Meta Data
Draft: 
No
Revision of previous policy?: 
No
Effective Start Year: 
2004
Scope: 
National
Document Type: 
Other
Economic Sector: 
Power
Energy Types: 
Power
Issued by: 
Gabinete para el Desenvolvimiento do Sector Energético do Governo da RAEM
Notes: 
No English version available
Overall Summary: 
This Executive Order provides for new paramenters for electricity tariffs for the groups A, B, and C as provided under the Decree-Law n.º 35/86 / M. In particular, it establishes a reduction in tariffs. Indeed, according to the Executive Order 23/2004, the evolution of the results and performance of the concessionaire since the last tariff readjustments occurred in February 2000 and 2001, allows, in a sustainable manner, to reduce tariffs. In this sense, the concessionaire has formulated a proposal for a tariff reduction of 3%, which is considered adequate.
Pricing
Energy pricing: 
The following values are set for the parameters laid down in Article 3 of Decree-Law No. 35/86 / M , of 30 August, for group rates A: 1. Subgroup A1 1) the parameter (contracted apparent power charge): - apparent contracted power equal to or less than 3.3 kVA: ax Sc = $ 8.224 - apparent contracted power exceeding 3,3kVA but less than or equal to 6.6 kVA: ax Sc = $ 18.796 - apparent power exceeding contracted to 6.6 kVA: a = 3,526 (MOP/kVA) 2) b Parameter (active energy charge): b = 0,963 (MOP/kWh) 2. Subgroup A2 1) the parameter (contracted apparent power charge): a = 0 (MOP/kVA) 2) b Parameter (active energy charge): b = 0,858 (MOP/kWh) 3. Subgrupo A3 1) the parameter (contracted apparent power charge): Identical to the subgroup A1 2) b Parameter (active energy charge): b = 0,884 (MOP/kWh) 4. Subgrupo A4 1) the parameter (contracted apparent power charge): a = 0 (MOP/kVA) 2) b Parameter (active energy charge) b = 0,429 (MOP/kWh)* * Equal to 0.50 by the value of parameter b defined in point 2) of paragraph 2 of this article. [...] Tarifas su grupo B 1. They are set the following values for the parameters laid down in Article 3 of Decree-Law No. 35/86 / M , of 30 August, for rates of group B: 1) Parameter c (active power burden): - For subgroup B1: c = 19,797 (MOP/kW) - For the sub - groups B2 and B3, including the additional laid down in Article 17 of Decree-Law No. 35/86 / M , of 30 August: c = 21,484 (MOP/kW) 2) Parameter d (active energy charge in the "full time"): d = 0,874 (MOP/kWh) 3) and parameter (the active energy charge "off-peak"): e = 0,767 (MOP/kWh) 4) Parameter f (power charge in the "full time"): f = 0,348 (MOP/kVarh) 5) Parameter g (power charge on 'off-peak'): g = 0,116 (MOP/kVarh) 6) Parameter k (weighting factor): k = 0.20 2 are considered "full time" eleven arising between 9.00 h and 20.00 h, considering the "peak hours" the remaining thirteen hours of the day.---Consumers group C is applied binomial rate structurally identical to the group B, also with reactive power penalty, but differing in numerical value of the charge power as well as the determination mode, under certain conditions, the power burden and reactive power. [...] Please, see the document for details.