Meta Data
Проект документа: 
No
Пересмотр более раннего документа?: 
No
Год составления проекта документа: 
1994
Год вступления в силу: 
1994
Виды актов по количеству участников: 
National
Тип документа: 
Overarching Policy
Экономический сектор: 
Power
Виды энергоресурсов: 
Power, Renewable, Geothermal, Hydropower, Solar, Wind, Other
Подготовлен: 
Ministry of Power
Сводный обзор: 
Accordingly, the Government of Pakistan has devised an attractive policy package for attracting overseas investment and to facilitate the tapping of the domestic capital market to raise local financing for power projects. The main characteristics of this package are internationally competitive terms, attractive framework for domestic investors, reduction in local currency investment requirements, simplification of procedures, and steps to create and encourage a domestic corporate debt securities market.
Efficiency
Приоритеты ЭЭ: 
[...] the Government will pro-actively support and promote development of energy-efficient generation capacity in the industrial sector through preparation of feasibility reports in respect of energy-efficient generation technologies such as combined cycle gas turbine, gas-diesel plants and thermal plants using agricultural wastes as fuel.
Ценообразование
Energy pricing: 
The Government of Pakistan offers a Bulk Power Tariff of US Cents 6.5/kWh (to be paid in Pak Rupees) as an average for first ten years for sale of electricity to WAPDA/KESC. ---- A levelized tariff of US Cents 5.9/kWh (Rs. 1.776kWh) over life of the project has also been calculated as a final parameter for acceptance of the tariff. It will provide flexibility to the Sponsors to work out year-wise tariff (resulting into the required levelized tariff) which match their annual debt service requirements. ---- The Bulk Power Tariff will apply to all BOO thermal power projects, all hydro projects upto 20MW and all other projects based on non-conventional/renewable energy sources. In case of hydel units, the levelized tariff will be applicable for the first 30 years of the project life. ---- For hydro projects exceeding 20 MW, the tariff will be decided on project to project basis on a 25% rate of return on equity. ---- The tariff of US Cents 6.5/kWh is an indicative tariff which has been calculated on an annual plant factor of 60%. The actual payment of the tariff will comprise two components, i.e. Capacity Price and Energy Price.---- The Sponsors of private power projects will provide their year-wise tariff profile for the life of the project. The tariff will be acceptable if: i) the average tariff for the first ten years does not exceed US Cents 6.5/kWh (Rs 1.952kWh) ii) The annual base tariff does not exceed US Cents 8.33/kWh (Rs.2.5/kWh) in the first year and US Cents 6.66/kWh (Rs 2/kWh) in any subsequent year. ---- The levelized tariff for the life of the project does not exceed US Cents 5.91/kWh (Rs.1.766/kWh)
Investment
Investment climate development: 
The Government has established a Private Sector Energy Development Fund (PSEDF) with the assistance of the World Bank, USAID and other multilateral lending agencies, which may provide up to 40% of the Capital Costs of the project, currently at a fixed interest rate of 14% per annum with a maturity period of up to 23 years including a grace period of up to 8 years.