Meta Data
Title in national language: 
中华人民共和国电力法
Draft: 
No
Revision of previous policy?: 
No
Draft Year: 
1995
Effective Start Year: 
1996
Scope: 
National
Document Type: 
Law
Economic Sector: 
Power
Energy Types: 
Power, Renewable
Issued by: 
China National People's Congress
Overall Summary: 
This Law applies to activities concerning the construction, generation, supply and consumption of electric power.
Access
Energy access priorities: 
The State assists and supports minority nationality regions, outlying areas and poverty-stricken areas in their efforts to develop their electric power industry. --- The State adopts a preferential policy regarding electrification in the countryside and provide special support to rural power construction in areas inhabited by minority nationalities, in outlying areas and in poverty-stricken areas
Energy access action plan: 
The people's governments of provinces, autonomous regions, and municipalities directly under the Central Government should work out plans for electrification in the countryside and include the plans in those for local electric power development and for national economic and social development.
Energy service quality targets: 
The power-supply enterprise shall guarantee that the quality of the electricity it supplies to the consumers meets the standards stipulated by State. Problems of electricity quality caused by public power-supply facilities shall be solved without delay. Where consumers raise special requirements concerning electricity quality, the power-supply enterprise shall satisfy the requirements according to necessity and the possible capacity of the power network.
Renewable Energy
RE priorities: 
The State encourages and supports the generation of electricity through the use of renewable and clean energy resources.
Environment
Energy environmental priorities: 
In the construction, generation, supply and consumption of electric power, attention shall be paid to protecting the environment according to law and adopting new technology to decrease the discharge of poisonous waste, prevent and control pollution and other public hazards.
Land use change for energy production purposes: 
Land use for power construction projects shall be handled in accordance with relevant laws and administrative rules and regulations. No requisi-tion of land shall be regarded as legal until land compensation fees and settlement allowances have been paid and necessary arrangements have been made for the residents who moved away. -- In power construction the principles of giving practical protection to cultivated land and economizing on land use shall be applied.
Pricing
Energy pricing: 
The rates of electricity shall be based on a centralized policy, fixed in accordance with a unified principle and administered at different levels. -- A principle of equal rates for equal quality of electricity supplied by the same power network shall be applied with regard to incorporation into a power network. Specific measures for its application shall be formulated by the State Council. --Where different rates for incorporation into a power network are needed to be fixed for power-generating enterprises under special circumstances, specific measure shall be formulated separately by the State Council. -- With regard to the rates for incorporation into independent power networks, a plan shall be proposed through consultation by the enterprises engaged in power generation and in power network operation and shall be examined for approval by the authorized department in charge of price control. -- For power generated by locally-funded enterprises that form independent power networks in different areas of a province or that generate power for their own use, the rates shall be under the control of the people's government of the province, autonomous region or municipality directly under the Central Government. --For the sales rates of electricity supplied by an independent power network, a plan shall be proposed by the network operation enterprise and be examined for approval by the authorized department in charge of price control.
Energy Supply and Infrastructure
Infrastructure development priorities: 
In the plans for electric power development should be embodied the principles of making rational use of energy resources, coordinating the development of power supply and power networks, increasing economic results and benefiting environmental protection.
Investment
Energy sector investment priorities: 
The State encourages and provides guidance to lawful investment in the development of power resources and establishment of power-generating enterprises by economic organizations or individuals at home and abroad. The principle of "whoever invests, benefits" shall be applied with regard to investment in the power industry.
Governance
Energy institutional structures: 
The electric power administration department under the State Council shall be responsible for supervision and control of the electric power industry throughout the country. The departments concerned under the State Council shall be responsible for supervision and control of the electric power industry within their own limits of authority. The department in overall charge of the economy under the local people's government at or above the county level is the electric power administration department of that administrative region and shall be responsible for supervision and control of the electric power industry there. The departments concerned under the local people's government at or above the county level shall be responsible for supervision and control of the electric power industry within their own limits of authority. -- Investors in electric power shall enjoy legal rights and interests with regard to the power generated with the help of their investment. They shall have priority in the use of the power incorporated into the power networks and authority over the control over and use of the power plants for self-supply that are not incorporated in power networks.