy @ Rs.750 per cookstove.
Cooperation in RE: 
6) Fostering International Cooperation in new and renewable energy sector.
Energy Supply and Infrastructure
Energy supply priorities: 
Aspiration 1. To enhance coal production through government PSUs by taking up new projects/ expanding existing projects as well as through the captive mining route. 2. To aim at supply of adequate quantity of quality coal to meet the demand of all sectors at reasonable prices. 3. To adopt state‐of‐the‐art technology and clean coal technology in coal mining with a view to improving productivity, safety, quality and the ecology. 4. To expedite bringing all the available coal resources in the country into the proved category through detailed drilling. 5. To mechanise, modernise and develop necessary infrastructure of rail network, ports and roads for efficient and speedy evacuation of all the coal produced. 6. To acquire and develop coal assets abroad in keeping with the energy security needs of the country.
Энергетическая смесь: 
Increase the contribution of Renewable Energy in the total energy mix of the country to 6 per cent by 2022, with about 10 per cent contribution to total electricity mix, in line with IEPR projections.
Infrastructure development priorities: 
1) To promote deployment of grid interactive renewable power generation projects.
Investment
Energy sector investment priorities: 
To encourage development of a robust manufacturing industry in renewable energy sector.
Financial incentives for energy infrastructure: 
Developing and deploying appropriate financial instruments: Alternate financial instruments: equity support/debt, loan guarantees/partial risk guarantees.---The ministry will continue to work towards creation of a fund to promote effective deployment of renewable energy technologies and utilizing the same to promote development in areas of energy access. --- (refer to table 16 funds required for Off-Grid Renewable Energy (RE) application (Rs./crore in attached document) (refer to table 15: Funds required for Grid Interactive Renewable Power in the attached document) The funds required for implementing the year-wise targets in grid and off grid renewable energy for the period 2011-17 has been summarized in table 15 and 16 of the document.
Investment climate development: 
The Ministry will continue to urge the banking and financing community to support the renewable energy sector in the light of the current problems that affect development of the sector.
Public Private Partnerships: 
Support to (State Nodal Agencies) SNAs to take up revenue generation activities through PPP projects.
Деятельность органов власти
Energy management principles: 
13) Enhancing the capability of States especially in implementation of renewable energy programmes: Strengthening areas of capacity building and availability of technical manpower.---3) Enhancing the capability of States especially in implementation of renewable energy programmes: Strengthening areas of capacity building and availability of technical manpower.
M&E of policy implementation: 
The Ministry will undertake the following activities for ensuring effective implementation of the outlined Strategic Plan: a. Quarterly Review Meetings with State Governments and concerned Stakeholders b. Monthly Reporting Systems for specific Programs under a standard format providing information of funds utilized, progress made on commissioned projects, hourly/monthly output from systems (wherever relevant/required), etc c. Development of independent Monitoring and Verification Systems d. Strengthening IT systems for reporting of Measurement and Verification (M&V) status of specific programs
Public database availability: 
Resource base development : creation/updating/expansion of existing data base on resource assessment
Technology
Clean energy technology priorities: 
Undertaking resources assessment and potential estimation studies for new and renewable sources of energy.--- 9) Incremental improvements in technologies for achieving greater efficiencies to make them [renewable energy technologies] more viable and acceptable, especially for solar cooling and cooking.---The Ministry will continue to work closely with the Regulatory Agencies at the centre and state level with regard to promoting a facilitative framework for promotion of renewable energy technologies. This will include issues relating to tariff for renewable energy technology based power projects, renewable purchase obligations and measures like renewable energy certificated and other market based mechanisms, market and grid connectivity issues, inter-state exchange of renewable energy.---For PV, the thrust areas are: development of silicon and other materials, efficient solar cells, thin film materials, concentrating PV technology, PV system design with the objective of significantly reducing the ratio of capital cost to power generation, etc. For Solar Thermal, the thrust areas are development of technologies for power generation, industrial process heat systems, solar cooling; technology improvement for various low temperature applications viz. solar water heating, solar cooking, etc. ---Biomass also has short term priorities, though largely developed but improvements in gasification, various sizes of engines, boiler, etc for various feed-stocks are needed. This is ongoing.---In the longer term, hydrogen has great potential – production, storage and distribution. R&D in these areas has to be strengthened.
Clean energy technology deployment: 
Identifying niche areas for application of renewable energy (RE) technologies and reducing consumption of diesel and evolving suitable mechanisms for off-grid deployments. [...] ---Demonstration projects for new technologies such as solar thermal hybrid for small plants, rice straw boilers, pine needles based gasifers solar thermal gas hybrids and solar thermal with storage for large plants. [...]---Promoting energy plantations of fast growing species of bamboo/other trees to provide feed stock for small capacity biomass power plants for captive/local use. [...] ---Promote concept of small power plants at tail end of grid for both solar and biomass and developing financial support structures.
R&D renewable energy: 
8) Supporting Research and development related activities/projects taken up by institutions and industry---To promote research, design and development activities at premier national institutions and industries on different aspects of new and renewable energy technologies and help development of new products.