Meta Data
Draft: 
No
Revision of previous policy?: 
No
Draft Year: 
2017
Effective Start Year: 
2018
Effective End Year: 
2027
Scope: 
National
Document Type: 
Plan/Strategy
Economic Sector: 
Power
Energy Types: 
Power, Gas
Issued by: 
Georgian Oil & Gas Oil Corporations
Notes: 
Unofficial source
Overall Summary: 
The document represents a 10-year Georgian gas transmission and related development plan. It was prepared on the basis of 2016 and 2017 year editions of “10-Year Development Plan for Georgian Gas Transmission)’’, and in accordance with the requirements of Directive 2009/73/EC concerning common rules for the internal market in natural gas and Directive 2004/67/EC concerning measures to safeguard security of natural gas, supply considering the actual situation of current period. The plan has different objectives as follows: a) endeavors to capture the transport infrastructure rehabilitatation/ reconstruction projects of the period between 2018 and 2027; b) addresses the identification of the projects to be implemented in 2018 with secured financing as well as the projects to be implemented in the next two years; c) presents a 10-year timeline for the implementation of the investment projects and the possible sources of financing such projects In particular, the Plan addresses the Georgian natural gas sector, the Regional natural gas market, infrastructure development plans and investment plans.
Access
Energy access priorities: 
The purpose of the 10-year Natural Gas Network Development Plan is to ensure guaranteed gas supply to consumers at present and on a long-term basis, and promote the formation of internal and regional markets based on EU energy legislation through the rehabilitation/development and stable operation of the internal transmission, transborder and transit infrastructure.
Energy Supply and Infrastructure
Energy supply priorities: 
The investment infrastructure projects to be developed on a priority basis in the shortand partly medium-term include: the rehabilitation and construction of the main pipeline critical sections [...] Besides, the updated system gives opportunity to provide uninterrupted supply of demanded gas during peak loading periods in the future until year 2030.
Infrastructure development priorities: 
The investment infrastructure projects to be developed on a priority basis in the shortand partly medium-term include: the rehabilitation and construction of the main pipeline critical sections (among them mainly certain sections of the East-West direction from Saguramo to Zestafoni). ---Ptsa-Vaka-Chorchana 17 km length (project will start in 2017) –2018;  Natakhtari-Lekhura 31.4 km section (project will start in 2017) – year 2018;  Lekhura-Sveneti 20.6 km length section – years 2018-2019;  Aerial crossing on riv. Aragvi – years 2018-2019;  Chorchana-Zestafoni about 70 km length section – years 2018-2020;---Construction of the underground gas storage is one of the most important infrastructure projects of the country. Implementation of the project will ensure supply of planned increasing volume of natural gas, seasonal distribution and rational consumption. Consequently, a decision was made on the construction of a strategic underground gas storage in Georgia, on the base of Samgori's Southern Dome oil field.