Meta Data
Проект документа: 
No
Пересмотр более раннего документа?: 
No
Год составления проекта документа: 
2008
Год вступления в силу: 
2009
Год окончания действия: 
2013
Виды актов по количеству участников: 
National
Тип документа: 
Plan/Strategy
Экономический сектор: 
Power
Виды энергоресурсов: 
Power, Renewable, Solar, Other
Подготовлен: 
Electric Power Industry Management Bureau Department of Energy
Ссылка на документ: 
Сводный обзор: 
The 2009 Missionary Electrification Development Plan (MEDP) sets out the government’s plan to implement policies and programs to sustain the provision of adequate, reliable, and efficient supply of electricity in missionary or off-grid areas and to enable communities in those areas receive the benefit of electrification. The 2009 MEDP covers two major components, namely: missionary generation and remote area electrification. NOTE: SPUG Small Power Utilities Group; QTPs qualified third parties; DUs distribution utilities.
Доступ
Energy access action plan: 
Missionary and offgrid electrification will be implemented through the extension of distribution lines of electric cooperatives or installation of isolated mini or micro-grids or decentralized systems in the small islands and unviable areas. The component projects are: 1. SPUG’s 14 diesel micro-grid projects in Camarines Sur, Masbate and Samar; 2. SPUG’s 42 Barangay Electrification Projects; 3. 24 LGU-served areas for conversion to QTP management; 4. QTP initiatives a. Philippine Rural Electrification Service (PRES) Project in Masbate b. PowerSource electrification projects in Rio Tuba, Bataraza, Palawan and Malapascua Island, Bantayan, Cebu; 5. Household Electrification Program.---For decentralized systems, the provision of electricity services includes mini- or micro-grids either diesel-fired or micro-hydro [...].------Philippine Rural Electrification Service (PRES) Project: This project aims to improve the living conditions of a total of 18,000 households located in 128 barangays in Masbate through the provision of adequate and reliable energy services Electricity will be provided through a mixture of diesel-powered micro-grids and household photovoltaic systems. ---PowerSource’s Malapascua Island Electrification Project: It will install 3 x 50-kw medium-speed bunker C-fired generating sets which will be completed in 2008. Another 200- kW biomass gasification capacity will be installed in 2009. The firm will also investigate the viability of 80-150kW of wind capacity in 2009-2010 for additional fuel supply in the island.
Energy access targets: 
Consistent with the overall objective of total barangay electrification in 2010 and 90% household electrification in 2017, all remaining unelectrified barangays in the country [...] will be provided with electricity service. ---Philippine Rural Electrification Service (PRES) Project: This project aims to improve the living conditions of a total of 18,000 households located in 128 barangays in Masbate [...].The installation of the facilities will be undertaken over a three-year period. [...] 26 minigrids will be completed before end of 2008. ---PowerSource’s Malapascua Island Electrification Project: [...] The project will serve a total of 650 households with 24-hour electricity service [...].---Household Electrification Support Program: [...] 200,000 households in off-grid areas will be provided with solar home systems (SHS).
Renewable Energy
RE priorities: 
Harnessing of area-based renewable energy resources for decentralized power generation will [...] be a top priority.
RE targets: 
Household Electrification Support Program: [...] 200,000 households in off-grid areas will be provided with solar home systems (SHS).
RE capital subsidy, grant, or rebate: 
Household Electrification Support Program: [...] Subsidies will be provided to such households as price discount to reduce the cost of the PV systems.
Energy Supply and Infrastructure
Infrastructure development priorities: 
In support of the generation activities, associated delivery systems such as transmission lines and substation facilities will be constructed in ten areas: Catanduanes, Oriental Mindoro and Occidental Mindoro, Masbate, mainland Palawan, Tablas Island, Bantayan Island, Siquijor, Sultan Kudarat, Siasi and Basilan.---Missionary and offgrid electrification will be implemented through the extension of distribution lines of electric cooperatives or installation of isolated mini or micro-grids or decentralized systems in the small islands and unviable areas. The component projects are: 1. SPUG’s 14 diesel micro-grid projects in Camarines Sur, Masbate and Samar; 2. SPUG’s 42 Barangay Electrification Projects; 3. 24 LGU-served areas for conversion to QTP management; 4. QTP initiatives a. Philippine Rural Electrification Service (PRES) Project in Masbate b. PowerSource electrification projects in Rio Tuba, Bataraza, Palawan and Malapascua Island, Bantayan, Cebu; 5. Household Electrification Program.---Harnessing of area-based renewable energy resources for decentralized power generation will [...] be a top priority.---PowerSource’s Malapascua Island Electrification Project: It will install 3 x 50-kw medium-speed bunker C-fired generating sets which will be completed in 2008. Another 200- kW biomass gasification capacity will be installed in 2009.
Investment
Investment climate development: 
[...] the business of NPC-SPUG in missionary electrification is and will be not in competition, priority and prejudice against private investors.
Деятельность органов власти
National policy structure: 
To minimize if not avoid the take-over by SPUG of areas currently served by LGUs or DUs, the DOE will set the policy and guidelines to ensure reasonable but sustainable services to such areas.
Technology
Clean energy technology deployment: 
PowerSource’s Malapascua Island Electrification Project: The firm will also investigate the viability of 80-150kW of wind capacity in 2009-2010 for additional fuel supply in the island.